Planning application
57 Parkanaur Rd Dungannon
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
External refurbishment/repair and internal reordering, to convert the historic courtyard buildings (Stable Block & Coach House) into supported living accommodation, with staff bedroom above the coach house archway and Gate Lodge into accommodation.
As published by the council, reference LA09/2025/0530/LBC
Application record
- Reference
- LA09/2025/0530/LBC
- Type
- Listed Building Consent
- Status
- Awaiting decision
- Received
- 13 May 2025
- Validated
- 16 May 2025
- Ward
- Castlecaulfield
- Parish
- Clogher Valley
- Decision by
- Delegated Decision
Site history
Applications at this address on the Mid Ulster register
This site has had 2 applications since 2025.
-
LA09/2025/0529/F Awaiting decision
57 Parkanaur Rd Dungannon
Conversion of Parkanaur Stable Block and Coach House into supported living apartments to be used by the Parkanaur Trust, and the Gate Lodge to be reused as accommodation. The development of the proposal aims to include 8 supported living apartments (6 in stable block and 2 in coach house), one staff bedroom above the coach house archway at first floor level and a 4-bedroom accommodation in the Gate Lodge.
Timeline
Dates from the published record
-
13 May 2025
Received by Mid Ulster
-
16 May 2025
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 July 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Ulster took a median of 97 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
51 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided heritage and listed building applications in a median of 96 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
57 Parkanaur Rd Dungannon
100% historically approved · decision due ~11 Jul
Conversion of Parkanaur Stable Block and Coach House into supported living apartments to be used by the Parkanaur Trust, and the Gate Lodge to be reused as accommodation. The development of the proposal aims to include 8 supported living apartments (6 in stable block and 2 in coach house), one staff bedroom above the coach house archway at first floor level and a 4-bedroom accommodation in the Gate Lodge.
Awaiting decision Full applications New dwelling 86 docs
Other heritage and listed building applications
In Mid Ulster
-
LA09/2026/0896/LBC Awaiting decision
Adjacent to Nos. 46 and 48 St. Patrick Street Draperstown BT45 7AL
Repair, restoration and reuse of existing vacant/decommissioned Grade B2 listed telephone kiosk to house a public access automated external defibrillator (AED), including associated internal fittings, repair and replacement of damaged fabric and glazing, repainting and new signage.
-
LA09/2025/0768/LBC Granted
15 The Square Moy Dungannon
Change of use from a ground floor retail unit (shop) to a ground floor cafe/coffee shop. The change of use consolidates the two ground floor units into one single coffee shop.
-
LA09/2026/0849/LBC Awaiting decision
20A High Street Draperstown BT45 7AA
Roof mounted PV panel installation and internal alterations to include installation of secondary glazing to existing windows.
-
LA09/2026/0406/LBC Granted
Approx 50M North West of 21 Knockmany Road Augher
Strengthen the existing bridge by repointing and replacing stones which have fallen out using lime crete/mortar out and then pressure spraying with insitu reinforced concrete which will increase the strength of the bridge.
-
LA09/2026/0618/LBC Awaiting decision
2-2A Stonard Street Moneymore BT45 7PN
Ramped disabled access at front access and rear extension to create store (33sq metres floor area)