Planning application
Part Of Plot C And Plot E Great Jackson Street Manchester M15 4NP
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of conditions 14a (Dilapidation survey), 15a (Contaminated Land Phase 1), 17 (Archaeology Phase 1), 18a (LLP Construction Phase 1), 20 (CMP Phase 1), 55a (Contaminated Land Phase 2), 57 (Archaeology Phase 2), 58a (LLP Construction Phase 2) and 60 (CMP Phase 2) attached to planning permission 137226/FO/2023.
As published by the council, reference OTH-2026-001811
Application record
- Reference
- OTH-2026-001811
- Type
- Approval of details reserved by a condition
- Status
- Under Consideration
- Received
- 30 Sep 2026
- Validated
- 30 Sep 2026
- Ward
- Deansgate
- Postcode
- M15 4NP
Site history
Applications at this address on the Manchester register
This site has had 2 applications since 2023: 1 approved, 0 refused.
-
137226/FO/2023 Granted
Part Of Plot C And Plot E Great Jackson Street Manchester M15 4NP
Full planning permission for the demolition of existing structures and the phased construction of four residential buildings (two at 47 storeys and two at 51 storeys) to provide 1,746 homes (Use Class C3), flexible commercial, leisure, food and drink uses (all Use Class E) and / or drinking establishment (Sui Generis), basement car parking, cycle parking, landscaping and public realm, servicing and access arrangements, highways alterations and associated works.
Timeline
Dates from the published record
-
30 Sep 2026
Received by Manchester
-
10 Oct 2026
Added to PlanIndex
-
21 Nov 2026
Status changed to Under Consideration
Previously Under Consultation.
-
Decision
Awaiting decision
Decision expected by 25 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Manchester took a median of 55 days over the applications it decided in the last year.
Documents
10 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What happens while it is decided
This application is with Manchester for determination, against a statutory target of eight weeks. Over the last year Manchester decided condition discharge and variation applications in a median of 56 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
RCP Car Park Great Jackson Street Manchester M15 4NP
Non-Material Amendment to Planning Permission 137226/FO/2023 to amend the triggers on Conditions 21 (Phase 1: Material Samples and Specifications), 27 (Phase 1: Radar Mitigation Scheme), 29 (Phase 1: Instrument Flight Procedure Surfaces), 30 (Phase 1: TV Broadband and Radio Reception), 61 (Phase 2: Material Samples and Specifications), 67 (Phase 2: Radar Mitigation Scheme) , 69 (Phase 2: Instrument Flight Procedure Surfaces), 70 (Phase 2: TV Broadband and Radio Reception), 101 (Phase 3: Material Samples and Specifications), 107 (Phase 3: Radar Mitigation Scheme), 109 (Phase 3: Instrument Flight Procedure Surfaces), 110 (Phase 3: TV Broadband and Radio Reception), 141 (Phase 4: Material Samples and Specifications), 147 (Phase 4: Radar Mitigation Scheme), 149 (Phase 4: Instrument Flight Procedure Surfaces) and 150 (Phase 4: TV Broadband and Radio Reception).
Granted Amendments 4 docs -
Crown Street Phase 3 Plot E, Part Of Plot C And Plot E Great Jackson Street Manchester M15 4NP
90% historically approved · decision due ~25 Dec
Discharge of conditions Condition 24a - Wind Mitigation Phase 1 (Tower E2), 64a - Wind Mitigation Phase 2 (Tower E1) and 33a (Noise ) Phase 1 (Tower E2) attached to planning permission 137226/FO/2023.
Awaiting decision Conditions 14 docs -
Unit 3 Olympia Trading Estate Great Jackson Street Manchester M15 4NP
Change of use from tyre fitting service (Use Class B2) to MOT Test Centre (Sui Generis)
Granted Full applications 17 docs -
Olympia Trading Estate Great Jackson Street Manchester M15 4NP
Demolition of the existing buildings on the site and construction of three residential buildings, 32, 26 and 18 storeys in height, comprising a total of 399 residential units (C3) and 50 retirement living units (C2) with roof top ancillary restaurant; 675 sq.m of commercial floor space (Use Classes A1, A2, A3, A4, B1, D1 or D2); associated car and cycle parking within a basement level; public realm and landscaping; access and servicing arrangements; and other associated works.
Granted Full applications Demolition 79 docs -
Olympia Trading Estate Great Jackson Street Manchester M15 4NP
Display of non-illuminated banner sign on side of building and free-standing non-illuminated pole mounted sign to front of building
Granted Advertising 12 docs -
Olympia Trading Estate Great Jackson Street Manchester M15 4NP
Non-material amendment to planning permission 116850/FO/2017 to change the wording of the description and of condition 23 to allow changes to the internal layouts of the buildings and resulting external changes.
Granted Amendments 33 docs
Other condition discharge and variation applications
In Manchester
-
OTH-2026-001593 Granted
Premier Inn Derwent Avenue Manchester M21 7QS
Discharge of Conditions 6 (fumes/odours), 7a (external plant) and 12 (bat lighting) attached to Planning Permission referenced 140916/FO/2024.
-
OTH-2026-001113 Granted
Heaton Hall Heaton Park Middleton Road Manchester M25 2SW
Discharge of conditions 3 (basement penetrations), 4 (roof installations), 5 (repair/restoration works), and 6 (sample/spec of CCTV/intruder alarm) attached to Listed Building Consent 140297/LO/2024.
-
OTH-2026-001741 Granted
Manchester Islamic Girls High School 55 High Lane Manchester M21 9EE
Discharge of Conditions 4 (Boundary Treatment), 9c (Drainage Maintenance), 12 (EV Charging), 13 (Highway Works), 17 (Travel Pack) and 19 (External Lighting) attached to planning permission 143655/JO/2025
-
OTH-2026-001821 Granted
Abraham Moss Community School Crescent Road Manchester M8 5Uf
Discharge of Condition 17 (Removal strategy) attached to planning permission 145498/FO/2026.
-
OTH-2026-001498 Split decision
Abbey Hey Clinic Constable Street Manchester M18 8GD
Discharge of Conditions 3 (Materials), 4 (Construction Management Plan), and 16 (Sustainability) attached to Planning Permission 139693/FO/2024.