Planning application
Approximately 640M North West of Junction of Drumard Road and Cullion Road (Accessing Onto Drumard Road) Draperstown
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Wind turbine with hub height of 59 metres and blade radius of 35.5 metres (Revised turbine hub height, blade radius and position within site from that previously permitted under LA09/2016/0477/F)
As published by the council, reference LA09/2023/0427/F
Application record
- Reference
- LA09/2023/0427/F
- Type
- Full
- Status
- Awaiting decision
- Received
- 5 Apr 2023
- Validated
- 7 Apr 2023
- Ward
- Draperstown
- Parish
- Moyola
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
5 Apr 2023
Received by Mid Ulster
-
7 Apr 2023
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 June 2023, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Ulster took a median of 104 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
45 documents on file for this application
- EMAIL TO AGENT
- PLANNING RESPONSE TEAM DAERA EMFG AND NIEA
- EMAIL TO AGENT RE ADDITIONAL INFO REQUESTED BY NED
- PLANNING RESPONSE TEAM DAERA EMFG AND NIEA
- CONSULTATION LETTER REMINDER
- ECOLOGICAL REPORT
- STANDARD CONSULTATION LETTER
- UPDATE FROM AGENT ON FURTHER INFO
- ENVIRONMENTAL HEALTH MID ULSTER DISTRICT COUNCIL
- PLANNING RESPONSE TEAM DAERA EMFG AND NIEA
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- ACOUSTIC REPORT
- SUPPORTING STATEMENT
- BAT ACTIVITY REPORT
- PRELIMINARY ECOLOGICAL APPRAISAL
- OBJ BERNIE GRAY
- OBJ MARY GRAY
- DFI ROADS MAGHERAFELT TEAM 2
- MID ULSTER DISTRICT COUNCIL ENVIRONMENTAL HEALTH DEPARTMENT
- MISS VALENCIA WEIR
- STANDARD CONSULTATION LETTER
- WINDFARM MANAGEMENT MAGDALENE
- BELFAST INTERNATIONAL AIRPORT ENGINEERING DEPARTMENT
- NATS SAFEGUARDING
- DIO SAFEGUARDING
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- STANDARD CONSULTATION LETTER
- ICS PSNI
- ARQIVA SPECTRUM PLANNING
- BELFAST CITY AIRPORT
- DERRY POST ADVERT
- ACKNOWLEDGE APP AND FEE RECEIPT
- SITE LOCATION PLAN 01
- SITE LAYOUT PLAN 02
- PROPOSED PLANS 03
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Mid Ulster for determination, against a statutory target of eight weeks. Over the last year Mid Ulster decided full applications in a median of 112 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Approximately 850M North West of Junction of Drumard Road and Cullion Road (Accessing Onto Drumard Road) Draperstown
100% historically approved · decision due ~1 Jun
Wind Turbine with Hub Height of 59 metres and Blade Radius of 35.5 metres (Revised Turbine Hub Height, Blade Radius and Position within Site from that Previously Permitted Under LA09/2016/0492/F)
Awaiting decision Full applications 45 docs -
Approximately 990M North West Of Drumard Road/ Cullion Road Junction Straw Mountian Draperstown
Substation and compound to serve proposed wind turbines
Granted Full applications 34 docs -
Approximately 960 Metres North West of Junction of Drumard Road and Cullion Road, (Accessing Onto Drumard Road), Draperstown
100% historically approved · decision due ~1 Jun
Wind Turbine with Hub Height of 59 metres and Blade Radius of 35.5 metres (Revised Turbine Hub Height, Blade Radius and Position within Site from that Previously Permitted Under LA09/2016/0502/F)
Awaiting decision Full applications 48 docs
Other full applications
In Mid Ulster
-
LA09/2026/0704/F Decided
14 Glenmaquill Road Magherafelt BT45 5EW
Extension to dwelling
-
LA09/2023/0545/F Decided
134 Ballyronan Road Magherafelt BT45 6HR
Retention of Agricultural Storage / Livestock Building over an Existing Farm Tank
-
LA09/2026/0628/F Decided
1 Coole Cottages Coalisland BT71 5DN
Alteration and extension to provide a single storey extension to side of dwelling to accommodate a kitchen/dining and 2 no. additional bedrooms
-
LA09/2026/0503/F Decided
Land Approx. 75M SE of 21 Iniscarn Road Moneymore Londonderry BT45 7RH
New agricultural access Laneway.
-
LA09/2024/0872/F Decided
5 Annagher Road Coalisland BT71 4NE
Demolition of existing dwelling and replace with two semi detached dwellings