Planning application
1 The Downs Stoke By Nayland Colchester Suffolk CO6 4QR
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Conditions Application for DC/24/02368 - Condition 6 (Hard Surfacing) and 7 (External Landscaping/Hard Surfacing)
As published by the council, reference DC/26/00923
Application record
- Reference
- DC/26/00923
- Type
- Discharge of Condition(s)
- Status
- Granted
- Decision
- Granted
- Received
- 4 Mar 2026
- Validated
- 4 Mar 2026
- Decided
- 9 Apr 2026
- Ward
- Bures St Mary & Nayland
- Parish
- Stoke By Nayland
- Decision by
- Delegated Decision
- Postcode
- CO6 4QR
Timeline
Dates from the published record
-
4 Mar 2026
Received by Mid Suffolk
-
9 Apr 2026
Decision issued: Granted
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
7 applications on PlanIndex · across 3 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Mid Suffolk granted permission on 9 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
1-4 The Downs Stoke By Nayland Colchester Suffolk CO6 4QR
Discharge of Conditions Application for DC/24/02368 - Condition 3 (Fenestration Detail)., 4 (Rainwater Goods), 5 (Facing and Roofing Materials), 8 (Eaves and Verges) and 9 (Ventilation Specifications)
Granted Conditions Windows or glazing 17 docs -
1 The Downs Stoke By Nayland Colchester Suffolk CO6 4QR
Discharge of Conditions Application for DC/24/02368 - Condition 6 (Hard Surfacing) and 7 (External Landscaping/Hard Surfacing)
Granted Conditions 7 docs -
1-4 The Downs Stoke By Nayland Colchester Suffolk CO6 4QR
Discharge of Conditions Application for DC/24/02368 - Condition 3 (Fenestration Detail)., 4 (Rainwater Goods), 5 (Facing and Roofing Materials), 8 (Eaves and Verges) and 9 (Ventilation Specifications)
Granted Conditions Windows or glazing 17 docs -
1-4 The Downs Church Street Stoke By Nayland Suffolk
77% historically approved · decision due ~8 Sep
Full Planning Application - Installation of 4 no. Air-to-Air Heat Pump AC units (1No. to each house at 1-4 The Downs)
Awaiting decision Full applications 14 docs -
1-4 The Downs Church Street Stoke By Nayland Suffolk
77% historically approved · decision due ~8 Sep
Full Planning Application - Installation of 4 no. Air-to-Air Heat Pump AC units (1No. to each house at 1-4 The Downs)
Awaiting decision Full applications 16 docs -
Downs Cottages Church Street Stoke By Nayland Suffolk
Full Planning Application - Installation of 4No. Air-to-Air Heat Pump AC units (1No. to each house at 1-4 The Downs).
Refused Full applications 12 docs
Other condition discharge and variation applications
In Mid Suffolk
-
DC/26/03850 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03834 Awaiting decision
Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton
Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)
-
DC/26/03842 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03798 Awaiting decision
Land To The East Of Ely Road Barham Suffolk
Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)
-
DC/26/03802 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of Details reserved by Requirement 6 - Detailed Written Scheme of Investigation (DWSI) for Stage 3 - pursuant to The National Grid (Bramford To Twinstead Reinforcement) Order 2024 to approve area(s) - where no further archaeological investigation is required at land in the vicinity of Trenches 359-366 - as marked on the attached plans.