Skip to content
PlanIndex Get alerts
Menu

Planning application

PICCADILLY GARDENS PICCADILLY MANCHESTER M1 1LS

Awaiting decision Manchester PLA-2026-001348 Full planning permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

City Council Development - Redevelopment and reconfiguration of Piccadilly Gardens comprising works to the public realm including public open space and use of space for events, together with decommissioning and removal of the existing fountain; creation of play space, lawn area, hard and soft landscaping; lighting; and drainage and other associated infrastructure; and a severable plot for a future ancillary structure with associated interim landscaping.

As published by the council, reference PLA-2026-001348

Application record

Reference
PLA-2026-001348
Type
Full planning permission
Status
Under Consultation
Received
13 Aug 2026
Validated
13 Aug 2026
Ward
Piccadilly
Decision by
Delegated Decision
Postcode
M1 1LS

Timeline

Dates from the published record

  1. 13 Aug 2026

    Received by Manchester

  2. 24 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Manchester took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

46 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Manchester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • PICCADILLY GARDENS MANCHESTER M1 1LS

    OTH-2026-001123 Submitted 22 Jul 2026 0m away

    Request for Screening opinion under Part 2, Regulation 6 of The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended)

    Decided Outline 1 doc
  • 17 Piccadilly Manchester M1 1LS

    129747/LO/2021 Submitted 17 Jun 2021 3m away

    LISTED BUILDING CONSENT for the installation of adverts

    Granted Heritage and listed buildings 24 docs
  • 17 Piccadilly Manchester M1 1LS

    129744/LO/2021 Submitted 18 May 2021 5m away

    LISTED BUILDING CONSENT Installation of plant to rear and internal listed building fit out for restaurant.

    Granted Heritage and listed buildings 50 docs
  • 17 Piccadilly Manchester M1 1LS

    129746/AO/2021 Submitted 17 Jun 2021 5m away

    The installation of a signage scheme.

    Granted Advertising 24 docs
  • 17 Piccadilly Manchester M1 1LS

    135593/AO/2022 Submitted 13 Mar 2023 5m away

    Installation of two x non illuminated banner signs

    Granted Advertising 10 docs
  • 17 Piccadilly Manchester M1 1LS

    129743/FO/2021 Submitted 18 May 2021 9m away

    Installation of plant to rear.

    Granted Full applications 50 docs

In Manchester

  • PLA-2026-001359 Awaiting decision

    Ground floor of 62-64 Reddish Lane Manchester M18 7JL

    Change of Use of the ground floor of 62-64 Reddish Lane from Class E (estate agents) to a tuition and education centre Class F1(a) including bin store and cycle store.

    2 Sep 2026 Full applications
  • PLA-2026-001326 Awaiting decision

    10 Fairfield Road Manchester M11 1EW

    Change of Use from vacant place of worship/hall (F1/F2 use), to a restaurant lounge and bar (Class E/Sui Generis), together with external alterations and installation of external plant equipment.

    2 Sep 2026 Full applications
  • PLA-2026-000525 Refused

    80 Mauldeth Road West Manchester M20 1AB

    Change of Use from shop to residential ground floor flat and associated works.

    26 Jun 2026 Full applications
  • PLA-2026-000808 Granted

    46 Withenfield Road Manchester M23 9BS

    Erection of single-storey detached dwellinghouse with associated car parking landscaping and boundary treatments.

    28 Jul 2026 Full applications
  • 144470/FO/2025 Awaiting decision

    20 Mayfield Road Manchester M16 8FT

    Erection of a single-storey rear extension to form additional accommodation, and elevational alterations to side extension.

    1 Sep 2026 Full applications