Planning application

Land West Of Main Street Stathern

Granted Melton 19/01302/FUL Full Application

Works: Demolition Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Detailed planning application for the demolition of agricultural buildings and the erection of 74 dwellings, together with access into the site from Main Street, and open space, landscaping and drainage infrastructure.

As published by the council, reference 19/01302/FUL

Application record

Reference
19/01302/FUL
Type
Full Application
Status
Permitted
Decision
Permit with Section 106
Received
25 Nov 2019
Validated
25 Nov 2019
Decided
23 Apr 2021
Ward
Long Clawson And Stathern
Parish
Stathern
Decision by
Committee Decision

Timeline

Dates from the published record

  1. 25 Nov 2019

    Received by Melton

  2. 23 Apr 2021

    Decision issued: Permit with Section 106

  3. 17 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Cirencester

567 applications on PlanIndex · across 135 councils · 91% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

130 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land West Of Main Street Stathern

    24/00011/VAC Submitted 27 Dec 2023 15m away

    Removal of condition 1 (commencement of development) and variation of conditions 2, 3, 4, 5, 6, 7, 10, 14, 15, 16, 17, 21 of Planning Permission 22/00581/VAC to incorporate the following amendments Updated layout Revised house types and house mix Amendment to parking provision Addition of electric vehicle charging Increase in trees and hedges provision Small changes to the drainage design detail

    Granted Amendments Trees 153 docs
  • Land West Of Main Street Stathern

    26/00314/VAC Submitted 10 Apr 2026 48m away

    92% historically approved · decision due ~5 Jun

    Variation of condition 12 of planning permission 24/00011/VAC to allow the approved scheme for traffic calming in Mill Hill to the south of the access to the site to be implemented in accordance with the submitted details prior to the occupation of the 50th house on the site.

    Status unknown Amendments 7 docs
  • The Badminton 2 Farriers Way Stathern Leicestershire LE14 4HZ

    26/00242/TCA Submitted 21 Mar 2026 94m away

    Trim willow tree in the garden at 2 Farriers Way Stathern.

    Granted Trees 10 docs
  • Shire House 3 Farriers Way Stathern Leicestershire LE14 4HZ

    22/01315/FULHH Submitted 14 Dec 2022 129m away

    Proposed New dormers to front side and rear and enlarge 2 existing dormers and insert 2 new rooflights.

    Granted Householder Loft or dormer 12 docs
    Domestic
  • 1A Chapel Lane Stathern Melton Mowbray LE14 4HA

    24/00432/FULHH Submitted 23 Apr 2024 142m away

    Timber framed detached double garage

    Granted Householder 10 docs
    Domestic
  • Land South Of Chantry House Chapel Lane Stathern

    21/00477/FUL Submitted 26 Apr 2021 144m away

    Erection of one four bedroom detached dwelling

    Granted Full applications New dwelling 15 docs
    Domestic

In Melton

  • 26/00785/FUL Awaiting decision

    1 Chapel Lane Ab Kettleby Leicestershire LE14 3HS

    Conversion of Dwelling into Tearoom, Postal Facilities and 2no. apartments at first floor level.

    1 Sep 2026 Full applications
  • 26/00765/FUL Awaiting decision

    The Lawn Farm Gibsons Lane Old Dalby Leicestershire LE14 3LH

    Demolition of existing agricultural building and erection of 1 new residential dwelling with associated access, car parking and amenity space.

    27 Aug 2026 Full applications
  • 26/00218/FUL Refused

    Croxton Lodge Farm Knipton Road Branston Leicestershire NG32 1RT

    THE CHANGE OF USE OF AN EXISTING DWELLING (USE CLASS C3) TO A CHILDREN'S THERAPEUTIC RESIDENTIAL CARE HOME (USE CLASS C2) FOR A MAXIMUM OF 4 NO. CHILDREN (WITH ASSOCIATED ACCOMMODATION FOR CARERS)

    16 Mar 2026 Full applications
  • 25/00775/FUL Refused

    Cranyke Farm Eastwell Road Scalford Leicestershire LE14 4SS

    Proposed extension to existing carport to form one self-build dwelling and associated works

    22 Jul 2025 Full applications
  • 26/00383/FUL Refused

    35 Scalford Road Melton Mowbray LE13 1JY

    2 Additional car parking spaces (retrospective)

    24 Apr 2026 Full applications