Planning application
DC/26/02100
Land South Of Old Newton School School Road Old Newton
Proposal
Discharge of Conditions Application for DC/21/06081 - Condition 15 (Construction Management)
As published by the council, reference DC/26/02100
Timeline
Dates from the published record
-
18 May 2026
Received by Mid Suffolk
-
19 May 2026
Validated
Checked as complete and ready for consideration.
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Mid Suffolk for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
DC/26/02100 Awaiting decision
Land South Of Old Newton School School Road Old Newton
Discharge of Conditions Application for DC/21/06081 - Condition 15 (Construction Management)
-
DC/17/05765 Refused
Land At School Road Old Newton Suffolk
Outline Planning Application (Access to be considered). Erection of 5no dwellings and provision of extension to school car park.
-
DC/17/05765 Refused
Land At School Road Old Newton Suffolk
Outline Planning Application (Access to be considered). Erection of 5no dwellings and provision of extension to school car park.
-
DC/26/02807 Awaiting decision
Church Farm Church Road Old Newton Stowmarket Suffolk IP14 4PH
Householder Application - Retention of a timber post-and-beam outbuilding with 26 no. integrated matt-black photovoltaic (PV) panels and ancillary storage/log store
-
DC/26/02807 Awaiting decision
Church Farm Church Road Old Newton Stowmarket Suffolk IP14 4PH
Householder Application - Retention of a timber post-and-beam outbuilding with 26 no. integrated matt-black photovoltaic (PV) panels and ancillary storage/log store
-
DC/26/02577 Awaiting decision
Church Farm Church Road Old Newton Stowmarket Suffolk IP14 4PH
Householder Application - Removal of external oil-fired combi boiler and associated bunded oil storage tank, and installation of Air Source Heat Pump (ASHP) in location of oil storage tank, utilising existing concrete pad.
Other conditions applications
In Mid Suffolk
-
DC/26/03296 Awaiting decision
22 King Street Sudbury Suffolk CO10 2EN
Discharge of Conditions Application for DC/26/01545 - Conditions 3 (Floor Finishes) and 4 (Lighting)
-
DC/26/02972 Granted
Acorn Place Saxham Street Stowupland Stowmarket Suffolk IP14 5DA
Discharge of Conditions Application for DC/26/01170 - Condition 3 (Biodiversity Enhancement)
-
DC/26/03290 Awaiting decision
Valley Farm Valley Lane Buxhall Stowmarket Suffolk IP14 3EB
Discharge of Conditions Application for DC/26/02091 - Condition 4 (Great Crested Newt Licence)
-
DC/26/03292 Awaiting decision
Hop Hall Somerton Road Hartest Bury St Edmunds Suffolk IP29 4NA
Discharge of Conditions Application for DC/23/04860 - 4 (External Facing And Roofing Materials), 5 (Landscaping), 6 (Surface Water), 8 (Access), 9 (Refuse and Recycling Bins) and 11 (Gradient of Access and Driveway)
-
DC/26/03277 Awaiting decision
The Hovell 25 High Street Thorndon Eye Suffolk IP23 7LX
Discharge of Conditions Application for DC/26/00006 - Conditions 3 (Construction Management Plan), 4 (Biodiversity Method Statement), 5 (Surface Water Discharge Prevention), 6 (Roofing Material), 8 (Biodiversity Enhancement Strategy), 9 (Wildlife Sensitive Lighting Design scheme) and 10 (Cycle Storage)