Proposal
Development consist of the redesigned parking layout and inclusion of 2 no 4 bay EV charging vehicle bays to the Syerla Rd main entrance, additional 70 no vehicle parking spaces to the rear of the site with the re opening of the the Culrevog site entrance include all works
As published by the council, reference LA09/2025/0863/F
Application record
- Reference
- LA09/2025/0863/F
- Type
- Full
- Status
- Awaiting decision
- Received
- 15 Aug 2025
- Validated
- 10 Sep 2025
- Ward
- Moy
- Parish
- Dungannon
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
15 Aug 2025
Received by Mid Ulster
-
10 Sep 2025
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Ulster took a median of 106 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Clarman Architects LTD Agent, an architecture practice
21 applications on PlanIndex · across 5 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordOS Doors Ltd Applicant
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
40 documents on file for this application
- SHARED ENVIRONMENTAL SERVICE
- DEPARTMENT FOR INFRASTRUCTURE RIVERS
- DFI ROADS DUNGANNON TEAM 1
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- 08 OVERALL DRAINAGE LAYOUT
- CAR PARK DRAINAGE LAYOUT 03 REV.01
- 07 PROPOSED ACCESS CULREVOG ROAD
- CONSENT TO DISCHARGE
- EMAIL FROM AGENT
- MR AUSTIN WEIR-98 SYERLA ROAD DUNGANNON TYRONE-NEUTRAL(FULL)
- PLANNING RESPONSE TEAM DAERA EMFG AND NIEA
- PLANNING RESPONSE TEAM DAERA EMFG AND NIEA
- CONSULTATION LETTER REMINDER
- SHARED ENVIRONMENTAL SERVICE
- DEPARTMENT FOR INFRASTRUCTURE RIVERS
- STANDARD CONSULTATION LETTER
- ENVIRONMENTAL HEALTH MID ULSTER DISTRICT COUNCIL
- DEPARTMENT FOR INFRASTRUCTURE RIVERS
- DFI ROADS DUNGANNON TEAM 1
- STANDARD NN LETTER (BULK)
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- ACKNOWLEDGE APP AND FEE RECEIPT
- SITE LOCATION PLAN 01
- PRELIMINARY ECOLOGICAL APPRAISAL
- CHP SHED - TRANSPORT ASSESSMENT FORM
- CARPARKING - TRANSPORT ASSESSMENT FORM
- PROPOSED SITE PLAN 02
- SECURITY HUT PLANS & ELEVATIONS 04
- EXISTING SITE SURVEY 06
- CAR PARK DRAINAGE LAYOUT 03 S/S
- PLANNING STATEMENT
- PROPOSED EV CHARGING UNIT 05
- APPLICATION FORM
- DRAINAGE ASSESSMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided full applications in a median of 115 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Development Is Located at The Os Doors Facility at 106 Syerla Rd, Located approximately 5.3 Kilometres From The Moy and 4.3 Kilometres From Eglish Town Respectively
The principal design objective of this proposal is to create a combined heating & power unit that will act as a reusable energy supply. Warehousing unit to house specific plant machinery is located to the rear. Additional warehousing unit located to the north of the site to act as extra production space. Site strategy stays the same with access and egress both coming from the main entrance on Syerla Rd.
Granted Full applications 123 docs -
15A Culrevog Road Benburb Dungannon
Proposed replacement dwelling and replacement ancillary out building
Granted Outline 16 docsDomestic
Other full applications
In Mid Ulster
-
LA09/2026/0805/F Decided
Reid Engineering Ltd Kilcronagh Industrial Estate Cookstown BT80 9HG
Proposed relocation of existing entrance at Kilcronagh Industrial Estate, Cookstown, BT80 9H
-
LA09/2026/1126/F Awaiting decision
49 Church Street Cookstown BT80 8HT
Retention of single storey rear replacement extension with internal alterations to dwelling
-
LA09/2025/0520/F Decided
2 Lisnamuck Road Tobermore BT45 5QF
Production facility shed for the manufacture of decorative paving and walling products
-
LA09/2026/0726/F Decided
Dwelling Known As 80 Aghafad Road (by Applicant) 77 Aghafad Road (postal Address On Maps) Pomeroy BT70 2TR
Extension and alterations to dwelling
-
LA09/2025/0955/F Decided
Lands approximately 80M South of 39 Castle Road Cookstown Tyrone BT80 8TN
3 No. Glamping Pods, Parking, Landscaping and Associated Site Works