Planning application
Greensmith Cottage 8 City Road Stathern Leicestershire LE14 4HE
Relates to 25/00989/FUL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Submission of details required by Condition 3 (materials) of planning permission 25/00989/FUL
As published by the council, reference 26/00852/DIS
Application record
- Reference
- 26/00852/DIS
- Status
- Unknown
- Received
- 21 Sep 2026
- Validated
- 21 Sep 2026
- Postcode
- LE14 4HE
Site history
Applications at this address on the Melton register
This site has had 5 applications since 2023: 4 approved, 0 refused.
-
26/00083/LBC Granted
Greensmith Cottage 8 City Road Stathern Leicestershire LE14 4HE
Replace porch area and ensure is weather tight and structurally sound. To update materials used to increase insulation and longevity of the structure.
-
25/00989/FUL Granted
Greensmith Cottage 8 City Road Stathern Leicestershire LE14 4HE
erection of a single storey garage
-
24/00361/LBC Granted
Greensmith Cottage 8 City Road Stathern Leicestershire LE14 4HE
Proposed New Wall
-
23/00345/TCA Granted
Greensmith Cottage 8 City Road Stathern Leicestershire LE14 4HE
Single Evergreen Tree - Removal due to resting on the boundary wall which requires repair work and growing into electrical cables from the main property, and may create a safety issue.
Timeline
Dates from the published record
-
21 Sep 2026
Received by Melton
-
7 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Melton took a median of 92 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/00989/FUL Granted
Greensmith Cottage 8 City Road Stathern Leicestershire LE14 4HE
erection of a single storey garage
What happens while it is decided
This application is with Melton for determination, against a statutory target of eight weeks. Over the last year Melton's median decision took 92 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Melton's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
7 City Road Stathern Melton Mowbray LE14 4HE
93% historically approved · decision due ~17 Nov
Use of dwelling as holiday let
Awaiting decisionDomestic -
Greensmith Cottage 8 City Road Stathern Leicestershire LE14 4HE
erection of a single storey garage
Granted Full applications 13 docsSmall domestic -
Land Adjacent To 8 City Road Stathern
93% historically approved · decision due ~23 Dec
Variation of Condition 2 (Approved Documents) of Planning Permission 24/00349/FUL in relation to amendments to Plot 2 including raised ridge height
Status unknown Amendments Roofing 5 docs -
Greensmith Cottage 8 City Road Stathern Leicestershire LE14 4HE
Single Evergreen Tree - Removal due to resting on the boundary wall which requires repair work and growing into electrical cables from the main property, and may create a safety issue.
Granted Trees 6 docsSmall domestic -
Greensmith Cottage 8 City Road Stathern Leicestershire LE14 4HE
Replace porch area and ensure is weather tight and structurally sound. To update materials used to increase insulation and longevity of the structure.
Granted Heritage and listed buildings Extension 10 docsSmall domestic -
Greensmith Cottage 8 City Road Stathern Leicestershire LE14 4HE
Proposed New Wall
Granted Heritage and listed buildings 10 docs