Skip to content
PlanIndex Get alerts
Menu

Planning application

Land to the south of Bower Street M40 2AF

Awaiting decision Manchester PLA-2026-001350 Full planning permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a new data centre comprising two commercial units (Sui Generis) with associated external plant, substations, boundary fencing, landscaping, highway access works and all ancillary infrastructure.

As published by the council, reference PLA-2026-001350

Application record

Reference
PLA-2026-001350
Type
Full planning permission
Status
Under Consultation
Received
14 Aug 2026
Validated
14 Aug 2026
Ward
Miles Platting & Newton Heath
Decision by
Delegated Decision
Postcode
M40 2AF

Comment by 10 September 2026

The council is taking comments on this application until then. Comments go to Manchester through their own planning portal.

Timeline

Dates from the published record

  1. 14 Aug 2026

    Received by Manchester

  2. 24 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 9 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Manchester took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

76 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Manchester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land to the south of Bower Street M40 2AF

    OTH-2026-001360 Submitted 17 Aug 2026 0m away

    88% historically approved · decision due ~12 Oct

    Erection of a new data centre comprising two commercial units (Sui Generis) with associated external plant, substations, boundary fencing, landscaping, highway access works and all ancillary infrastructure.

    Awaiting decision Outline 1 doc
  • 2 Partington Street Manchester M40 2AQ

    CDN/19/0665 Submitted 14 Aug 2019 110m away

    Discharge of condition 2 (external materials) and 4 (boundary treatment) attached to planning permission 114981/FO/2017

    Granted Conditions 8 docs
  • 59 Douro Street Manchester M40 2AU

    PLA-2026-001079 Submitted 3 Aug 2026 111m away

    95% historically approved · decision due ~28 Sep

    Installation of an electric vehicle chargepoint to the front elevation of the dwelling.

    Awaiting decision Householder 6 docs
    Domestic
  • Land Adjacent To 57 Grimshaw Lane Manchester M40 2AX

    144020/FO/2025 Submitted 22 Sep 2025 150m away

    Erection of two storey dwellinghouse (Class C3) with associated landscaping and boundary treatment

    Granted Full applications 16 docs
    Domestic
  • 57 Grimshaw Lane Manchester M40 2AX

    140785/FO/2024 Submitted 4 Oct 2024 153m away

    Erection of a three storey end terrace building to form 6no. 1 bedroom studio flats to form short term holiday let accommodation.

    Refused Full applications New dwelling 30 docs
  • 65 Grimshaw Lane Manchester M40 2AX

    127237/FO/2020 Submitted 8 Dec 2020 158m away

    Change of use of former public house (Class A4) to form 5 x self contained apartments (Class C3)

    Withdrawn Full applications New dwelling 12 docs

In Manchester

  • PLA-2026-001359 Awaiting decision

    Ground floor of 62-64 Reddish Lane Manchester M18 7JL

    Change of Use of the ground floor of 62-64 Reddish Lane from Class E (estate agents) to a tuition and education centre Class F1(a) including bin store and cycle store.

    2 Sep 2026 Full applications
  • PLA-2026-001326 Awaiting decision

    10 Fairfield Road Manchester M11 1EW

    Change of Use from vacant place of worship/hall (F1/F2 use), to a restaurant lounge and bar (Class E/Sui Generis), together with external alterations and installation of external plant equipment.

    2 Sep 2026 Full applications
  • PLA-2026-000525 Refused

    80 Mauldeth Road West Manchester M20 1AB

    Change of Use from shop to residential ground floor flat and associated works.

    26 Jun 2026 Full applications
  • PLA-2026-000808 Granted

    46 Withenfield Road Manchester M23 9BS

    Erection of single-storey detached dwellinghouse with associated car parking landscaping and boundary treatments.

    28 Jul 2026 Full applications
  • 144470/FO/2025 Awaiting decision

    20 Mayfield Road Manchester M16 8FT

    Erection of a single-storey rear extension to form additional accommodation, and elevational alterations to side extension.

    1 Sep 2026 Full applications