Skip to content
PlanIndex Get alerts
Menu

Planning application

10 Weardale Road Manchester M9 8WR

Granted Manchester PLA-2026-000725 Full planning permission

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of external front step lift following demolition of existing porch and steps with associated boundary treatment

As published by the council, reference PLA-2026-000725

Application record

Reference
PLA-2026-000725
Type
Full planning permission
Status
Recommendation Made
Decision
Permitted
Received
24 Jul 2026
Validated
24 Jul 2026
Ward
Higher Blackley
Decision by
Delegated Decision
Postcode
M9 8WR

Timeline

Dates from the published record

  1. 24 Jul 2026

    Received by Manchester

  2. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Site Of Former Day Nursery Longhurst Road Manchester M9 8NS

    OTH-2026-001029 Submitted 15 Jul 2026 83m away

    90% historically approved · decision due ~9 Sep

    Discharge of Condition 3b (materials) attached to Planning Permission 145420/JO/2026.

    Awaiting decision Conditions 5 docs
  • Grass Verge To Footway In Front Of Petrol Filling Station Victoria Avenue Manchester

    127366/TEL/2020 Submitted 6 Jul 2020 113m away

    Prior Approval for the installation of a 20 metre high telecommunication monopole with wrap around cabin built round the base and 3no ground based equipment cabinets and ancillary development

    Granted Telecoms Extension 11 docs
  • 160A Crab Lane Manchester M9 8WD

    120288/TCA/2018 Submitted 11 Jun 2018 115m away

    Works to tree - proposed removal of a tree from front garden

    Granted Trees 3 docs
  • Site Of Former Day Nursery Longhurst Road Manchester M9 8NS

    CDN/25/1117 Submitted 24 Nov 2025 125m away

    Discharge of Conditions 7 (cycle store), 8a (travel plan), 9a (EVC) and 16 (drainage maintenance) attached to Planning Permission referenced 136721/FO/2023.

    Split decision Conditions 24 docs
  • 18 Northdale Road Manchester M9 8WG

    120181/FH/2018 Submitted 14 Jun 2018 125m away

    Reconfiguration of steps to front access

    Granted Householder 6 docs
    Domestic
  • Site Of Former Day Nursery Longhurst Road Manchester M9 8NS

    145420/JO/2026 Submitted 13 Mar 2026 128m away

    Variation of Conditions 2, 7, 9, 12, 21, 22, 30 and 32 attached to Planning Permission 136721/FO/2023 to revise the drawing numbers to allow PV panels to be installed to Blocks 2-9, changes to the levels to the rear gardens of Blocks 3-9 to allow for the removal of the steps, changes in boundary treatments to respond to existing levels and include facing materials to retaining walls on landscaping plans, lowering of Block 2 eaves to be in line with Block 1, removing external air source heat pumps between houses to provide easier access, changing dormer windows, changing materials to corner dormers to Blocks 3 & 9, increasing cill height of first floor front elevation windows to Blocks 3-9 to accommodate timber frame to parapet roofs below, increase in path width to Block 1, reduce size of trees to the front of houses and apartments, reducing sizes of trees to the rear of the retaining wall to reduce impact of roots on retaining wall and removal of boundary walls to the fronts of houses.

    Granted Amendments New dwelling Loft or dormer +2 30 docs

In Manchester

  • PLA-2026-001359 Awaiting decision

    Ground floor of 62-64 Reddish Lane Manchester M18 7JL

    Change of Use of the ground floor of 62-64 Reddish Lane from Class E (estate agents) to a tuition and education centre Class F1(a) including bin store and cycle store.

    2 Sep 2026 Full applications
  • PLA-2026-001326 Awaiting decision

    10 Fairfield Road Manchester M11 1EW

    Change of Use from vacant place of worship/hall (F1/F2 use), to a restaurant lounge and bar (Class E/Sui Generis), together with external alterations and installation of external plant equipment.

    2 Sep 2026 Full applications
  • PLA-2026-000525 Refused

    80 Mauldeth Road West Manchester M20 1AB

    Change of Use from shop to residential ground floor flat and associated works.

    26 Jun 2026 Full applications
  • PLA-2026-000808 Granted

    46 Withenfield Road Manchester M23 9BS

    Erection of single-storey detached dwellinghouse with associated car parking landscaping and boundary treatments.

    28 Jul 2026 Full applications
  • 144470/FO/2025 Awaiting decision

    20 Mayfield Road Manchester M16 8FT

    Erection of a single-storey rear extension to form additional accommodation, and elevational alterations to side extension.

    1 Sep 2026 Full applications