Planning application
25 Dungannon Road Ballygawley
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Replacement dwelling and garage, including demolition of existing dwelling and outbuildings and creation of new vehicular access and lane.
As published by the council, reference LA09/2026/0012/F
Application record
- Reference
- LA09/2026/0012/F
- Type
- Full
- Status
- Awaiting decision
- Received
- 9 Jan 2026
- Validated
- 12 Jan 2026
- Ward
- Ballygawley
- Parish
- Clogher Valley
- Decision by
- Committee Decision
Timeline
Dates from the published record
-
9 Jan 2026
Received by Mid Ulster
-
12 Jan 2026
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Ulster took a median of 106 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
33 documents on file for this application
- AMENDED PLANS RECEIVED (BULK)
- SITE LOCATION PLAN 01 REV 1
- ROADS DEVELOPMENT CONTROL DEPARTMENT FOR INFRASTRUCTURE
- PLANNING RESPONSE TEAM DAERA EMFG AND NIEA
- STANDARD CONSULTATION LETTER
- BAT MITIGATION STRATEGY
- STANDARD CONSULTATION LETTER
- INFORMATION REQUEST
- BAT SURVEY
- EMAIL FROM AGENT
- PROPOSED SITE PLAN
- REVISED BLOCK PLAN
- SITE PLAN
- ROADS DEVELOPMENT CONTROL DEPARTMENT FOR INFRASTRUCTURE
- ROADS DEVELOPMENT CONTROL DEPARTMENT FOR INFRASTRUCTURE
- ROADS DEVELOPMENT CONTROL DEPARTMENT FOR INFRASTRUCTURE
- CONSULTATION LETTER REMINDER
- DEPARTMENT FOR INFRASTRUCTURE RIVERS
- STANDARD NN LETTER (BULK)
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- ACKNOWLEDGE APP AND FEE RECEIPT
- SITE LOCATION 01
- PROPOSED SITE PLAN 02
- PROPOSED FRONT AND SIDE ELEVATIONS 05
- PROPOSED GROUND FLOOR PLAN 03
- PROPOSED SECTIONS 07
- TOPOGRAPHICAL SURVEY 08
- PROPOSED FRONT AND REAR ELEVATIONS 06
- PROPOSED FIRST FLOOR PLANS 04
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided full applications in a median of 115 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land 100M East of Junction of Armaghlughey Road and Dungannon/Ballygawley Road, Ballygawley
96% historically approved · decision due ~21 Jul
Site for replacement dwelling outside of existing curtilage
Awaiting decision Outline 8 docsDomestic
Other full applications
In Mid Ulster
-
LA09/2026/0805/F Decided
Reid Engineering Ltd Kilcronagh Industrial Estate Cookstown BT80 9HG
Proposed relocation of existing entrance at Kilcronagh Industrial Estate, Cookstown, BT80 9H
-
LA09/2026/1126/F Awaiting decision
49 Church Street Cookstown BT80 8HT
Retention of single storey rear replacement extension with internal alterations to dwelling
-
LA09/2025/0520/F Decided
2 Lisnamuck Road Tobermore BT45 5QF
Production facility shed for the manufacture of decorative paving and walling products
-
LA09/2026/0726/F Decided
Dwelling Known As 80 Aghafad Road (by Applicant) 77 Aghafad Road (postal Address On Maps) Pomeroy BT70 2TR
Extension and alterations to dwelling
-
LA09/2025/0955/F Decided
Lands approximately 80M South of 39 Castle Road Cookstown Tyrone BT80 8TN
3 No. Glamping Pods, Parking, Landscaping and Associated Site Works