Planning application
DC/26/02329
Land At Bullen Lane Bramford IP8 4JJ
Proposal
Request for an Environmental Impact Assessment Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017. Undertake a directional drill at depth of 7metres under private land in order to run underground cable conduit approx 300metres from battery energy storage site to the grid point of connection.
As published by the council, reference DC/26/02329
Timeline
Dates from the published record
-
2 Jun 2026
Received by Mid Suffolk
-
15 Jun 2026
Decision issued: EIA not required
-
24 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
DC/26/02329 Decided
Land At Bullen Lane Bramford IP8 4JJ
Request for an Environmental Impact Assessment Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017. Undertake a directional drill at depth of 7metres under private land in order to run underground cable conduit approx 300metres from battery energy storage site to the grid point of connection.
-
DC/26/01447 Granted
Land To The South Of Bullen Lane Bramford Suffolk
Discharge of Conditions Application for DC/21/05468 - Condition 18 (Timescale for Landscaping)
-
DC/26/01447 Granted
Land To The South Of Bullen Lane Bramford Suffolk
Discharge of Conditions Application for DC/21/05468 - Condition 18 (Timescale for Landscaping)
-
DC/26/02447 Granted
East Anglia 3 Onshore Converter Station Bullen Lane Bramford IP8 4JL
East Anglia 3 Onshore Converter Station - Application pursuant to discharge of requirements 24 and 25(2)(f) to agree out of hours working on the following dates: 4th June to 10th July - 19:00 to 07:00 for 12 hours of nightshift working
-
DC/26/02447 Granted
East Anglia 3 Onshore Converter Station Bullen Lane Bramford IP8 4JL
East Anglia 3 Onshore Converter Station - Application pursuant to discharge of requirements 24 and 25(2)(f) to agree out of hours working on the following dates: 4th June to 10th July - 19:00 to 07:00 for 12 hours of nightshift working
-
DC/26/01527 Granted
Land Adjacent To Bullen Lane Bramford IP8 4JN
Discharge of Conditions Application for DC/24/05090 - Condition 14 (Annual Safety Report Update)
Other outline applications
In Mid Suffolk
-
DC/25/03824 Granted
Kelryan House Red House Lane Great Cornard Sudbury Suffolk CO10 0JB
Application for Outline Planning Permission (Access points to be considered, all other matters reserved) Town and Country Planning Act 1990 (as amended) - for the erection of up to 4 No Single Storey Dwellings including a New Private Access Drive from Red House Lane
-
DC/26/02750 Decided
Hadleigh Road Holton St Mary Part In The Parishes Of East Bergholt And Raydon Suffolk
Request for an Environmental Impact Assessment Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017. Alterations to A12 merge road with B1070, construction of haul road, access points, attenuation ponds, drainage and construction compound. Removal of vegetation, street furniture and signage. All as "Early Enabling Works" for the proposed Norwich to Tilbury NSIP development.
-
DC/26/02749 Decided
Land South Of Old Bury Road Wortham Suffolk
Request for an Environmental Impact Assessment Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 - Construction of a Main Works Compound (RG-Main) including vegetation removal and construction works associated with the existing bellmouth, referred to as the "Early Enabling Works" (EEW).
-
DC/26/01910 Decided
Land Near Bramford Substation Bullen Lane Bramford IP8 4JL
Request for Environmental Impact Assessment (EIA) Scoping Opinion - Construction and operation of a battery energy storage system (BESS) and associated works (Cross-boundary application - Mid Suffolk District Council)
-
DC/26/01983 Decided
Land Near Bramford Substation Bullen Lane Bramford IP8 4JL
Request for Environmental Impact Assessment (EIA) Scoping Opinion - Construction and operation of a battery energy storage system (BESS) and associated works (Cross-boundary application - Babergh District Council)