Skip to content
PlanIndex Get alerts
Menu

Planning application

59 Dora Road Wimbledon SW19 7EZ

Awaiting decision Merton 25/P3130 Full Planning Permission

Works: Loft or dormer Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

DEMOLITION OF EXISTING DETACHED DORMER BUNGALOW AND ERECTION OF A PAIR OF SEMI-DETACHED HOUSES WITH ACCOMMODATION AT PART LOWER GROUND, GROUND, FIRST AND ATTIC FLOORS WITH ASSOCIATED SITE WORKS.

As published by the council, reference 25/P3130

Application record

Reference
25/P3130
Type
Full Planning Permission
Status
REGISTERED
Received
27 Oct 2025
Validated
15 Jan 2026
Ward
Wimbledon Park
Postcode
SW19 7EZ

Timeline

Dates from the published record

  1. 27 Oct 2025

    Received by Merton

  2. 15 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 12 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Merton took a median of 47 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

37 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Merton for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 59 Dora Road Wimbledon SW19 7EZ

    25/P3130/INVALID Submitted 27 Oct 2025 0m away

    93% historically approved · decision due ~12 Mar

    DEMOLITION OF EXISTING DETACHED DORMER BUNGALOW AND ERECTION OF A PAIR OF SEMI-DETACHED HOUSES WITH ACCOMMODATION AT PART LOWER GROUND, GROUND, FIRST AND ATTIC FLOORS WITH ASSOCIATED SITE WORKS.

    Awaiting decision Full applications Loft or dormer Demolition 37 docs
  • 61A Dora Road Wimbledon SW197EZ

    25/P3005 Submitted 13 Oct 2025 19m away

    92% historically approved · decision due ~4 Feb

    APPLICATION FOR A LAWFUL DEVELOPMENT CERTIFICATE IN RESPECT OF THE PROPOSED INSTALLATION OF AN AIR COOLING AND HEATING AIR SOURCE COMPRESSOR UNIT AT SIDE OF PROPERTY

    Awaiting decision Outline 6 docs
  • 61A Dora Road Wimbledon SW197EZ

    25/P3005/INVALID Submitted 13 Oct 2025 19m away

    92% historically approved · decision due ~4 Feb

    APPLICATION FOR A LAWFUL DEVELOPMENT CERTIFICATE IN RESPECT OF THE PROPOSED INSTALLATION OF AN AIR COOLING AND HEATING AIR SOURCE COMPRESSOR UNIT AT SIDE OF PROPERTY

    Awaiting decision Outline 6 docs
  • 82 Dora Road Wimbledon SW19 7HH

    25/P3785 Submitted 17 Dec 2025 59m away

    93% historically approved · decision due ~6 Mar

    APPLICATION FOR THE RECONFIGURATION OF THE EXISTING DWELLING AT LOWER GROUND LEVEL AND REPLACEMENT OF THE EXISTING REAR COMSERVATORY EXTENSION

    Awaiting decision Full applications Extension 10 docs
    Domestic
  • 18 Vineyard Hill Road, Wimbledon, Merton, SW19 7JH

    26/SEC73/0953 Submitted 15 May 2026 67m away

    91% historically approved · decision due ~10 Jul

    APPLICATION FOR VARIATION OF CONDITION 2 (APPROVED PLANS), ATTACHED TO LBM PLANNING APPLICATION 16/P0112 RELATING TO THE 25/P0425 CHANGES RELATE TO CONVERSION OF FLATS INTO SINGLE DWELLINGHOUSE INCORPORATING PART SINGLE STOREY REAR AND PART TWO STOREY REAR SIDE EXTENSIONS, EXTENSION OF EXISTING BASEMENT, NEW FRONT PORCH CANOPY, REPLACEMENT FRONT AND REAR DORMERS AND INTERNAL ALTERATIONS.

    Status unknown Amendments New dwelling Extension +1
    Small domestic
  • 19 Vineyard Hill Road Wimbledon SW19 7JL

    25/T2492 Submitted 22 Aug 2025 105m away

    REAR GARDEN - FAR RIGHT-HAND CORNER: PLUM TREE - SHAPE AND REDUCE THE CROWN BY 20% AND LIFT THE LOWER CANOPY.

    Granted Trees 3 docs

In Merton

  • 26/FULL/1160 Status unknown

    Unit 109, RAINBOW INDUSTRIAL PARK, 2 Station Approach, Raynes Park, Merton, SW20 0FT

    ELEVATION CHANGES TO EXISTING WAREHOUSE UNIT.

    5 Jun 2026 Full applications
  • 26/FULL/1150 Status unknown

    29D Parkside, Wimbledon, Merton, SW19 5NB

    APPLICATION FOR THE REMOVAL OF AN EXISTING FIRE ESCAPE AND THE INSTALLATION OF A NEW SECOND FLOOR BALCONY WITH FIRE ESCAPE LADDER

    5 Jun 2026 Full applications
  • 26/FULL/1151 Status unknown

    Hewitts, 1A Denmark Road, Wimbledon, Merton, SW19 4PG

    DEMOLITION OF EXISTING GARAGES AND CONSTRUCTION OF A NEW BUILD 3-STOREY DWELLING HOUSE CONSISTING OF 2 BEDROOMS INCLUDING A BASEMENT

    4 Jun 2026 Full applications
  • 26/FULL/1144 Status unknown

    Has Kebab, 341 Haydons Road, Wimbledon, Merton, SW19 8LA

    SUBDIVISION OF GROUND FLOOR CLASS E COMMERCIAL UNIT INTO TWO UNITS; CONSTRUCTION OF UPWARDS EXTENSIONS TO CREATE LARGER SELF-CONTAINED DWELLING; REAR ROOF TERRACE AND ALL ASSOCIATED WORKS.

    3 Jun 2026 Full applications
  • 26/FULL/1123 Status unknown

    Nationwide, 32 - 34 Wimbledon Hill Road, Wimbledon, Merton, SW19 7PA

    INSTALLATION OF DEFIBRILLATOR AND BLEED KIT CABINETS TO EXTERNAL WALL OF NATIONWIDE BUILDING SOCIETY BRANCH

    2 Jun 2026 Full applications