Planning application
31 Forgetown Road Maghera
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Off site replacement dwelling with existing dwelling to be retained as domestic storage building
As published by the council, reference LA09/2025/1270/F
Application record
- Reference
- LA09/2025/1270/F
- Type
- Full
- Status
- Awaiting decision
- Received
- 10 Dec 2025
- Validated
- 10 Dec 2025
- Ward
- Lower Glenshane
- Parish
- Carntogher
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
10 Dec 2025
Received by Mid Ulster
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 4 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Ulster took a median of 106 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
- SHARED ENVIRONMENTAL SERVICE
- PLANNING RESPONSE TEAM DAERA EMFG AND NIEA
- CONSULTATION LETTER REMINDER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- NIBC
- DFI ROADS MAGHERAFELT TEAM 2
- EMAIL FROM AGENT
- STANDARD NN LETTER (BULK)
- HRA
- STANDARD CONSULTATION LETTER
- SITE LOCATION MAP 01
- SITE LAYOUT 02
- PROPOSED PLANS AND ELEVATIONS 03
- APPLICATION FORM
- ACKNOWLEDGE APP AND FEE RECEIPT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided full applications in a median of 115 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
77 Five Mile Straight Maghera BT46 5LQ
100% historically approved · decision due ~30 Jul
Retrospective extension to existing factory production shed to create deliveries, storage and dispatch area, boiler house, offices and staff facilities, as well as 3.5m high soil bund.
Awaiting decision Full applications Extension 27 docsSmall domestic
Other full applications
In Mid Ulster
-
LA09/2026/0805/F Decided
Reid Engineering Ltd Kilcronagh Industrial Estate Cookstown BT80 9HG
Proposed relocation of existing entrance at Kilcronagh Industrial Estate, Cookstown, BT80 9H
-
LA09/2026/1126/F Awaiting decision
49 Church Street Cookstown BT80 8HT
Retention of single storey rear replacement extension with internal alterations to dwelling
-
LA09/2025/0520/F Decided
2 Lisnamuck Road Tobermore BT45 5QF
Production facility shed for the manufacture of decorative paving and walling products
-
LA09/2026/0726/F Decided
Dwelling Known As 80 Aghafad Road (by Applicant) 77 Aghafad Road (postal Address On Maps) Pomeroy BT70 2TR
Extension and alterations to dwelling
-
LA09/2025/0955/F Decided
Lands approximately 80M South of 39 Castle Road Cookstown Tyrone BT80 8TN
3 No. Glamping Pods, Parking, Landscaping and Associated Site Works