Planning application
DM/26/1771
Land Off Scamps Hill Scaynes Hill Road Lindfield West Sussex
Proposal
A reserved matters application (access within site, appearance, layout, scale and landscaping) for 87 dwellings and associated infrastructure.
As published by the council, reference DM/26/1771
Timeline
Dates from the published record
-
20 Jul 2026
Received by Mid Sussex
-
24 Jul 2026
Validated
Checked as complete and ready for consideration.
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Mid Sussex for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About reserved matters applications
How this application type works
A reserved matters application fills in the detail held back from an earlier outline permission, typically appearance, landscaping, layout, scale or access. The council judges it against the outline permission already granted, not the principle of development, which is settled. It must normally be submitted within three years of the outline decision.
Nearby applications
Within 500 metres
-
DM/24/2251 Decided
3 Kidbrook Lindfield Haywards Heath West Sussex RH16 2RU
Proposed first floor side extension
-
DM/26/1774 Awaiting decision
Land To The Rear Of Residents Parking Area Lime Tree Grove Lindfield West Sussex
Hazel, Hawthorn, Blackthorn and Elder to be reduced and maintained as a hedge up to 5m high. Oak trees - thin crown by 15%.
-
DM/23/0090 Decided
Tachbrook Lewes Road Lindfield Haywards Heath West Sussex RH16 2LN
Demolish existing flat roofed porch and rebuild to same size with tiled pitched roof to match main roof.
-
DM/16/1021 Decided
Land Parcel At 535047 124666 Gravelye Lane Lindfield West Sussex
Screening opinion for the erection of up to 130 dwellings with vehicular and pedestrian access, public open space and landscaping.
-
DM/23/0452 Granted
Land To West Of 1 West View Cottages Lewes Road Lindfield Haywards Heath West Sussex RH16 2LJ
T1 - Willow - re-pollard back to previous pruning points and remove epicormic growth to a height of 4m.
-
DM/26/1573 Awaiting decision
Totnesia 17 Luxford Road Lindfield Haywards Heath West Sussex RH16 2LY
Proposed two-storey rear extension, a garage conversion to habitable accommodation, a front porch extension and an alteration to the external cladding on the front elevation amended description.
Other reserved matters applications
In Mid Sussex
-
DM/25/0446 Decided
Burgess Hill Northern Arc, Land N And NW Of Burgess Hill, Between Bedelands Nature Reserve In The East And, Goddard's Green Waste Water Treatment Works In The West
The construction of a single carriageway link road from the tie-in with the proposed Western Bridge and Link Road (WBLR), through to the proposed tie-in with Eastern Bridge and Link Road (EBLR) including tie-ins to the existing B2036 Cuckfield Road. The primary east-west route will typically comprise of a new 6.5m carriageway with one 3m shared footway/cycleway and one 2m wide footway and two 2.75m verges. While the 6.5m wide carriageway will be consistent throughout, some sections of the primary east-west route will diverge from this typical arrangement to complement area specific requirements. The northern link to the B2036 Cuckfield Road from the proposed east-west road will consist of a new 6.5m wide carriageway and single 2m footway. The southern link to the B2036 Cuckfield Road from the proposed east-west road will consist of a new 6.5m wide carriageway and a short extension of the Green Super Highway extending to the driveway entrance servicing the existing Oak Barn Bar & Restaurant carpark. The western end of the east-west road corridor and the southern link to the B2036 Cuckfield Road will both facilitate connections to the Green Superhighway. All will be constructed to an adoptable standard, together with associated crossing points, earthworks and vegetation removal, surface water and foul drainage infrastructure, utilities corridors and diversions, road lighting, soft landscaping, including tree-planting and temporary fencing, on-street parking and provision of in-line bus stops for bus services. (Amended plans recieved 15/02/2026).
-
DM/26/1186 Awaiting decision
Land West Of Selsfield Road Ardingly West Sussex
Reserved Matters application for consideration of consider all outstanding matters (layout, scale, landscaping and appearance) in respect of outline planning permission DM/22/1575 (and the subsequent variation of conditions 2 and 11 through permission DM/23/3250). (Amended plans received 14/07/2026)
-
DM/26/0682 Awaiting decision
Land At Hurst Farm Hurstwood Lane Haywards Heath West Sussex
Reserved Matters Application Pursuant to Outline Planning Permission Mid Sussex District Council (MSDC) Reference: DM/25/1630, Lewes District Council (LDC) Reference: LW/2510707 at Hurst Farm, for appearance, layout, scale and landscaping only. (additional ecology information received 28/05/2026).
-
DM/26/0131 Awaiting decision
Land South And West Of Upper Imberhorne School Imberhorne Lane East Grinstead West Sussex
Approval of Reserved Matters following Outline Planning Permission (Ref. DM/23/2699) relating to appearance, landscaping, layout and scale for 550no. new residential units. (Drainage addendum received 02/04/2026). (Amended plans and information received 20th to 27th May showing revisions to the proposed design, landscaping, highways, housing and sustainability measures) (Surface water calculations received 24/06/2026).
-
DM/25/1128 Awaiting decision
Burgess Hill Northern Arc, Land N And NW Of Burgess Hill, Between Bedelands Nature Reserve In The East And, Goddard's Green Waste Water Treatment Works In The West
Second phase of the Western Bridge and Link Road, comprising the construction of a two-lane single carriageway road, with 3m shared surface (cyclist/pedestrian) on the west side of the highway, and a segregated 5m cycleway/footway on the east side. Connecting to the first phase of WBLR at the roundabout junction on the A2300. Provision of Western Bridge, spanning 71m, carrying the highway and cycleway/footway over the River Adur and floodplain, connecting with future phases at the eastern extent. Includes provision of access to future residential areas, signalised crossing points, earthworks, surface water and foul drainage infrastructure, utilities corridors, lighting and landscaping. (Amended plans received 22.06.2026).