Planning application
The Gallery Restaurant North Manchester General Hospital Delaunays Road Manchester M8 5RB
Works: Roofing Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Removal of reinforced autoclaved aerated concrete (RAAC) and roof; replacement of exterior glazing and doors; refurbishment of internal seating area including new floor, wall and ceiling finishes and refurbishment of adjacent WC including new sanitaryware; replacement and reinstatement of mechanical and electrical installations including lighting, emergency lighting and fire alarm systems; replacement of kitchen servery fire suppression system; and installation of upgraded ventilation systems.
As published by the council, reference PLA-2026-001889
Application record
- Reference
- PLA-2026-001889
- Type
- Lawful development: Proposed
- Status
- Under Consideration
- Received
- 14 Oct 2026
- Validated
- 14 Oct 2026
- Ward
- Crumpsall
- Postcode
- M8 5RB
Timeline
Dates from the published record
-
14 Oct 2026
Received by Manchester
-
21 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Manchester took a median of 55 days over the applications it decided in the last year.
Documents
27 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What happens while it is decided
This application is with Manchester for determination, against a statutory target of eight weeks. Over the last year Manchester decided lawful development applications in a median of 56 days. More in our guide to how long planning decisions take.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
North Manchester General Hospital Delaunays Road Manchester M8 5RB
Discharge of conditions 4 (Construction Management Plan) and 10 (Landscaping and Tree Replacement Strategy) associated with planning permission 128605/FO/2020
Granted Conditions Trees 8 docs -
North Manchester General Hospital Delaunays Road Manchester M8 5RB
Installation of 1 x 10.2 metre high and 1 x 5.7 metre high cylinder oxygen vessels together with three ambient vaporiser tanks with associated boundary treatment, amendments to road layout and other associated works together with the creation of compound and bin storage area with the associated equipment and associated boundary treatment
Granted Full applications 20 docs -
North Manchester General Hospital Delaunays Road Manchester M8 5RB
Erection of a retaining wall and a decorative louvered veil system to conceal the existing external equipment
Granted Full applications 13 docs -
North Manchester General Hospital Delaunays Road Manchester M8 5RB
Erection of two-storey Energy Centre to contain CHP and Boilers involving demolition of existing raised surface together with reconfiguration of car parking, open space and access from Central Drive
Granted Full applications Demolition 19 docs -
North Manchester General Hospital Delaunays Road Manchester M8 5RB
Discharge of conditions 4a (ground conditions), 5 (drainage) and 7 (CMP) attached to planning permission referenced 121569/FO2018
Split decision Conditions 14 docs -
North Manchester General Hospital Delaunays Road Manchester M8 5RB
Discharge of planning condition 4 (gas membrane) associated with planning permission 117887/FO/2017
Granted Conditions 9 docs
Other lawful development applications
In Manchester
-
PLA-2026-002285 Awaiting decision
47 Meldon Road Manchester M13 0TS
The construction of a dormer within the roof.
-
PLA-2026-001684 Refused
9 Tartan Street Manchester M11 4GD
Erection of an outhouse to the rear of the property for use as a gym and store.
-
PLA-2026-002176 Awaiting decision
36 Walker Road Manchester M9 6RF
Construction of a new loft conversion incorporating a rear-facing dormer and new rooflights to the front roof slope.
-
PLA-2026-001459 Granted
Basement 35 Whitworth Street West Manchester M1 5NG
Proposed use of the basement as an Indoor Bouldering Centre (Use Class E(d)).
-
PLA-2026-002169 Awaiting decision
32 Clothorn Road Manchester M20 6BP
Loft conversion incorporating a rear-facing dormer.