Planning application
LA02/2026/0524/DC
The Swift Restaurant 2 Rodgers Quay Carrickfergus BT38 8BE
Proposal
Discharge of Condition No.2 of LA02/2024/0900/DCA - Signed extract from the JCT Standard Building Contract (without quantities) for the construction of the approved development.
As published by the council, reference LA02/2026/0524/DC
Timeline
Dates from the published record
-
8 Jul 2026
Received by Mid and East Antrim
-
10 Jul 2026
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Mid and East Antrim for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
LA02/2026/0512/DC Awaiting decision
Premier Inn Hotel Rodgers Quay Carrickfergus BT38 8BE
Discharge of Condition Nos. 4 & 5 of LA02/2024/0722/F - Construction Environmental Management Plan & Piling Risk Assessment.
-
LA02/2025/0811/LBC Granted
Carrickfergus Harbour
Slipways: Repointing to stone masonry walls. King William Pier (grade B1 listed) KWP is in poor structural condition and require remedial works to ensure its stability. . There are two main distinguishabe forms of construction: - 'square' masonry blocks sections, with old pointing washed out: Record information indicates that part of this pier was taken down and rebuilt in 1990 due to its poor condition, and underpinning carried out. Due to funding issues, the repairs were undertaken only at discrete locations and the remaining unrepaired areas continued to deteriorate. A similar underpin/concrete skirt is proposed throughout the pier, with top level maximum 450mm below mid tide level. Repointing throughout is proposed. - round head: The bottom layer consists of unbound round loose stones that have moved over time, causing the structure to lose its integral form. It is proposed to underpin the bottom layer of stones with a concrete skirt. The top level of the skirt will be below mid-tide level. The head is believed to be founded on boulder clay, different that the remaining of the harbour founded in marl. Floor stones to be lifted and reset. Modern harbour, part of KWP setting: Albert Edward Pier There is a short section with large sandstones that are eroded and large voids noted. Some of the coping stones are loose as the underlaying sandstone eroded. Coping stones to be lifted and reset over a steel plate to bridge the gaps while leaving the eroded sandstone in place. Repointing to the back of sandstone blocks. The concrete outer parapet wall is in very poor condition with large cracks and voids noted. A new RC skin is proposed. Anodes are to be installed to the sheet pile walls. North Wall Apply sealant to joints Alexandra Pier The outer parapet wall is in very poor condition with large cracks and voids noted. A new RC skin is proposed. Anodes are to be installed to the sheet pile walls.
-
LA02/2025/0843/F Granted
Carrickfergus Harbour
Works to slipways, involving repointing to stone masonry walls. Works to King William Pier including underpin/concrete skirt and repointing throughoutproposed. Works to Albert Edward Pier involve the coping stones to be lifted and reset over a steel plate to bridge the gaps while leaving the eroded sandstone in place. Repointing to the back of sandstone blocks. A new RC skin is proposed. Anodes are to be installed to the sheet pile walls. Works to the North Wall involve applying sealant to joints Works to Alexandra Pier include a new RC skin and anodes are to be installed to the sheet pile walls.
-
LA02/2025/0806/DCA Granted
Adjacent to Albert Edward Pier (on the seaward side, behind the parapet).
Demolition of derelict piles from the old boatclub.
-
LA02/2026/0072/F Granted
10m immediately south east of Jobs and Benefits Centre, Irish Quarter South, Carrickfergus, BT38 8DJ
Propposed telecommunications development comprising the installation of 1 no. new 20.0 m high CS Orion monopole, 6 no. TEF antennas, together with 3 no. TEF RRUs and 2 no. TEF Ø300 mm transmission dishes. At ground level, the proposal includes the installation of 3 no. equipment cabinets.
-
LA02/2026/0113/F Granted
18 West Street, Carrickfergus, BT38 7AR
Replacement shopfront and installation of independent access door to apartment
Other conditions applications
In Mid and East Antrim
-
LA02/2026/0451/DC Decided
Lands 100m west of 51 Paisley Road, Carrickfergus
Discharge of Condition 2 of application LA02/2025/0801/F- Submission of Programme of Archaeological Work (POW)
-
LA02/2026/0482/DC Decided
Lands opposite and to the east of Nos 6 - 12 Ballyboley Road, Larne
Discharge of Conditions 3,4 and 5 of Planning Approval LA02/2025/0962/F
-
LA02/2026/0499/DC Decided
1&2 Old School Gate Woodtown Road Ballymena BT43 5FP
Discharge of Condition No. 9 of LA02/2022/0420/F - No development shall take place on site until the method of sewage disposal has been agreed in writing with Council or a consent to discharge has been granted under the terms of the Water (NI) Order 1999.
-
LA02/2026/0383/DC Decided
Lands in the townland of Rathsherry. east of Tullymore Road and south and north of Longmore Road Broughshane, Ballymena
Discharge of Condition No.12 from G/2011/0162/F - Bird Monitoring Programme (BMP) - Year 10
-
LA02/2026/0512/DC Awaiting decision
Premier Inn Hotel Rodgers Quay Carrickfergus BT38 8BE
Discharge of Condition Nos. 4 & 5 of LA02/2024/0722/F - Construction Environmental Management Plan & Piling Risk Assessment.