Planning application
Land East Of Mansfield Road Market Warsop Nottinghamshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
ERECTION OF 350 NO. DWELLINGS AND GREEN, HIGHWAYS AND DRAINAGE INFRASTRUCTURE, ERECTION OF ROADSIDE SERVICES INCLUDING A PETROL FILLING STATION (SUI GENERIS) AND DRIVE-THRU COFFEE SHOP (CLASS E) WITH THE PROVISION OF ELECTRIC VEHICLE CHARGE POINTS. ERECTION OF (CLASS E(a)) FOODSTORE WITH THE PROVISION OF ELECTRIC VEHICLE CHARGE POINTS, REGRADING OF LEVELS (INCLUDING RETAINING WALLS), HARD AND SOFT LANDSCAPING, CLICK AND COLLECT FACILITY, SERVICE AREA (INCLUDING DELIVERY VAN PARKING) AND ASSOCIATED WORKS
As published by the council, reference 2026/0153/FUL
Application record
- Reference
- 2026/0153/FUL
- Type
- Full Application
- Status
- Registered
- Received
- 13 Mar 2026
- Validated
- 31 Mar 2026
- Ward
- Market Warsop
- Parish
- Warsop Parish Council
Timeline
Dates from the published record
-
13 Mar 2026
Received by Mansfield
-
31 Mar 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Mansfield took a median of 85 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
161 documents on file for this application
- Supplementary ecological information
- Habitats regulations assessment
- Mdc environmental health
- Emcca comments
- Notts police
- Response to comments from urban designer
- Potential master plan updates
- Maximising security through design
- Rapid health impact assessment
- Email from agent
- Highways note on refuse collection
- Dust assessment
- Proposed access arrangement with gladman development junctions
- Odour assessment
- Ncc highway comments
- Highways note
- Designers response to stage 1 road safety layout
- Campaign to protect rural england
- Tree officer comments
- Ncc flood team
- Environment agency
- Ncc highways
- Environmental health comments
- Design review comments
- Ncc policy comments
- Updated phase 2 geotechnical and geo-environmental site investigation
- Network rail standard informatives
- Network rail drainage requirements
- Network rail comments
- Historic england comments
- Notts wildlife comments
- Active travel england comments
- Environment agency comments
- Clerk to warsop parish council
- Ncc rights of way comments
- Ncc highways comments
- Waste and recycling comments
- Notts police comments
- Env health comments
- Natural england comments
- Historic england comments
- Ncc policy screening response
- Mdc parks comments
- Mdc parks - fields in trust standards
- Retail policy statement addendum (quantitative retail impact)
- Flood risk management comments
- Natural england response
- Ncc planning policy
- Mdc conservation
- Env health screening comments
- Env agency screening comment
- Conservation comments
- Air quality assessment
- Secured by design statement
- Bng condition assessment post development
- Bng uk habitats post development
- Arboricultural impact assessment (aia)
- Tree survey bs5837 report
- Aia -appendix 2 - tree constraint plan
- Aia - appendix 3 tree impact plan
- Bng metric
- Application form - without personal data
- Location plan
- Design and access statement
- Design and access statement
- Energy and sustainability statement
- Drainage strategy and statement
- Drainage strategy sheet 1
- Drainage strategy sheet 2
- Drainage strategy sheet 3
- Drainage strategy sheet 4
- Historic environment desk-based assessment
- Phase 1 geotechnical and geo-environmental site investigation and coal mining ri
- Phase 1 geotechnical and geo-environmental site investigation and coal mining ri
- Phase 1 geotechnical and geo-environmental site investigation and coal mining ri
- Phase 1 geotechnical and geo-environmental site investigation and coal mining ri
- Phase 1 geotechnical and geo-environmental site investigation and coal mining ri
- Phase 1 geotechnical and geo-environmental site investigation and coal mining ri
- Phase 2 geotechnical and geo-environmental site investigation
- Topographical survey
- Transport assessment
- Travel plan
- Statement of community involvement
- Affordable housing statement
- Ecological impact assessment
- Biodiversity metric calculation tool
- Landscape and visual impact assessment
- Health impact assessment
- Via - existing situation
- Visual impact assessment
- Mitigation measures
- Detailed landscape proposals
- Detailed landscape proposals
- Detailed landscape proposals
- Detailed landscape proposals
- Detailed landscape proposals
- Type 254 - 2 bed (detached) rural
- Type 254 - 2 bed (detached) urban
- Type 257 (2 bed semi) rural
- Type 257 (2 bed semi) urban
- Type 259 2 bed semi detached rural
- Type 259 2 bed semi detached urban
- Type 264 2 bed semi detached planning rural
