Planning application
Land To The North And East Of Bobbits Lane Wherstead Suffolk
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application under S73A of The Town and Country Planning Act 1990 (as amended) - Variation of Condition 2 (Approved Plans and Documents) of planning permission DC/19/02798 dated 28/09/2020 - Development of roadside services, including 1no. petrol filling station (Sui Generis) 1no. drive through restaurant (Class A3 / A5) associated infrastructure and landscaping works
As published by the council, reference DC/25/02419
Application record
- Reference
- DC/25/02419
- Type
- Full App Without Compliance of Condition
- Status
- Awaiting decision
- Received
- 28 May 2025
- Validated
- 29 May 2025
- Ward
- Orwell
- Parish
- Wherstead
Site history
Applications at this address on the Mid Suffolk register
This site has had 2 applications since 2022: 1 approved, 0 refused.
-
DC/22/05293 Granted
Land To The North And East Of Bobbits Lane Wherstead Suffolk
Application for Non-Material Amendment relating to DC/19/02798 - To reduce building height, adjust window positions, add an additional door, and increase corral footprint
Timeline
Dates from the published record
-
28 May 2025
Received by Mid Suffolk
-
29 May 2025
Validated
Checked as complete and ready for consideration.
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 July 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid Suffolk took a median of 48 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
52 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Mid Suffolk for determination, against a statutory target of eight weeks. Over the last year Mid Suffolk decided condition discharge and variation applications in a median of 46 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Mid Suffolk
-
DC/26/03850 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03834 Awaiting decision
Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton
Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)
-
DC/26/03842 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024
-
DC/26/03798 Awaiting decision
Land To The East Of Ely Road Barham Suffolk
Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)
-
DC/26/03802 Awaiting decision
The National Grid (Bramford To Twinstead Reinforcement) Order 2024
Submission of Details reserved by Requirement 6 - Detailed Written Scheme of Investigation (DWSI) for Stage 3 - pursuant to The National Grid (Bramford To Twinstead Reinforcement) Order 2024 to approve area(s) - where no further archaeological investigation is required at land in the vicinity of Trenches 359-366 - as marked on the attached plans.