Skip to content
PlanIndex Get alerts
Menu

Planning application

Rose Farm Cottages Rose Farm Lane Shotley Suffolk

Awaiting decision Mid Suffolk DC/26/02115 Discharge of Condition(s)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of Conditions Application for DC/24/03273 - Part discharge of Condition 4 (Construction Environmental Management Plan), Condition 7 (Landscaping Scheme) and the BNG condition - for the slipway only.

As published by the council, reference DC/26/02115

Application record

Reference
DC/26/02115
Type
Discharge of Condition(s)
Status
Awaiting decision
Received
18 May 2026
Validated
18 Jun 2026
Ward
Ganges
Parish
Shotley

Timeline

Dates from the published record

  1. 18 May 2026

    Received by Mid Suffolk

  2. 18 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Mid Suffolk took a median of 48 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Mid Suffolk for determination, against a statutory target of eight weeks. Over the last year Mid Suffolk decided condition discharge and variation applications in a median of 46 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Rose Farm Cottages Rose Farm Lane Shotley Suffolk

    DC/26/02115 Submitted 18 May 2026 0m away

    95% historically approved · decision due ~13 Aug

    Discharge of Conditions Application for DC/24/03273 - Part discharge of Condition 4 (Construction Environmental Management Plan), Condition 7 (Landscaping Scheme) and the BNG condition - for the slipway only.

    Awaiting decision Conditions 13 docs
  • The Potting Shed 9-10 Rose Farm Cottages Rose Farm Lane Shotley IP9 1PH

    DC/25/03683 Submitted 19 Aug 2025 77m away

    Planning Application - Demolition of existing one bedroom Annex and construction of 1no two-bedroom Annex with parking.

    Refused Full applications Demolition 24 docs
  • The Potting Shed 9-10 Rose Farm Cottages Rose Farm Lane Shotley IP9 1PH

    DC/25/03683 Submitted 19 Aug 2025 77m away

    Planning Application - Demolition of existing one bedroom Annex and construction of 1no two-bedroom Annex with parking.

    Refused Full applications Demolition 24 docs
  • 9 Stourside Shotley Ipswich Suffolk IP9 1QF

    DC/17/02881 Submitted 12 Jun 2017 496m away

    Householder Planning Application - Erection of two storey side and rear extension and provision of additional parking and dropped kerb.

    Granted Householder Extension 12 docs
    Small domestic
  • 9 Stourside Shotley Ipswich Suffolk IP9 1QF

    DC/17/02881 Submitted 12 Jun 2017 496m away

    Householder Planning Application - Erection of two storey side and rear extension and provision of additional parking and dropped kerb.

    Granted Householder Extension 12 docs
    Small domestic

In Mid Suffolk

  • DC/26/03850 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024

    4 Sep 2026 Conditions
  • DC/26/03834 Awaiting decision

    Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton

    Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)

    3 Sep 2026 Conditions
  • DC/26/03842 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024

    3 Sep 2026 Conditions
  • DC/26/03798 Awaiting decision

    Land To The East Of Ely Road Barham Suffolk

    Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)

    2 Sep 2026 Conditions
  • DC/26/03802 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of Details reserved by Requirement 6 - Detailed Written Scheme of Investigation (DWSI) for Stage 3 - pursuant to The National Grid (Bramford To Twinstead Reinforcement) Order 2024 to approve area(s) - where no further archaeological investigation is required at land in the vicinity of Trenches 359-366 - as marked on the attached plans.

    2 Sep 2026 Conditions