Planning application
The Progress Power (Gas Fired Power Station) Order 2015
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Approval of Details reserved by Requirement 22 pursuant The Progress Power (Gas Fired Power Station) Order 2015
As published by the council, reference DC/25/05579
Application record
- Reference
- DC/25/05579
- Type
- Discharge of Requirement
- Status
- Granted
- Decision
- Granted
- Received
- 17 Dec 2025
- Validated
- 17 Dec 2025
- Decided
- 15 Apr 2026
- Ward
- Eye
- Parish
- Eye
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
17 Dec 2025
Received by Mid Suffolk
-
15 Apr 2026
Decision issued: Granted
-
9 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Mid Suffolk granted permission on 15 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
The Progress Power (Gas Fired Power Station) Order 2015
Approval of Details reserved by Requirement 22 pursuant The Progress Power (Gas Fired Power Station) Order 2015
Granted Conditions 12 docs -
Progress Power Eye
Application for Discharge of Condition for Requirement 9 (1) (Archeology) pursuant to The Progress Power (Gas Fired Power Station) Order 2015
Granted Conditions 10 docs -
Progress Power Eye
Application for Discharge of Condition for Requirement 9 (1) (Archeology) pursuant to The Progress Power (Gas Fired Power Station) Order 2015
Granted Conditions 10 docs -
Cranswick House Oaksmere Business Park Eye Airfield Industrial Estate Yaxley IP23 8BW
Request for Screening Opinion pursuant to The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 - The installation of one wind turbine of approximately 125-130m height to tip alongside foundations, underground cables and ancillary works.
Decided Outline 3 docs -
Cranswick House Oaksmere Business Park Eye Airfield Industrial Estate Yaxley IP23 8BW
Request for Screening Opinion pursuant to The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 - The installation of one wind turbine of approximately 125-130m height to tip alongside foundations, underground cables and ancillary works.
Decided Outline 3 docs -
White House Farm Old Norwich Road Yaxley Eye Suffolk IP23 8BH
Application under S73 for Removal or Variation of a Condition following grant of Planning Permission DC/24/03594 dated 09/01/2025 Town and Country Planning Act 1990 (as amended) -Conversion of Granary to form 1No Dwelling. - To vary Condition 2 (Approved Plans and Documents) (Revised Design) for provision of Carport (+ EV Charging) and Store, in area approved for parking, no provision for locked storage provided at initial conversion. No loss in parking provision across the site. As per documents/drawings submitted.
Granted Conditions 11 docsDomestic
Other condition discharge and variation applications
In Mid Suffolk
-
DC/26/03850 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03834 Awaiting decision
Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton
Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)
-
DC/26/03842 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03798 Awaiting decision
Land To The East Of Ely Road Barham Suffolk
Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)
-
DC/26/03802 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of Details reserved by Requirement 6 - Detailed Written Scheme of Investigation (DWSI) for Stage 3 - pursuant to The National Grid (Bramford To Twinstead Reinforcement) Order 2024 to approve area(s) - where no further archaeological investigation is required at land in the vicinity of Trenches 359-366 - as marked on the attached plans.