Planning application

Land North East Of Chapel Road Mendlesham Suffolk

Awaiting decision Mid Suffolk DC/26/03613 Discharge of Condition(s)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Conditions Application for DC/23/03187 - Condition 7 (Energy and Sustainability Statement)

As published by the council, reference DC/26/03613

Application record

Reference
DC/26/03613
Type
Discharge of Condition(s)
Status
Awaiting decision
Received
19 Aug 2026
Validated
20 Aug 2026
Ward
Mendlesham
Parish
Mendlesham

Comment by 10 September 2026

The council is taking comments on this application until then. Have your say on Mid Suffolk's portal.

Site history

Applications at this address on the Mid Suffolk register

This site has had 4 applications since 2026: 2 approved, 0 refused.

  • DC/26/01894 Granted

    Land North East Of Chapel Road Mendlesham Suffolk

    Discharge of Conditions Application for DC/19/05915 - Conditions 13 (Roads and Footpaths), Condition 15 (Surface water Discharge Prevention), Condition 18 (Construction Management Plan) and Condition 27 (Wildlife Sensitive Lighting Design Scheme)

    Decided 14 Jul 2026 Conditions
  • DC/26/01888 Granted

    Land North East Of Chapel Road Mendlesham Suffolk

    Discharge of Conditions Application for DC/23/03187 - Conditions 4 - (Details of Cycle Storage) and 10 - (Scheme for Ditch Management)

    Decided 4 Jun 2026 Conditions
  • DC/26/00949 Split decision

    Land North East Of Chapel Road Mendlesham Suffolk

    Discharge of Conditions Application for DC/19/05915 - Condition 5 (Written Scheme of Archaeological Evaluation)

    Decided 29 Apr 2026 Conditions

Timeline

Dates from the published record

  1. 19 Aug 2026

    Received by Mid Suffolk

  2. 20 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 15 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Mid Suffolk took a median of 48 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: DC/23/03187 (Granted)

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

  • APPLICATION FORM Application Form · 19 Aug 2026
  • RESERVED MATTERS CONDITION 7 - ENERGY AND SUSTAINABILITY STATEMENT Report · 19 Aug 2026
  • RESERVED MATTERS CONDITION 7 - APPENDIX 2 Report · 19 Aug 2026
  • RESERVED MATTERS CONDITION 7 - APPENDIX 1 Report · 19 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Mid Suffolk for determination, against a statutory target of eight weeks. Over the last year Mid Suffolk decided condition discharge and variation applications in a median of 46 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Mid Suffolk

  • DC/26/03850 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024

    4 Sep 2026 Conditions
  • DC/26/03834 Awaiting decision

    Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton

    Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)

    3 Sep 2026 Conditions
  • DC/26/03842 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024

    3 Sep 2026 Conditions
  • DC/26/03798 Awaiting decision

    Land To The East Of Ely Road Barham Suffolk

    Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)

    2 Sep 2026 Conditions
  • DC/26/03802 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of Details reserved by Requirement 6 - Detailed Written Scheme of Investigation (DWSI) for Stage 3 - pursuant to The National Grid (Bramford To Twinstead Reinforcement) Order 2024 to approve area(s) - where no further archaeological investigation is required at land in the vicinity of Trenches 359-366 - as marked on the attached plans.

    2 Sep 2026 Conditions