Planning application
Approximately 130m south east of No. 144 Fenaghy Road and traveling southward between the Fenaghy road and the eastern bank of the River Maine. Crossing to the west bank immediately north of the Galgorm Group site. Finally crossing back to the Fenaghy Road side approx. 105m north-east of No.1 Corbally Road. Continuing beneath the Corbally Road overpass, concludes when joining the existing path immediately adjacent the River Maine approx. 55m north-east of No.1 Corbally Road.
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Provision of a public greenway including 2 No. bridge crossings over the River Maine.
As published by the council, reference LA02/2025/0477/F
Application record
- Reference
- LA02/2025/0477/F
- Type
- Full
- Status
- Consultation Open
- Received
- 10 Jun 2025
- Validated
- 17 Jun 2025
- Ward
- Maine
Timeline
Dates from the published record
-
10 Jun 2025
Received by Mid and East Antrim
-
17 Jun 2025
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mid and East Antrim took a median of 65 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
62 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Mid and East Antrim for determination, against a statutory target of eight weeks. Over the last year Mid and East Antrim decided full applications in a median of 73 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Lands between No.'s 116a, 116 and 120 Fenaghy Road Galgorm, Ballymena
Proposed site for 1 no. infill/cluster dwelling
Withdrawn Outline Extension 13 docsDomestic -
116 Fenaghy Road, Galgorm, Ballymena, BT42 1JJ
Proposed rear two storey extension to holiday let self catering accommodation and alteration to front elevation dormers
Granted Full applications Extension Loft or dormer 11 docs -
116-118 FENAGHY ROAD FENAGHY BALLYMENA BT42 1JJ
93% historically approved · decision due ~21 Aug
Proposed double garage to service No's 116-118 Fenaghy Road on ground floor and tourist apartment for short term letting on first floor on site directly opposite No. 116-118 Fenaghy Road, Galgorm.
Awaiting decision Full applications 13 docs -
83 Fenaghy Road, Galgorm BT42 1JJ
Rear 2 storey extension to dwelling
Granted Full applications ExtensionDomestic -
Other full applications
In Mid and East Antrim
-
LA02/2026/0285/F Granted
47A CHESTER AVENUE WHITEHEAD CARRICKFERGUS BT38 9QJ
Provision of single storey extension to rear of dwelling with balcony
-
LA02/2026/0650/F Awaiting decision
70M SW OF 70 Glenravel Road, Martinstown
Stables
-
LA02/2026/0651/F Awaiting decision
75m SE of 100 Fenaghy Road, Galgorm, Ballymena, BT42 1JJ
Proposed replacement dwelling and garage with new access and retention of existing for storage
-
LA02/2026/0430/F Granted
351 Doury Road, Ballymena, BT44 9RD
Proposed two storey extension to the side of an existing dwelling providing new living and bedroom accommodation
-
LA02/2026/0420/F Granted
25 Martinstown Road, Martinstown, Ballymena, BT43 7LT
Alterations and Extension to existing dwelling