Planning application
High Path Estate South Wimbledon SW19 2TG
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
APPLICATION FOR (PHASE 3A.2) APPROVAL OF RESERVED MATTERS (APPROVAL OF RESERVED MATTERS (ACCESS, LAYOUT, SCALE, APPEARANCE AND LANDSCAPING) PURSUANT TO OUTLINE PLANNING PERMISSION REF: 22/P1740, FOR THE DEMOLITION OF 11 OF THE HUDSON COURT GARAGES, NOT INCLUDING ANY WORKS TO THE GROUND FLOOR SLAB) Application for variation of condition 8 (energy strategy), 11 (district heat network - London heat map), 26 (energy centre), 30 (noise mitigation) and 40 (combined heat and power) attached to LBM planning application 21/p2806 relating to application for variation of condition 3 to outline planning permission reference 17/p1721 relating to phase 3 of the High Path Estate redevelopment (with all matters reserved, except in relation to parameter plans) for the comprehensive phased regeneration of high path estate comprising demolition of all existing buildings and structures; providing up to 1570 residential units (c3 use class); provision of up to 9,900 sqm of commercial and community floorspace (inc replacement and new floorspace, comprising: up to 2,700 sqm of use class a1 and/or a2, and/or a3 and/or a4 floorspace, up to 4,100 sqm of use class b1 (office) floorspace, up to 1,250 sqm of flexible work units (use class b1), up to 1,250 sqm of use class d1 (community) floorspace; up to 600 sqm of use class d2 (gym) floorspace); provision of new neighbourhood park and other communal amenity spaces, incl children's play space; public realm, landscaping, lighting; cycle parking (incl visitor cycle parking) and car parking (inc within ground level podiums), associated highways and utilities works.
As published by the council, reference 25/P3307
Application record
- Reference
- 25/P3307
- Type
- Approval Of Reserved Matters
- Status
- REGISTERED
- Received
- 12 Nov 2025
- Validated
- 26 Nov 2025
- Ward
- Abbey
- Decision by
- Delegated
- Postcode
- SW19 2TG
Timeline
Dates from the published record
-
12 Nov 2025
Received by Merton
-
26 Nov 2025
Validated
Checked as complete and ready for consideration.
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Merton took a median of 47 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Merton for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About reserved matters applications
How this application type works
A reserved matters application fills in the detail held back from an earlier outline permission, typically appearance, landscaping, layout, scale or access. The council judges it against the outline permission already granted, not the principle of development, which is settled. It must normally be submitted within three years of the outline decision.
Nearby applications
Within 500 metres
-
Eastfields Estate Mitcham Surrey
APPLICATION FOR DISCHARGE OF CONDITION 5 (DEVELOPMENT PARAMETERS AND DESIGN CODE), 6 (URBAN DESIGN STRATEGY) AND 23 (LANDSCAPING) ATTACHED TO LBM PLANNING PERMISSION 21/P4078 RELATING TO THE APPLICATION FOR VARIATION OF CONDITION 3 (LIST OF APPROVED DRAWINGS), 7 (ENERGY & SUSTAINABILITY STRATEGY), 23 (ENERGY CENTRE), 38 (COMBINED HEAT & POWER), 39 (DISTRICT HEAT NETWORKS) & 40 (DISTRICT HEAT NETWORKS) ATTACHED TO LBM PLANNING APPLICATION 17/P1717 OUTLINE PLANNING APPLICATION (WITH ALL MATTERS RESERVED, EXCEPT IN RELATION TO PARAMETER PLANS) FOR THE COMPREHENSIVE REGENERATION OF THE EASTFIELDS ESTATE COMPRISING THE DEMOLITION OF ALL EXISTING BUILDINGS AND STRUCTURES; ERECTION OF NEW BUILDINGS PROVIDING UP TO 800 RESIDENTIAL UNITS (C3 USE CLASS); PROVISION OF UP TO 275 SQM OF NON-RESIDENTIAL FLOORSPACE (FLEXIBLE USE CLASSES A1 AND/OR A2 AND/OR A3 AND/OR A4 AND/OR B1 AND/OR D1 AND/OR D2)PROVISION OF NEW PUBLIC OPEN SPACE AND COMMUNAL AMENITY SPACES INCLUDING CHILDREN'S PLAY SPACE; NEW PUBLIC REALM, LANDSCAPING WORKS AND NEW LIGHTING; CYCLE PARKING SPACES (INCLUDING NEW VISITOR CYCLE PARKING) AND CAR PARKING SPACES (INCLUDING WITHIN GROUND LEVEL PODIUMS), TOGETHER WITH ASSOCIATED HIGHWAYS AND UTILITIES WORKS.