- Type 264 2 bed semi detached planning urban
- Type 365 (3 bed semi) rural
- Type 365 (3 bed semi) urban
- Type 366 3 bed semi detached rural
- Type 366 3 bed semi detached urban
- Type 368 (3 bed semi) rural
- Type 368s (3 bed semi) urban
- Type 367 (3 bed detached) rural
- Type 367 (3 bed detached) urban
- Type 380 3 bed semi/detached rural
- Type 380 3 bed semi/detached urban
- Type 385 3 bed detached rural
- Type 385 3 bed detached urban
- Type 410 4 bed detached rural
- Type 410 4 bed detached urban
- Type 414 nm 4 bed detached rural
- Type 414 nm 4 bed detached urban
- Ht 415 (4 bed/8 person) urban planning drawing
- Ht 415 (4 bed/8 person) rural planning drawing
- Noise impact assessment
- Planning statement
- Flood risk assessment
- Proposed drainage layout
- Measures to facilitate future adaptability and disassembly strategy plan
- Sustainability statement
- Lias design notes and luminaire schedule and proposed lighting layout
- Retail policy statement
- Landscape masterplan
- Existing site sections sheet 01
- Existing site sections sheet 02
- Proposed site sections sheet 01
- Proposed site sections sheet 02
- Proposed click and collect details
- Proposed substation and transformer details
- Proposed pfs kiosk canopy detail
- Proposed drive thru roof plan
- Proposed foodstore building sections
- Proposed pfs kiosk ground floor plan
- Proposed pfs kiosk roof plan
- Proposed pfs kiosk building sections and elevations
- Proposed drive thru ground floor plan
- Proposed drive thru building sections and elevations
- Proposed site plan
- Proposed external finishes plan
- Proposed boundary treatment plan
- Proposed external furniture plan
- Proposed atm details
- Proposed foodstore ground floor plan
- Proposed foodstore roof plan
- Proposed foodstore building elevations
- Masterplan
- Planning layout sh1
- Planning layout sh2
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Mansfield for determination, against a statutory target of eight weeks. Over the last year Mansfield decided full applications in a median of 197 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
132A Mansfield Road Warsop Nottinghamshire NG20 0EA
REAR AND SIDE EXTENSIONS TO EXISTING BUNGALOW - RESUBMISSION OF 2023/0008/HHA (REAR AND SIDE EXTENSIONS TO EXISTING BUNGALOW)
Granted Householder Extension 9 docsDomestic -
132A Mansfield Road Warsop Nottinghamshire NG20 0EA
REAR AND SIDE EXTENSIONS TO EXISTING BUNGALOW
Granted Householder Extension 7 docsDomestic -
Trade Timber Supplies Oakfield Lane Warsop Nottinghamshire NG20 0JG
93% historically approved · decision due ~11 Sep
PROPOSED REDEVELOPMENT OF EXISTING HORTICULTURAL SALES AND TIMBER SUPPLIES BUSINESS (EMPLOYMENT ALLOCATION E2B) TO PROVIDE TWO SEPARATE OPERATING PREMISES INCLUDING TIMBER RACKING, STORAGE AND ANCILLARY FUNCTIONS (OFFICES/SALES) ON LAND TO THE SOUTH (INCLUDING NEW ACCESS, PARKING AND LANDSCAPING) (USE CLASS B2/B8) AND NEW GARDEN CENTRE INCLUDING OUTDOOR PLANT DISPLAY, COMMUNITY CLASSROOM/CAFE, ACTIVITY AREA, SALES BUILDING AND STORAGE (USE CLASS SUI GENERIS) (INCLUDING RETAINED ACCESS, PARKING AND ANCILLARY STORAGE).
Awaiting decision Full applications 32 docs -
Land West Of Mansfield Road Market Warsop Nottinghamshire
SCOPING OPINION REQUEST FOR ENVIRONMENTAL IMPACT ASSESSMENT FOR OUTLINE APPLICATION FOR THE ERECTION OF UP TO 350 DWELLINGS (INCLUDING AFFORDABLE HOUSING) WITH PUBLIC OPEN SPACE, LANDSCAPING, SUSTAINABLE DRAINAGE SYSTEM (SuDS) AND VEHICULAR ACCESS POINTS. ALL MATTERS RESERVED EXCEPT MEANS OF ACCESS.
Decided Outline 20 docsMajor scheme -
21 Oakfield Avenue Warsop Mansfield Nottinghamshire NG20 0LQ
TWO STOREY SIDE EXTENSION
Granted Householder Extension 10 docsDomestic -
57 Hammerwater Drive Warsop Nottinghamshire NG20 0DL
SINGLE STOREY SIDE EXTENSION
Granted Householder Extension 5 docsSmall domestic
Other full applications
In Mansfield
-
2026/0384/FUL Decided
Unit 3 Shire Avenue Mansfield Notts NG18 4GR
INSTALLATION OF AN ATM
-
2025/0536/FUL Granted
Footpath Outside Four Seasons Shopping Centre 19 Stockwell Gate Mansfield Nottinghamshire NG18 1SU
INSTALLATION OF 1 NO. BT STREET HUB UNIT AND ASSOCIATED ADVERTISEMENT PANELS ON EITHER SIDE OF THE UNIT.
-
2026/0325/FUL Decided
Bleak Hills Lane Fishery Bleak Hills Lane Mansfield Nottinghamshire NG18 5BS
SELF BUILD RESIDENTIAL DWELLING
-
2026/0486/FUL Awaiting decision
Telecomms Site To The East Of Grove Way Mansfield Woodhouse Notts NG19 8BW
CONSTRUCTION AND OPERATION OF A MICRO ENERGY STORAGE PROJECT.
-
2026/0469/FUL Awaiting decision
Land To The Rear Of 88 Southwell Road East Rainworth Nottinghamshire NG21 0EW
1 NO. 2-BEDROOM RESIDENTIAL BUNGALOW