Planning application
On Lands approximately 285M South East of No. 14 Lismoney Road, With Access From Tullyboy Road Cookstown
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Wind turbine, 2no. buildings to house electrical equipment, and associated ancillary development. Turbine dimensions: 70m to hub height, 52m rotor diameter.
As published by the council, reference LA09/2025/0880/F
Application record
- Reference
- LA09/2025/0880/F
- Type
- Full
- Status
- Awaiting decision
- Received
- 20 Aug 2025
- Validated
- 28 Aug 2025
- Ward
- Coagh
- Parish
- Cookstown
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
20 Aug 2025
Received by Mid Ulster
-
28 Aug 2025
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Ulster took a median of 106 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
41 documents on file for this application
- COVER LETTER
- BAT MITIGATION AND MONITORING PLAN
- PRELIMINARY ECOLOGICAL APPRAISAL
- PLANNING RESPONSE TEAM DAERA EMFG AND NIEA
- WINDFARM MANAGEMENT MAGDALENE
- ENVIRONMENTAL HEALTH MID ULSTER DISTRICT COUNCIL
- ICS PSNI
- BELFAST INTERNATIONAL AIRPORT ENGINEERING DEPARTMENT
- AMENDED NOISE REPORT
- CLARIFICATION OF AMENDED NOISE REPORT
- STANDARD CONSULTATION LETTER
- ENVIRONMENTAL HEALTH MID ULSTER DISTRICT COUNCIL
- DFI ROADS MAGHERAFELT TEAM 2
- NATS SAFEGUARDING
- CORRECTED GRID LOCATION
- MR KEITH WAUDBY-ARQIVA BOROUGH HILL DAVENTRY-NEUTRAL(FULL)
- BELFAST CITY AIRPORT
- JRC CONSULTATION RESPONSE
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- ACKNOWLEDGE APP AND FEE RECEIPT
- SITE LOCATION PLAN 01
- SITE PLAN 02
- ELEVATIONS 04
- PLANS 03
- BIODIVERSITY CHECKLIST
- BAT SURVEY
- S/S NOISE REPORT
- PHOTOMONTAGE
- PLANNING STATEMENT
- SHADOW FLICKER
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided full applications in a median of 115 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Approximately 150M North East of 10 Lismoney Road Cookstown
100% historically approved · decision due ~16 Apr
225Kw Vesta V27 Wind Turbine
Awaiting decision Full applications 23 docs
Other full applications
In Mid Ulster
-
LA09/2026/0805/F Decided
Reid Engineering Ltd Kilcronagh Industrial Estate Cookstown BT80 9HG
Proposed relocation of existing entrance at Kilcronagh Industrial Estate, Cookstown, BT80 9H
-
LA09/2026/1126/F Awaiting decision
49 Church Street Cookstown BT80 8HT
Retention of single storey rear replacement extension with internal alterations to dwelling
-
LA09/2025/0520/F Decided
2 Lisnamuck Road Tobermore BT45 5QF
Production facility shed for the manufacture of decorative paving and walling products
-
LA09/2026/0726/F Decided
Dwelling Known As 80 Aghafad Road (by Applicant) 77 Aghafad Road (postal Address On Maps) Pomeroy BT70 2TR
Extension and alterations to dwelling
-
LA09/2025/0955/F Decided
Lands approximately 80M South of 39 Castle Road Cookstown Tyrone BT80 8TN
3 No. Glamping Pods, Parking, Landscaping and Associated Site Works