Withdrawn Conditions Demolition -
Eastfields Estate Mitcham Surrey
APPLICATION FOR (PHASE 1C) DISCHARGE OF CONDITION 5 (SAMPLE OF MATERIALS) AND 6 (SAMPLE OF SURFACING) ATTACHED TO LBM PLANNING PERMISSION 21/P4430 RELATING TO THE Application for Reserved Matters (Phases 1A, 1B, 1C, 1D & 1E) following Outline Planning Permission 17/P1717 (as amended by Section 73 application reference 21/P4078) relating to the Outline Planning Application (with all matters reserved, except in relation to parameter plans) for the comprehensive regeneration of the Eastfields Estate comprising the demolition of all existing buildings and structures; erection of new buildings providing up to 800 residential units (C3 Use Class); provision of up to 275 sqm of non-residential floorspace (flexible use Classes A1 and/or A2 and/or A3 and/or A4 and/or B1 and/or D1 and/or D2) provision of new public open space and communal amenity spaces including children's play space; new public realm, landscaping works and new lighting; cycle parking spaces (including new visitor cycle parking) and car parking spaces (including within ground level podiums), together with associated highways and utilities works.
Granted Conditions Demolition 10 docs -
Eastfields Estate Mitcham Surrey
98% historically approved · decision due ~19 Jan
APPLICATION FOR (PHASE 1A) DISCHARGE OF CONDITION 14 (NOISE AND VIBRATION) ATTACHED TO LBM PLANNING PERMISSION 21/P4078 RELATING TO THE APPLICATION FOR VARIATION OF CONDITION 3 (LIST OF APPROVED DRAWINGS), 7 (ENERGY & SUSTAINABILITY STRATEGY), 23 (ENERGY CENTRE), 38 (COMBINED HEAT & POWER), 39 (DISTRICT HEAT NETWORKS) & 40 (DISTRICT HEAT NETWORKS) ATTACHED TO LBM PLANNING APPLICATION 17/P1717 OUTLINE PLANNING APPLICATION (WITH ALL MATTERS RESERVED, EXCEPT IN RELATION TO PARAMETER PLANS) FOR THE COMPREHENSIVE REGENERATION OF THE EASTFIELDS ESTATE COMPRISING THE DEMOLITION OF ALL EXISTING BUILDINGS AND STRUCTURES; ERECTION OF NEW BUILDINGS PROVIDING UP TO 800 RESIDENTIAL UNITS (C3 USE CLASS); PROVISION OF UP TO 275 SQM OF NON-RESIDENTIAL FLOORSPACE (FLEXIBLE USE CLASSES A1 AND/OR A2 AND/OR A3 AND/OR A4 AND/OR B1 AND/OR D1 AND/OR D2)PROVISION OF NEW PUBLIC OPEN SPACE AND COMMUNAL AMENITY SPACES INCLUDING CHILDREN'S PLAY SPACE; NEW PUBLIC REALM, LANDSCAPING WORKS AND NEW LIGHTING; CYCLE PARKING SPACES (INCLUDING NEW VISITOR CYCLE PARKING) AND CAR PARKING SPACES (INCLUDING WITHIN GROUND LEVEL PODIUMS), TOGETHER WITH ASSOCIATED HIGHWAYS AND UTILITIES WORKS.
