Planning application
Little Wenham Hall Hall Lane Wenham Parva Colchester Suffolk CO7 6PZ
Part of this application was approved and part refused. The decision notice on the council portal sets out which is which.
Proposal
Discharge of Conditions Application for DC/24/02709 - Condition 3 (Phasing Plan), 5 (Soil Vent Pipes and Meter Boxes), 10 (External Materials - Building C), 11 (Drawing Details - Building C), 12 (External Materials - Building D), 13 (Drawing Details - Building D) and 14 (Historic Floor Finishes - Building D)
As published by the council, reference DC/26/00566
Application record
- Reference
- DC/26/00566
- Type
- Discharge of Condition(s)
- Status
- Decided
- Decision
- Part approved, part refused As published: Part Granted/Part Refused
- Received
- 11 Feb 2026
- Validated
- 11 Feb 2026
- Decided
- 16 Apr 2026
- Ward
- Copdock & Washbrook
- Parish
- Wenham Parva
- Decision by
- Delegated Decision
- Postcode
- CO7 6PZ
Site history
Applications at this address on the Mid Suffolk register
This site has had 2 applications since 2026.
-
DC/26/00596 Split decision
Little Wenham Hall Hall Lane Wenham Parva Colchester Suffolk CO7 6PZ
Discharge of Conditions Application for DC/24/02708 - Condition 3 (Phasing Plan), Part discharge of 4 (Foul Water Drainage) for buildings B,C, D, E, F, G and H only, Part discharge of 5 (External Surface and Boundary Treatments) for Phase 1 only, Part discharge of 6 (Brick, Walls, Gates and Fences) for phase 1 only, 8 (Landscaping Scheme), Part discharge of 9 (Bat Licence) for phase 1 only, 10 (Biodiversity Enhancement Strategy), 11 (Reptile Mitigation Strategy), part discharge of 12 (Badger Survey) for Phase 1 only, 15 (Public Rights of Way -Construction Management Strategy), 16 (Public Rights of Way Management Plan), 20 (Flood Evacuation Plan), 21 (Surface Water), Part discharge of 26 (Cycle Storage) for buildings C and D only, part discharge for 27 (Refuse storage and presentation) for buildings C and D only, part discharge of 28 (EV Charging) for buildings C and D only, 29 (Written Scheme of Investigation - Below ground assets), 31 (Written Scheme of Investigation -Historic Building record) for buildings B,C,D, E F G and H only, 36 (Investigation and Remediation) and the BNG Condition
Timeline
Dates from the published record
-
11 Feb 2026
Received by Mid Suffolk
-
16 Apr 2026
Decision issued: Part Granted/Part Refused
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
80 applications on PlanIndex · across 4 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
35 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Mid Suffolk has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Little Wenham Hall Hall Lane Wenham Parva Colchester Suffolk CO7 6PZ
Discharge of Conditions Application for DC/24/02708 - Condition 3 (Phasing Plan), Part discharge of 4 (Foul Water Drainage) for buildings B,C, D, E, F, G and H only, Part discharge of 5 (External Surface and Boundary Treatments) for Phase 1 only, Part discharge of 6 (Brick, Walls, Gates and Fences) for phase 1 only, 8 (Landscaping Scheme), Part discharge of 9 (Bat Licence) for phase 1 only, 10 (Biodiversity Enhancement Strategy), 11 (Reptile Mitigation Strategy), part discharge of 12 (Badger Survey) for Phase 1 only, 15 (Public Rights of Way -Construction Management Strategy), 16 (Public Rights of Way Management Plan), 20 (Flood Evacuation Plan), 21 (Surface Water), Part discharge of 26 (Cycle Storage) for buildings C and D only, part discharge for 27 (Refuse storage and presentation) for buildings C and D only, part discharge of 28 (EV Charging) for buildings C and D only, 29 (Written Scheme of Investigation - Below ground assets), 31 (Written Scheme of Investigation -Historic Building record) for buildings B,C,D, E F G and H only, 36 (Investigation and Remediation) and the BNG Condition
Split decision Conditions 54 docs -
Little Wenham Hall Hall Lane Wenham Parva Colchester Suffolk CO7 6PZ
