Planning application
Lands adjacent to No's 2-10 Remeen, Ballygawley Dungannon
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Housing development consisting of 8 No. Dwellings (6 semi-detached and 2 detached) with associated site works (Amended Description)
As published by the council, reference LA09/2025/1167/F
Application record
- Reference
- LA09/2025/1167/F
- Type
- Full
- Status
- Awaiting decision
- Received
- 10 Nov 2025
- Validated
- 10 Nov 2025
- Ward
- Ballygawley
- Parish
- Clogher Valley
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
10 Nov 2025
Received by Mid Ulster
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Ulster took a median of 106 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
53 documents on file for this application
- FURTHER INFORMATION REPORT
- DFI ROADS DUNGANNON TEAM 1
- EMAIL FROM AGENT DISCUSSING RIGHT HAND TURNING LANE
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- PSD 03 REV 2
- SITE LAYOUT 02 REV 2
- BOUNDARY DETAILS 09
- EMAIL FROM AGENT
- DFI ROADS DUNGANNON TEAM 1
- AMENDED PLANS RECEIVED (BULK)
- STANDARD CONSULTATION LETTER
- SITE LAYOUT 02 REV 1
- CONCEPT PLAN 08
- PSD 03 REV 1
- BIODIVERSITY CHECKLIST
- NORTHERN IRELAND WATER DEVELOPER SERVICES
- STANDARD CONSULTATION LETTER
- ENVIRONMENTAL HEALTH MID ULSTER DISTRICT COUNCIL
- REVISED PDE
- REVISED PDE
- NORTHERN IRELAND WATER DEVELOPER SERVICES
- DEPARTMENT FOR INFRASTRUCTURE RIVERS
- PLANNING RESPONSE TEAM DAERA EMFG AND NIEA
- DFI ROADS DUNGANNON TEAM 1
- SITE LAYOUT
- PSD PLAN
- STANDARD CONSULTATION LETTER
- STANDARD NN LETTER (BULK)
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- SITE LOCATION 01
- PROPOSED SITE LAYOUT 02
- PROPOSED FLOOR PLANS AND ELEVATIONS-SEMI-DETACHED 04
- PROPOSED FLOOR PLANS AND ELEVATIONS-DETACHED 05
- EXISTING SITE SURVEY 07
- BIODIVERSITY CHECKLIST
- TRANSPORT ASSESSMENT
- DRAINAGE ASSESSMENT
- ROAD DETAILS 06
- PROPOSED SITE LAYOUT 03
- PRE-DEVELOPMENT ENQUIRY RESPONSE FROM NI WATER
- LETTER FROM NI WATER
- APPLICATION FOR PLANNING PERMISSION
- ACKNOWLEDGE APP AND FEE RECEIPT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided full applications in a median of 115 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Opposite 18 Pinewood Manor Ballygawley
100% historically approved · decision due ~31 Mar
Dwelling
Awaiting decision Full applications 22 docsDomestic -
205 Tullyvar Road Ballygawley
97% historically approved · decision due ~3 Mar
Ground floor rear and side extension
Awaiting decision Heritage and listed buildings Extension 13 docs -
205 Tullyvar Road Ballygawley
100% historically approved · decision due ~17 Feb
Ground floor rear and side extension
Awaiting decision Full applications Extension 14 docs
Other full applications
In Mid Ulster
-
LA09/2026/0805/F Decided
Reid Engineering Ltd Kilcronagh Industrial Estate Cookstown BT80 9HG
Proposed relocation of existing entrance at Kilcronagh Industrial Estate, Cookstown, BT80 9H
-
LA09/2026/1126/F Awaiting decision
49 Church Street Cookstown BT80 8HT
Retention of single storey rear replacement extension with internal alterations to dwelling
-
LA09/2025/0520/F Decided
2 Lisnamuck Road Tobermore BT45 5QF
Production facility shed for the manufacture of decorative paving and walling products
-
LA09/2026/0726/F Decided
Dwelling Known As 80 Aghafad Road (by Applicant) 77 Aghafad Road (postal Address On Maps) Pomeroy BT70 2TR
Extension and alterations to dwelling
-
LA09/2025/0955/F Decided
Lands approximately 80M South of 39 Castle Road Cookstown Tyrone BT80 8TN
3 No. Glamping Pods, Parking, Landscaping and Associated Site Works