Planning application
Land Rear Of 30 Market Hill Sudbury Suffolk CO10 2EN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application under S73 for Removal or Variation of a Condition following grant of Planning Permission DC/25/01085 dated 01.05.2025. Town and Country Planning Act 1990 (as amended) - Erection of 4No. (terraced) dwellings and alterations/improvement to: (1) outbuilding to form cycle store, (2) boundary wall and (3) existing access. To vary condition 2 (Approved Plans and Documents).
As published by the council, reference DC/25/05227
Application record
- Reference
- DC/25/05227
- Type
- Full App Without Compliance of Condition
- Status
- Granted
- Decision
- Granted
- Received
- 27 Nov 2025
- Validated
- 28 Nov 2025
- Decided
- 23 Jan 2026
- Ward
- Sudbury South West
- Parish
- Sudbury
- Decision by
- Delegated Decision
- Postcode
- CO10 2EN
Timeline
Dates from the published record
-
27 Nov 2025
Received by Mid Suffolk
-
28 Nov 2025
Validated
Checked as complete and ready for consideration.
-
23 Jan 2026
Decision issued: Granted
-
9 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
Land To The Rear Of 30 Market Hill Sudbury Suffolk
Discharge of Conditions Application for DC/25/01085 - Conditions 8 (External Hard Surfacing), 13 (Access Surfacing) and 14 (Surface Water Discharge Prevention)
Granted Conditions 9 docs -
Land Rear Of 30 Market Hill Sudbury Suffolk CO10 2EN
95% historically approved · decision due ~19 Mar
Discharge of Conditions Application for DC/25/01085 - Conditions 3 (Materials), 4 (Fenestration), 5 (Rainwater Goods), 6 (Eaves and Verges), 7 (Vents), 9 (Boundary Treatments), 16 (Electric Vehicle Charging Points), and 20 (Archaeology) and 31 (Construction Management Plan)
Awaiting decision Conditions Windows or glazing 26 docs -
Land Rear Of 30 Market Hill Sudbury Suffolk CO10 2EN
Application under S73 for Removal or Variation of a Condition following grant of Planning Permission DC/25/01085 dated 01.05.2025. Town and Country Planning Act 1990 (as amended) - Erection of 4No. (terraced) dwellings and alterations/improvement to: (1) outbuilding to form cycle store, (2) boundary wall and (3) existing access. To vary condition 2 (Approved Plans and Documents).
Granted Conditions 14 docsSmall domestic -
Land To The Rear Of 30 Market Hill Sudbury Suffolk
Discharge of Conditions Application for DC/25/01085 - Conditions 8 (External Hard Surfacing), 13 (Access Surfacing) and 14 (Surface Water Discharge Prevention)
Granted Conditions 9 docs -
Land Rear Of 30 Market Hill Sudbury Suffolk CO10 2EN
95% historically approved · decision due ~19 Mar
Discharge of Conditions Application for DC/25/01085 - Conditions 3 (Materials), 4 (Fenestration), 5 (Rainwater Goods), 6 (Eaves and Verges), 7 (Vents), 9 (Boundary Treatments), 16 (Electric Vehicle Charging Points), and 20 (Archaeology) and 31 (Construction Management Plan)
Awaiting decision Conditions Windows or glazing 26 docs -
Land To The Rear Of 30 Market Hill Sudbury Suffolk
95% historically approved · decision due ~30 Mar
Application under Section 73 of The Town and Country Planning Act 1990 - Variation of Condition 2 (Approved Plans and Documents) and Condition 12 (Provision of Access Prior to Any Other Works Commencing) of Planning Permission DC/25/05227 dated 23/01/2026 - Erection of 4No. (terraced) dwellings and alterations/improvement to: (1) outbuilding to form cycle store, (2) boundary wall and (3) existing access.
Awaiting decision Conditions 11 docsSmall domestic
Other conditions applications
In Mid Suffolk
-
DC/26/03850 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03834 Awaiting decision
Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton
Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)
-
DC/26/03842 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03798 Awaiting decision
Land To The East Of Ely Road Barham Suffolk
Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)
-
DC/26/03802 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of Details reserved by Requirement 6 - Detailed Written Scheme of Investigation (DWSI) for Stage 3 - pursuant to The National Grid (Bramford To Twinstead Reinforcement) Order 2024 to approve area(s) - where no further archaeological investigation is required at land in the vicinity of Trenches 359-366 - as marked on the attached plans.