Awaiting decision Conditions Demolition 2 docs -
Eastfields Estate Mitcham Surrey
APPLICATION FOR ()PHASE 1C) DISCHARGE OF CONDITION 23 (LANDSCAPING), ATTACHED TO LBM PLANNING PERMISSION 21/P4078 RELATING TO THE APPLICATION FOR VARIATION OF CONDITION 3 (LIST OF APPROVED DRAWINGS), 7 (ENERGY & SUSTAINABILITY STRATEGY), 23 (ENERGY CENTRE), 38 (COMBINED HEAT & POWER), 39 (DISTRICT HEAT NETWORKS) & 40 (DISTRICT HEAT NETWORKS) ATTACHED TO LBM PLANNING APPLICATION 17/P1717 OUTLINE PLANNING APPLICATION (WITH ALL MATTERS RESERVED, EXCEPT IN RELATION TO PARAMETER PLANS) FOR THE COMPREHENSIVEREGENERATION OF THE EASTFIELDS ESTATECOMPRISING THE DEMOLITION OF ALL EXISTING BUILDINGS AND STRUCTURES; ERECTION OF NEW BUILDINGS PROVIDING UP TO 800 RESIDENTIAL UNITS (C3 USE CLASS); PROVISION OF UP TO 275 SQM OF NON-RESIDENTIAL FLOORSPACE (FLEXIBLE USE CLASSES A1 AND/OR A2 AND/OR A3 AND/OR A4 AND/OR B1 AND/OR D1 AND/OR D2)PROVISION OF NEW PUBLIC OPEN SPACE AND COMMUNAL AMENITY SPACES INCLUDING CHILDREN'S PLAY SPACE; NEW PUBLIC REALM, LANDSCAPING WORKS AND NEW LIGHTING; CYCLE PARKING SPACES (INCLUDING NEW VISITOR CYCLE PARKING) AND CAR PARKING SPACES (INCLUDING WITHIN GROUND LEVEL PODIUMS), TOGETHER WITH ASSOCIATED HIGHWAYS AND UTILITIES WORKS.
Granted Conditions Demolition 9 docs -
HIGH PATH DEVELOPMENT PROJECTS High Path, Wimbledon, Merton
98% historically approved · decision due ~19 Jan
APPLICATION FOR (14B SITE OF PHASE 2) PARTIAL DISCHARGE OF CONDITION 4 (PILING) - RESERVED MATTERS CONDITION) ATTACHED TO LBM PLANNING PERMISSION 25/P1184 and 19/P1852 RELATING TO THE APPLICATION FOR (PHASE 2) VARIATION OF CONDITION 2 (APPROVED PLANS), ATTACHED TO LBM PLANNING APPLICATION 19/P1852 RELATING TO THE APPLICATION FOR APPROVAL OF RESERVED MATTERS (PHASE 2) FOLLOWING OUTLINE PERMISSION 22/P1740 FOR THE COMPREHENSIVE PHASED REGENERATION OF HIGH PATH ESTATE COMPRISING DEMOLITION OF ALL EXISTING BUILDINGS AND STRUCTURES; ERECTION OF NEW BUILDINGS RANGING FROM 1 TO 10 STOREYS MAX, PROVIDING UP TO 1570 RESIDENTIAL UNITS (C3 USE CLASS); PROVISION OF UP TO 9,900 SQM OF COMMERCIAL AND COMMUNITY FLOORSPACE (INC REPLACEMENT AND NEW FLOORSPACE, COMPRISING: UP TO 2,700 SQM OF USE CLASS A1 AND/OR A2, AND/OR A3 AND/OR A4 FLOORSPACE, UP TO 4,100 SQM OF USE CLASS B1 (OFFICE) FLOORSPACE, UP TO 1,250 SQM OF FLEXIBLE WORK UNITS (USE CLASS B1), UP TO 1,250 SQM OF USE CLASS D1 (COMMUNITY) FLOORSPACE; UP TO 600 SQM OF USE CLASS D2 (GYM) FLOORSPACE); PROVISION OF NEW NEIGHBOURHOOD PARK AND OTHER COMMUNAL AMENITY SPACES, INCL. CHILDREN'S PLAY SPACE; PUBLIC REALM, LANDSCAPING, LIGHTING; CYCLE PARKING (INCL VISITOR CYCLE PARKING) AND CAR PARKING (INC WITHIN GROUND LEVEL PODIUMS), ASSOCIATED HIGHWAYS AND UTILITIES WORKS. CHANGES RELATE TO AMENDMENTS TO PHASE 2B SO THAT IT COMPLIES WITH RECENTLY INTRODUCED FIRE SAFETY REGULATIONS INCLUDING, AMONG OTHER THINGS, A REQUIREMENT FOR TWO STAIRCASES PER CORE AND UPDATED BUILDING REGULATIONS PART L AND PART O RELATING TO ENERGY EFFICIENCY AND OVERHEATING. PHASE 2A RELATING TO THE DEMOLITION OF THE EXISTING BUILDINGS REMAINS UNCHANGED.
