Diss Compressor Station Langton Green Eye Suffolk IP23 7HL

Granted Mid Suffolk DC/26/01126 Development by statutory undertaker

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Development by a Statutory Undertaker - The removal of 3 no. antenna, and the installation of 9 no. replacement antenna and ancillary radio equipment onto new support poles at existing lattice mast and ancillary development thereto.

As published by the council, reference DC/26/01126

Application record

Reference
DC/26/01126
Type
Development by statutory undertaker
Status
Decided
Decision
Raise No Objection
Received
16 Mar 2026
Validated
17 Mar 2026
Decided
9 Apr 2026
Ward
Eye
Parish
Eye
Decision by
Delegated Decision
Postcode
IP23 7HL

Timeline

Dates from the published record

  1. 16 Mar 2026

    Received by Mid Suffolk

  2. 17 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 9 Apr 2026

    Decision issued: Raise No Objection

  4. 9 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Mid Suffolk granted permission on 9 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Mid Suffolk's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Diss Compressor Station Langton Green Eye Suffolk IP23 7HL

    DC/26/01126 Submitted 16 Mar 2026 0m away

    Development by a Statutory Undertaker - The removal of 3 no. antenna, and the installation of 9 no. replacement antenna and ancillary radio equipment onto new support poles at existing lattice mast and ancillary development thereto.

    Granted 4 docs
  • Verge Off Progress Way Eye Airfield Industrial Estate Eye IP23 7HU

    DC/25/05117 Submitted 19 Nov 2025 255m away

    Discharge of Conditions Application for DC/25/00704 - Condition 3 (Biodiversity Enhancment Measures))

    Granted Conditions 4 docs
  • Verge Off Progress Way Eye Airfield Industrial Estate Eye IP23 7HU

    DC/25/05117 Submitted 19 Nov 2025 255m away

    Discharge of Conditions Application for DC/25/00704 - Condition 3 (Biodiversity Enhancment Measures))

    Granted Conditions 4 docs
  • Progress Power Ltd Potash Lane Eye Suffolk IP23 7HE

    DC/25/04199 Submitted 19 Sep 2025 296m away

    Approval of Details reserved by Requirement 22 of The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570).

    Granted Conditions 20 docs
  • Progress Power Ltd Potash Lane Eye Suffolk IP23 7HE

    DC/25/04199 Submitted 19 Sep 2025 296m away

    Approval of Details reserved by Requirement 22 of The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570).

    Granted Conditions 20 docs
  • Land Eye Airfield Castleton Way Yaxley Suffolk

    DC/26/02596 Submitted 18 Jun 2026 331m away

    Application for a Lawful Development Certificate for a Proposed Use or Development. Town and Country Planning Act 1990 (as amended) - The proposal involves removing a small section of the existing earth bank to create a secure access point, including the installation of two gate posts and a lockable gate. The proposed site measures approximately 200 metres by 25 metres, giving a total area of 5,000 square metres. It would be used for the secure parking of up to 40 empty semi-trailers. The main purpose of the proposal is to reduce unnecessary HGV mileage and the associated environmental impact. Due to the site?s location, up to four trailer movements could be completed locally in the same distance currently required for one return journey to our Stradbroke yard. This would significantly reduce fuel consumption, vehicle emissions, road mileage and the number of HGV movements through local communities. It would also improve operational efficiency while supporting the company?s wider aim of reducing its environmental impact.

    Withdrawn Lawful development 1 doc