Planning application
Lands to the North of Premier Inn Hotel and East of Rodgers Quay, Carrickfergus Waterfront, Carrickfergus BT38 8BE
Works: New dwelling Demolition Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of Existing building and redevelopment for residential comprising of 33 no Apartments (9no. 2 bed and 24no. 3 Bed) within 3 No. Three and half storey buildings including access, car parking, cycle parking, landscaping and all associated site works.
As published by the council, reference LA02/2024/0899/F
Application record
- Reference
- LA02/2024/0899/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 6 Dec 2024
- Validated
- 12 Dec 2024
- Decided
- 3 Jun 2026
- Ward
- Castle (Mid and East Antrim)
- Postcode
- BT38 8BE
Timeline
Dates from the published record
-
6 Dec 2024
Received by Mid and East Antrim
-
12 Dec 2024
Validated
Checked as complete and ready for consideration.
-
3 Jun 2026
Decision issued: Granted
-
27 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Belfast
210 applications on PlanIndex · across 11 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
53 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Lands to the North of Premier Inn Hotel and East of Rodgers Quay, Carrickfergus Waterfront, Carrickfergus BT38 8BE
Demolition of Existing building and redevelopment for residential comprising of 33 no Apartments (9no. 2 bed and 24no. 3 Bed) within 3 No. Three and half storey buildings including access, car parking, cycle parking, landscaping and all associated site works.
Granted Heritage and listed buildings New dwelling Demolition 30 docsMajor scheme -
The Swift Restaurant 2 Rodgers Quay Carrickfergus BT38 8BE
Discharge of Condition No.2 of LA02/2024/0900/DCA - Signed extract from the JCT Standard Building Contract (without quantities) for the construction of the approved development.
Decided Conditions 6 docs -
Premier Inn Hotel Rodgers Quay Carrickfergus BT38 8BE
92% historically approved · decision due ~28 Aug
Discharge of Condition Nos. 4 & 5 of LA02/2024/0722/F - Construction Environmental Management Plan & Piling Risk Assessment.
Awaiting decision Conditions 6 docs -
Carrickfergus Harbour
Slipways: Repointing to stone masonry walls. King William Pier (grade B1 listed) KWP is in poor structural condition and require remedial works to ensure its stability. . There are two main distinguishabe forms of construction: - 'square' masonry blocks sections, with old pointing washed out: Record information indicates that part of this pier was taken down and rebuilt in 1990 due to its poor condition, and underpinning carried out. Due to funding issues, the repairs were undertaken only at discrete locations and the remaining unrepaired areas continued to deteriorate. A similar underpin/concrete skirt is proposed throughout the pier, with top level maximum 450mm below mid tide level. Repointing throughout is proposed. - round head: The bottom layer consists of unbound round loose stones that have moved over time, causing the structure to lose its integral form. It is proposed to underpin the bottom layer of stones with a concrete skirt. The top level of the skirt will be below mid-tide level. The head is believed to be founded on boulder clay, different that the remaining of the harbour founded in marl. Floor stones to be lifted and reset. Modern harbour, part of KWP setting: Albert Edward Pier There is a short section with large sandstones that are eroded and large voids noted. Some of the coping stones are loose as the underlaying sandstone eroded. Coping stones to be lifted and reset over a steel plate to bridge the gaps while leaving the eroded sandstone in place. Repointing to the back of sandstone blocks. The concrete outer parapet wall is in very poor condition with large cracks and voids noted. A new RC skin is proposed. Anodes are to be installed to the sheet pile walls. North Wall Apply sealant to joints Alexandra Pier The outer parapet wall is in very poor condition with large cracks and voids noted. A new RC skin is proposed. Anodes are to be installed to the sheet pile walls.
Granted Heritage and listed buildings 67 docs -
Carrickfergus Harbour
Works to slipways, involving repointing to stone masonry walls. Works to King William Pier including underpin/concrete skirt and repointing throughoutproposed. Works to Albert Edward Pier involve the coping stones to be lifted and reset over a steel plate to bridge the gaps while leaving the eroded sandstone in place. Repointing to the back of sandstone blocks. A new RC skin is proposed. Anodes are to be installed to the sheet pile walls. Works to the North Wall involve applying sealant to joints Works to Alexandra Pier include a new RC skin and anodes are to be installed to the sheet pile walls.
Granted Full applications 81 docs -
Adjacent to Albert Edward Pier (on the seaward side, behind the parapet).
Demolition of derelict piles from the old boatclub.
Granted Heritage and listed buildings Demolition 11 docs
Other full applications applications
In Mid and East Antrim
-
LA02/2026/0470/F Refused
40m SE OF 80 WHITESIDES ROAD,BALLYMENA
2no DWELLINGS AND GARAGES IN EXISTING CLUSTER
-
LA02/2026/0212/F Granted
Adjacent land to the west of Unit 9 Woodside Road Ballymena.
Retrospective extension of curtilage for container storage area and trailer parking area ancillary to Unit 9 Carey Cleaning Machines to include proposed access and turning area.
-
LA02/2026/0154/F Refused
87 Liminary Road Ballymena BT42 3HN
Increase of curtilage and replacement stables to existing dwelling
-
LA02/2026/0200/F Granted
Barn United Football & Recreational Club 4 Taylors Avenue, Carrickfergus, BT38 7HF
Provision of new 3G pitch on site of existing grass pitch, new floodlighting, fencing, dugouts and 200 seater grandstand and associated site works
-
LA02/2026/0626/F Awaiting decision
ADJACENT TO 5 CARNLEA ROAD
Change of design type from that approved under G/2003/0414/O and G/2006/0928/RM and LA02/2026/0244/CLOPUD to new storey and a half dwelling along with garage and stables and paddock for hobby use