Awaiting decision Conditions Demolition 8 docs -
HIGH PATH DEVELOPMENT PROJECTS High Path, Wimbledon, Merton
98% historically approved · decision due ~21 Jan
APPLICATION FOR (PHASE 2) DISCHARGE OF CONDITION 5 ((THAMES WATER MAIN WITHIN ABBEY ROAD) - RESERVED MATTERS CONDITION) ATTACHED TO LBM PLANNING PERMISSION 25/P1184 and 19/P1852 APPLICATION FOR (PHASE 2) VARIATION OF CONDITION 2 (APPROVED PLANS), ATTACHED TO LBM PLANNING APPLICATION 19/P1852 RELATING TO THE APPLICATION FOR APPROVAL OF RESERVED MATTERS (PHASE 2) FOLLOWING OUTLINE PERMISSION 17/P1721 FOR THE COMPREHENSIVE PHASED REGENERATION OF HIGH PATH ESTATE COMPRISING DEMOLITION OF ALL EXISTING BUILDINGS AND STRUCTURES; ERECTION OF NEW BUILDINGS RANGING FROM 1 TO 10 STOREYS MAX, PROVIDING UP TO 1570 RESIDENTIAL UNITS (C3 USE CLASS); PROVISION OF UP TO 9,900 SQM OF COMMERCIAL AND COMMUNITY FLOORSPACE (INC REPLACEMENT AND NEW FLOORSPACE, COMPRISING: UP TO 2,700 SQM OF USE CLASS A1 AND/OR A2, AND/OR A3 AND/OR A4 FLOORSPACE, UP TO 4,100 SQM OF USE CLASS B1 (OFFICE) FLOORSPACE, UP TO 1,250 SQM OF FLEXIBLE WORK UNITS (USE CLASS B1), UP TO 1,250 SQM OF USE CLASS D1 (COMMUNITY) FLOORSPACE; UP TO 600 SQM OF USE CLASS D2 (GYM) FLOORSPACE); PROVISION OF NEW NEIGHBOURHOOD PARK AND OTHER COMMUNAL AMENITY SPACES, INCL. CHILDREN'S PLAY SPACE; PUBLIC REALM, LANDSCAPING, LIGHTING; CYCLE PARKING (INCL VISITOR CYCLE PARKING) AND CAR PARKING (INC WITHIN GROUND LEVEL PODIUMS), ASSOCIATED HIGHWAYS AND UTILITIES WORKS. CHANGES RELATE TO AMENDMENTS TO PHASE 2B SO THAT IT COMPLIES WITH RECENTLY INTRODUCED FIRE SAFETY REGULATIONS INCLUDING, AMONG OTHER THINGS, A REQUIREMENT FOR TWO STAIRCASES PER CORE AND UPDATED BUILDING REGULATIONS PART L AND PART O RELATING TO ENERGY EFFICIENCY AND OVERHEATING. PHASE 2A RELATING TO THE DEMOLITION OF THE EXISTING BUILDINGS REMAINS UNCHANGED.
Awaiting decision Conditions Demolition 6 docs
Other reserved matters applications
In Merton
-
25/P2609 Granted
7 Oldfield Road Wimbledon SW19 4SD
APPLICATION TO DISCHARGE CONDITION 3 ATTACHED TO LBM PLANNING PERMISSION 24/P1090, RELATING TO THE ERECTION OF A REAR EXTENSION, FRONT PORCH AND REAR DORMER ROOF EXTENSION