Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To The South Of Thompson And Morgan Poplar Lane Sproughton Suffolk

Split decision Mid Suffolk DC/24/02111 Discharge of Condition(s)

Part of this application was approved and part refused. The decision notice on the council portal sets out which is which.

Proposal

Discharge of Conditions Application for DC/21/05110 - Condition 3 (Proposed Access) and Condition 4 (Surface Water - Highway)

As published by the council, reference DC/24/02111

Application record

Reference
DC/24/02111
Type
Discharge of Condition(s)
Status
Decided
Decision
Part approved, part refused As published: Part Granted/Part Refused
Received
3 May 2024
Validated
3 May 2024
Decided
11 Jul 2024
Ward
Sproughton & Pinewood
Parish
Sproughton
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 3 May 2024

    Received by Mid Suffolk

  2. 11 Jul 2024

    Decision issued: Part Granted/Part Refused

  3. 25 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Daventry

50 applications on PlanIndex · across 26 councils · 96% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • Land To The South Of Thompson And Morgan Poplar Lane Sproughton Suffolk

    DC/25/04204 Submitted 22 Sep 2025 0m away

    Discharge of Conditions Application for DC/21/05110 - Conditions 5 (Construction Management Plan) and 8 (Construction Surface Water Management Plan)

    Split decision Conditions 15 docs
  • Land To The South Of Thompson And Morgan Poplar Lane Sproughton Suffolk

    DC/24/02111 Submitted 3 May 2024 0m away

    Discharge of Conditions Application for DC/21/05110 - Condition 3 (Proposed Access) and Condition 4 (Surface Water - Highway)

    Split decision Conditions 26 docs
  • Land To The South Of Thompson And Morgan Poplar Lane Sproughton Suffolk

    DC/25/05508 Submitted 16 Dec 2025 0m away

    Submission of Details Application (Application for approval of Reserved Matters in part) for Outline Planning Permission DC/21/05110 dated 22/12/2022 - Town and Country Planning (Development Planning Procedure) (England) Order 2015 (as amended) - Hybrid Application. Outline Planning Application for Interchange 55 comprising predominantly industrial (B2 use) and warehousing (B8 use) and prospective offices, research and light industry (E(g) (i, ii, iii) uses) buildings. Full Planning Application for access to the development and associated landscaping. - Details of Access in relation to Phase 1 infrastructure, incorporating access and drainage to the first two development plots.

    Granted Reserved matters 47 docs
  • Land To The South Of Thompson And Morgan Poplar Lane Sproughton Suffolk

    DC/25/04204 Submitted 22 Sep 2025 0m away

    Discharge of Conditions Application for DC/21/05110 - Conditions 5 (Construction Management Plan) and 8 (Construction Surface Water Management Plan)

    Split decision Conditions 15 docs
  • Land To The South Of Thompson And Morgan Poplar Lane Sproughton Suffolk

    DC/25/05508 Submitted 16 Dec 2025 0m away

    Submission of Details Application (Application for approval of Reserved Matters in part) for Outline Planning Permission DC/21/05110 dated 22/12/2022 - Town and Country Planning (Development Planning Procedure) (England) Order 2015 (as amended) - Hybrid Application. Outline Planning Application for Interchange 55 comprising predominantly industrial (B2 use) and warehousing (B8 use) and prospective offices, research and light industry (E(g) (i, ii, iii) uses) buildings. Full Planning Application for access to the development and associated landscaping. - Details of Access in relation to Phase 1 infrastructure, incorporating access and drainage to the first two development plots.

    Granted Reserved matters 47 docs
  • Land To The South Of Thompson And Morgan Poplar Lane Sproughton Suffolk

    DC/25/05445 Submitted 12 Dec 2025 0m away

    Discharge of Conditions Application for DC/21/05110 - Part discharge of Condition 5 (Construction Management Plan) for enabling works only C

    Split decision Conditions 5 docs

In Mid Suffolk

  • DC/26/03850 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024

    4 Sep 2026 Conditions
  • DC/26/03834 Awaiting decision

    Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton

    Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)

    3 Sep 2026 Conditions
  • DC/26/03842 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024

    3 Sep 2026 Conditions
  • DC/26/03798 Awaiting decision

    Land To The East Of Ely Road Barham Suffolk

    Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)

    2 Sep 2026 Conditions
  • DC/26/03802 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of Details reserved by Requirement 6 - Detailed Written Scheme of Investigation (DWSI) for Stage 3 - pursuant to The National Grid (Bramford To Twinstead Reinforcement) Order 2024 to approve area(s) - where no further archaeological investigation is required at land in the vicinity of Trenches 359-366 - as marked on the attached plans.

    2 Sep 2026 Conditions