Skip to content
PlanIndex Get alerts
Menu

Planning application

DC/17/04766

Copperas Reach Shore Lane Harkstead Ipswich Suffolk IP9 1BW

Granted Mid Suffolk Discharge of Condition(s)

Proposal

Discharge of Conditions for planning application B/17/01150 - Condition 5 (Construction Management) and Condition 10 (Biodiversity Method Statement)

As published by the council, reference DC/17/04766

Timeline

Dates from the published record

  1. 20 Sep 2017

    Received by Mid Suffolk

  2. 21 Sep 2017

    Validated

    Checked as complete and ready for consideration.

  3. 7 Nov 2017

    Decision issued: Granted

  4. 27 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • DC/17/04965 Granted

    Copperas Reach Shore Lane Harkstead Ipswich Suffolk IP9 1BW

    Discharge of Conditions Application for B/17/01150 - Conditon 3 (Materials), Condition 4 (Agreement of Levels), Condition 7 and 8 (Landscaping) Condition 10 Condition 11 (Lighting Design Scheme)

    30 Sep 2017 0m away Conditions
  • DC/17/04766 Granted

    Copperas Reach Shore Lane Harkstead Ipswich Suffolk IP9 1BW

    Discharge of Conditions for planning application B/17/01150 - Condition 5 (Construction Management) and Condition 10 (Biodiversity Method Statement)

    20 Sep 2017 0m away Conditions
  • DC/17/04965 Granted

    Copperas Reach Shore Lane Harkstead Ipswich Suffolk IP9 1BW

    Discharge of Conditions Application for B/17/01150 - Conditon 3 (Materials), Condition 4 (Agreement of Levels), Condition 7 and 8 (Landscaping) Condition 10 Condition 11 (Lighting Design Scheme)

    30 Sep 2017 0m away Conditions
  • DC/17/04516 Granted

    Land Adjacent To Rosedale Holbrook Road Harkstead Suffolk

    Application under section 73 of the Town and Country Planning Act "Erection of dwelling and garage and construction of new vehicular access" Reference B/17/00243 without compliance with Condition 2 (Approved Plans) to revise scale and layout.

    4 Sep 2017 338m away Conditions
  • DC/17/04516 Granted

    Land Adjacent To Rosedale Holbrook Road Harkstead Suffolk

    Application under section 73 of the Town and Country Planning Act "Erection of dwelling and garage and construction of new vehicular access" Reference B/17/00243 without compliance with Condition 2 (Approved Plans) to revise scale and layout.

    4 Sep 2017 338m away Conditions
  • DC/17/05058 Granted

    Land West Of Hill Cottage The Street Harkstead IP9 1BN

    Discharge of Conditions for planning application B/16/01456. Condition 4: Action Required in Accordance with a Specific Timetable:Agreement of Materials: See attached Covering Letter dated 5 October 2017 and Render Colour chartCondition 5. Action Required Prior To The First Occupation of Development:Details of Screen Walls and Fences: See attached Covering Letter dated 5 October 2017 and plan "Condition 5: Details of Screen Walls and Fences" drawing Discharge of Conditions for application B/16/01456, Conditions 4,5,6,7,8 and 10. GL.PR.1.1a dated 15 August 2017.Condition 6. Action Required Prior To Commencement of Development:Landscaping Scheme: See attached Covering Letter dated 5 October 2017 and plan "Condition 6: Landscaping Scheme" drawing GL.PR.1.1b dated 15 August 2017.Condition 7. Action Required Prior To Commencement of Development:Agreement of Measures to Improve Sustainability of Development: See attached Covering Letter dated 5 October 2017 and Sustainability Statement" dated 5 October 2017.Condition 8. Action Required in Accordance With A Specific Timetable - SurfaceWater Drainage Details: See attached Covering Letter and plan "Condition 8: Details of Surface Water Drainage" drawing GL.PR.1.1c dated 15 August 2017.Condition 10. Action Required Prior To Commencement of Works To Access:Highways - Surface Water Discharge Prevention Details Required: See attached Covering Letter dated 5 October 2017 and plan "Condition 10: Details of Highways - Surface Water Discharge Prevention" drawing GL.PR.1.1d dated 15 August 2017.

    5 Oct 2017 378m away Conditions

In Mid Suffolk

  • DC/26/03296 Awaiting decision

    22 King Street Sudbury Suffolk CO10 2EN

    Discharge of Conditions Application for DC/26/01545 - Conditions 3 (Floor Finishes) and 4 (Lighting)

    31 Jul 2026 Conditions
  • DC/26/02972 Granted

    Acorn Place Saxham Street Stowupland Stowmarket Suffolk IP14 5DA

    Discharge of Conditions Application for DC/26/01170 - Condition 3 (Biodiversity Enhancement)

    10 Jul 2026 Conditions
  • DC/26/03290 Awaiting decision

    Valley Farm Valley Lane Buxhall Stowmarket Suffolk IP14 3EB

    Discharge of Conditions Application for DC/26/02091 - Condition 4 (Great Crested Newt Licence)

    30 Jul 2026 Conditions
  • DC/26/03292 Awaiting decision

    Hop Hall Somerton Road Hartest Bury St Edmunds Suffolk IP29 4NA

    Discharge of Conditions Application for DC/23/04860 - 4 (External Facing And Roofing Materials), 5 (Landscaping), 6 (Surface Water), 8 (Access), 9 (Refuse and Recycling Bins) and 11 (Gradient of Access and Driveway)

    30 Jul 2026 Conditions
  • DC/26/03277 Awaiting decision

    The Hovell 25 High Street Thorndon Eye Suffolk IP23 7LX

    Discharge of Conditions Application for DC/26/00006 - Conditions 3 (Construction Management Plan), 4 (Biodiversity Method Statement), 5 (Surface Water Discharge Prevention), 6 (Roofing Material), 8 (Biodiversity Enhancement Strategy), 9 (Wildlife Sensitive Lighting Design scheme) and 10 (Cycle Storage)

    30 Jul 2026 Conditions