Discharge of Conditions Application for DC/24/02709 - Condition 3 (Phasing Plan), 5 (Soil Vent Pipes and Meter Boxes), 10 (External Materials - Building C), 11 (Drawing Details - Building C), 12 (External Materials - Building D), 13 (Drawing Details - Building D) and 14 (Historic Floor Finishes - Building D)
Split decision Conditions 35 docs -
Little Wenham Hall Hall Lane Wenham Parva Colchester Suffolk CO7 6PZ
Discharge of Conditions Application for DC/24/02708 - Condition 3 (Phasing Plan), Part discharge of 4 (Foul Water Drainage) for buildings B,C, D, E, F, G and H only, Part discharge of 5 (External Surface and Boundary Treatments) for Phase 1 only, Part discharge of 6 (Brick, Walls, Gates and Fences) for phase 1 only, 8 (Landscaping Scheme), Part discharge of 9 (Bat Licence) for phase 1 only, 10 (Biodiversity Enhancement Strategy), 11 (Reptile Mitigation Strategy), part discharge of 12 (Badger Survey) for Phase 1 only, 15 (Public Rights of Way -Construction Management Strategy), 16 (Public Rights of Way Management Plan), 20 (Flood Evacuation Plan), 21 (Surface Water), Part discharge of 26 (Cycle Storage) for buildings C and D only, part discharge for 27 (Refuse storage and presentation) for buildings C and D only, part discharge of 28 (EV Charging) for buildings C and D only, 29 (Written Scheme of Investigation - Below ground assets), 31 (Written Scheme of Investigation -Historic Building record) for buildings B,C,D, E F G and H only, 36 (Investigation and Remediation) and the BNG Condition
Split decision Conditions 54 docs -
Churchford Farm Mill Hill Capel St Mary Ipswich Suffolk IP9 2LA
Application to determine if prior approval is required for a proposed: Change of Use of Agricultural Buildings to a flexible use within Storage or Distribution (Use Class B8), Hotels (Use Class C1), Commercial/Business/Service (Use Class E) The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) - Schedule 2, Part 3, Class R - Change of use of Building 2 and part of Building 3 to Flexible Commercial Use
Granted Prior approval 20 docs -
Churchford Farm Mill Hill Capel St Mary Ipswich Suffolk IP9 2LA
Application to determine if prior approval is required for a proposed: Change of Use of Agricultural Buildings to a flexible use within Storage or Distribution (Use Class B8), Hotels (Use Class C1), Commercial/Business/Service (Use Class E) The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) - Schedule 2, Part 3, Class R - Change of use of Building 2 and part of Building 3 to Flexible Commercial Use
Granted Prior approval 20 docs -
Churchford Farm Mill Hill Capel St Mary Ipswich Suffolk IP9 2LA
Application to determine if prior approval is required for a proposed: change of use from Commercial, Business and Service (Use Class E) to Dwellinghouses (Use Class C3). Town and Country Planning (General Permitted Development) (England) Order 2015 (As Amended) Schedule 2, Part 3, Class MA. - Conversion of buildings 8 and 9 into a single dwelling
Refused Prior approval 17 docsDomestic
Other condition discharge and variation applications
In Mid Suffolk
-
DC/26/03850 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03834 Awaiting decision
Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton
Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)
-
DC/26/03842 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03798 Awaiting decision
Land To The East Of Ely Road Barham Suffolk
Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)
-
DC/26/03802 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of Details reserved by Requirement 6 - Detailed Written Scheme of Investigation (DWSI) for Stage 3 - pursuant to The National Grid (Bramford To Twinstead Reinforcement) Order 2024 to approve area(s) - where no further archaeological investigation is required at land in the vicinity of Trenches 359-366 - as marked on the attached plans.