Planning application
69 Coalisland Road Dungannon BT71 6LA
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Retention of Extension to Rear of Existing Assembly building
As published by the council, reference LA09/2025/0993/F
Application record
- Reference
- LA09/2025/0993/F
- Type
- Full
- Status
- Awaiting decision
- Received
- 24 Sep 2025
- Validated
- 24 Sep 2025
- Ward
- Mullaghmore
- Parish
- Dungannon
- Decision by
- Delegated Decision
- Postcode
- BT71 6LA
Timeline
Dates from the published record
-
24 Sep 2025
Received by Mid Ulster
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Ulster took a median of 106 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Mallaghan Engineering LTD Applicant, an engineering consultancy registered in Co Tyrone
Active · incorporated 1986 · Co Tyrone
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
27 documents on file for this application
- GEOLOGICAL SURVEY NORTHERN IRELAND
- GENERIC QUANTITIVE RISK ASSESSMENT
- STANDARD CONSULTATION LETTER
- DEPARTMENT FOR INFRASTRUCTURE RIVERS
- STANDARD CONSULTATION LETTER
- EMAIL FROM AGENT
- LETTER TO DFI RIVERS
- DEPARTMENT FOR INFRASTRUCTURE RIVERS
- STANDARD CONSULTATION LETTER
- DRAINAGE ASSESSMENT
- RETAINING WALL 06
- ENVIRONMENTAL HEALTH MID ULSTER DISTRICT COUNCIL
- DEPARTMENT FOR INFRASTRUCTURE RIVERS
- DFI ROADS DUNGANNON TEAM 1
- GEOLOGICAL SURVEY NORTHERN IRELAND
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD NN LETTER (BULK)
- ACKNOWLEDGE APP AND FEE RECEIPT
- SITE LOCATION PLAN 01
- SITE LAYOUT 02
- PROPOSED ELEVATIONS 04
- PROPOSED FLOOR PLANS 03
- PROPOSED SECTIONS 05
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided full applications in a median of 115 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Within The Grounds Of St Malachy's Gaa Club And Adjacent To Coalisland Road Dungannon
Proposed erection of a Practice Ball-Wall, 21m x 5m high.
Granted Full applications 17 docs -
45 Coalisland Road Dungannon BT71 6LA
Re-alignment of existing driveway for health and safety reasons (extended length of driveway to reduce the average gradient to make it more accessible), demolition of existing shed structure and the building of new detached domestic garage
Granted Full applications Demolition 14 docsSmall domestic -
30M North East of 83 Coalisland Road, Dungannon
100% historically approved · decision due ~15 Aug
Retrospective planning application for the retention of car park
Awaiting decision Full applications 25 docs -
51 Rossmore Road Dungannon BT71 4BJ
New floodlighting to existing GAA pitch. Floodlighting to consist of 6No. 21m high poles.
Granted Full applications 18 docs -
Edendork St Malachys GFC 51 Rossmore Road Dungannon
100% historically approved · decision due ~7 Apr
New seated spectator stand (approx 500 seat) to existing terrace
Awaiting decision Full applications 9 docs -
Approx. 45M South Of 48 Rossmore Road Dungannon Tyrone BT71 4BJ.
Proposed dwelling & domestic garage (amended access). Relocation of approved property 7m South within the approved curtilage.
Granted Amendments 7 docsDomestic
Other full applications
In Mid Ulster
-
LA09/2026/0805/F Decided
Reid Engineering Ltd Kilcronagh Industrial Estate Cookstown BT80 9HG
Proposed relocation of existing entrance at Kilcronagh Industrial Estate, Cookstown, BT80 9H
-
LA09/2026/1126/F Awaiting decision
49 Church Street Cookstown BT80 8HT
Retention of single storey rear replacement extension with internal alterations to dwelling
-
LA09/2025/0520/F Decided
2 Lisnamuck Road Tobermore BT45 5QF
Production facility shed for the manufacture of decorative paving and walling products
-
LA09/2026/0726/F Decided
Dwelling Known As 80 Aghafad Road (by Applicant) 77 Aghafad Road (postal Address On Maps) Pomeroy BT70 2TR
Extension and alterations to dwelling
-
LA09/2025/0955/F Decided
Lands approximately 80M South of 39 Castle Road Cookstown Tyrone BT80 8TN
3 No. Glamping Pods, Parking, Landscaping and Associated Site Works