Planning application
10 Weardale Road Manchester M9 8WR
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of external front step lift following demolition of existing porch and steps with associated boundary treatment
As published by the council, reference PLA-2026-000725
Application record
- Reference
- PLA-2026-000725
- Type
- Full planning permission
- Status
- Recommendation Made
- Decision
- Permitted
- Received
- 24 Jul 2026
- Validated
- 24 Jul 2026
- Ward
- Higher Blackley
- Decision by
- Delegated Decision
- Postcode
- M9 8WR
Timeline
Dates from the published record
-
24 Jul 2026
Received by Manchester
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Site Of Former Day Nursery Longhurst Road Manchester M9 8NS
90% historically approved · decision due ~9 Sep
Discharge of Condition 3b (materials) attached to Planning Permission 145420/JO/2026.
Awaiting decision Conditions 5 docs -
Grass Verge To Footway In Front Of Petrol Filling Station Victoria Avenue Manchester
Prior Approval for the installation of a 20 metre high telecommunication monopole with wrap around cabin built round the base and 3no ground based equipment cabinets and ancillary development
Granted Telecoms Extension 11 docs -
160A Crab Lane Manchester M9 8WD
Works to tree - proposed removal of a tree from front garden
Granted Trees 3 docs -
Site Of Former Day Nursery Longhurst Road Manchester M9 8NS
Discharge of Conditions 7 (cycle store), 8a (travel plan), 9a (EVC) and 16 (drainage maintenance) attached to Planning Permission referenced 136721/FO/2023.
Split decision Conditions 24 docs -
18 Northdale Road Manchester M9 8WG
Reconfiguration of steps to front access
Granted Householder 6 docsDomestic -
Site Of Former Day Nursery Longhurst Road Manchester M9 8NS
Variation of Conditions 2, 7, 9, 12, 21, 22, 30 and 32 attached to Planning Permission 136721/FO/2023 to revise the drawing numbers to allow PV panels to be installed to Blocks 2-9, changes to the levels to the rear gardens of Blocks 3-9 to allow for the removal of the steps, changes in boundary treatments to respond to existing levels and include facing materials to retaining walls on landscaping plans, lowering of Block 2 eaves to be in line with Block 1, removing external air source heat pumps between houses to provide easier access, changing dormer windows, changing materials to corner dormers to Blocks 3 & 9, increasing cill height of first floor front elevation windows to Blocks 3-9 to accommodate timber frame to parapet roofs below, increase in path width to Block 1, reduce size of trees to the front of houses and apartments, reducing sizes of trees to the rear of the retaining wall to reduce impact of roots on retaining wall and removal of boundary walls to the fronts of houses.
Granted Amendments New dwelling Loft or dormer +2 30 docs
Other full applications applications
In Manchester
-
PLA-2026-001359 Awaiting decision
Ground floor of 62-64 Reddish Lane Manchester M18 7JL
Change of Use of the ground floor of 62-64 Reddish Lane from Class E (estate agents) to a tuition and education centre Class F1(a) including bin store and cycle store.
-
PLA-2026-001326 Awaiting decision
10 Fairfield Road Manchester M11 1EW
Change of Use from vacant place of worship/hall (F1/F2 use), to a restaurant lounge and bar (Class E/Sui Generis), together with external alterations and installation of external plant equipment.
-
PLA-2026-000525 Refused
80 Mauldeth Road West Manchester M20 1AB
Change of Use from shop to residential ground floor flat and associated works.
-
PLA-2026-000808 Granted
46 Withenfield Road Manchester M23 9BS
Erection of single-storey detached dwellinghouse with associated car parking landscaping and boundary treatments.
-
144470/FO/2025 Awaiting decision
20 Mayfield Road Manchester M16 8FT
Erection of a single-storey rear extension to form additional accommodation, and elevational alterations to side extension.