Planning application

Land South Of Tower Mill Lane/East Of Frog Hall Lane Hadleigh IP7 6LA

Granted Mid Suffolk DC/25/04823 Full Planning Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Full Planning Application - Erection of Electricity Sub-Station (relocation Sub-Station previously approved under DC/19/05419 (retention of))

As published by the council, reference DC/25/04823

Application record

Reference
DC/25/04823
Type
Full Planning Application
Status
Granted
Decision
Granted
Received
30 Oct 2025
Validated
31 Oct 2025
Decided
28 Jan 2026
Ward
Hadleigh South
Parish
Hadleigh
Decision by
Delegated Decision
Postcode
IP7 6LA

Site history

Applications at this address on the Mid Suffolk register

This site has had 3 applications since 2025: 2 approved, 0 refused.

  • DC/26/03487 Awaiting decision

    Land South Of Tower Mill Lane/East Of Frog Hall Lane Hadleigh IP7 6LA

    Non-material Amendment to DC/19/05419. Amend roof configuration on plots 227-234 (8 plots - Alnmouth house type) from pitched roofs to hipped roofs.

    Submitted 13 Aug 2026 Amendments
  • DC/25/03832 Granted

    Land South Of Tower Mill Lane/East Of Frog Hall Lane Hadleigh IP7 6LA

    Discharge of Conditions Application for DC/19/05419 - Condition 23 (Archaeology) and 24 (Archaeology)

    Decided 24 Sep 2025 Conditions

Timeline

Dates from the published record

  1. 30 Oct 2025

    Received by Mid Suffolk

  2. 31 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jan 2026

    Decision issued: Granted

  4. 9 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Mid Suffolk granted permission on 28 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land South Of Tower Mill Lane/East Of Frog Hall Lane Hadleigh IP7 6LA

    DC/25/04823 Submitted 30 Oct 2025 0m away

    Full Planning Application - Erection of Electricity Sub-Station (relocation Sub-Station previously approved under DC/19/05419 (retention of))

    Granted Full applications 17 docs
  • Land South Of Tower Mill Lane/East Of Frog Hall Lane Hadleigh IP7 6LA

    DC/25/03832 Submitted 29 Aug 2025 102m away

    Discharge of Conditions Application for DC/19/05419 - Condition 23 (Archaeology) and 24 (Archaeology)

    Granted Conditions 5 docs
  • Land South Of Emma Girling Close Hadleigh Suffolk

    DC/25/04522 Submitted 13 Oct 2025 102m away

    Discharge of Conditions Application for DC/19/05419 - Condition 9 (Surfacing Materials ) and 21 (Fire Hydrants)

    Granted Conditions 12 docs
  • Land South Of Tower Mill Lane/East Of Frog Hall Lane Hadleigh IP7 6LA

    DC/25/03832 Submitted 29 Aug 2025 102m away

    Discharge of Conditions Application for DC/19/05419 - Condition 23 (Archaeology) and 24 (Archaeology)

    Granted Conditions 5 docs
  • Land South Of Tower Mill Lane/East Of Frog Hall Lane Hadleigh Suffolk

    DC/25/00240 Submitted 17 Jan 2025 102m away

    95% historically approved · decision due ~14 Mar

    Application for the Modification of a Section 106 Planning Obligation relating to DC/19/05419 (Hybrid Permission inc 273 dwellings, commercial and pre-school proposals) to amend MIP clause, to amend tenure split on Affordables and Shared Ownership units, to allow for rent increases, to insert an enforceability clause and to amend exclusions clause at Para 1.6 of Schedule 2 Part 2 to include tenants who have exercised a right to buy and preserved right to buy.

    Awaiting decision Conditions 5 docs
    Major scheme
  • Land South Of Emma Girling Close Hadleigh Suffolk

    DC/25/04522 Submitted 13 Oct 2025 102m away

    Discharge of Conditions Application for DC/19/05419 - Condition 9 (Surfacing Materials ) and 21 (Fire Hydrants)

    Granted Conditions 12 docs

In Mid Suffolk

  • DC/26/02545 Withdrawn

    Phase 4 (Plot 2) Land On The South Side Of Ashbocking Road Henley IP6 0QX

    Full Planning Application - Erection of 1no. self-build dwelling (amended design of Plot 2 from extant approval DC/22/05402)

    12 Jun 2026 Full applications
  • DC/26/03762 Awaiting decision

    The Old Mill Mill Lane Metfield Harleston Suffolk IP20 0LD

    Full Planning Application - Demolition of existing garage and erection of side extension to an existing commercial unit to provide additional facilities including accessible wc, accessible ramp, kitchenette and meeting room.

    1 Sep 2026 Full applications
  • DC/26/03747 Awaiting decision

    The White Hart Church Street Stradbroke IP21 5HT

    Planning Application. Change of use of existing public house (Sui Generis) to 1no dwellinghouse (Use Class C3). No alterations are proposed to the external appearance of the building.

    28 Aug 2026 Full applications
  • DC/26/03698 Awaiting decision

    Newton Meadow Adj Oaklyn Fingal Street Worlingworth Suffolk

    Full Planning Application - Demolition and replacement of existing agricultural barns (benefit of Class Q prior approval ref: DC/26/01920) with single dwellinghouse incorporating ancillary residential annex and associated landscaping and parking.

    26 Aug 2026 Full applications
  • DC/26/03694 Awaiting decision

    The White House Top Road Wingfield IP21 5QT

    Planning Application. Installation of 28no ground mounted Canadian Solar 625W solar panels within an adjacent field. Installation of 2no Fox ESS EP12 battery storage units and 2x Solar PV inverters.

    25 Aug 2026 Full applications