Planning application

Green space off Pollard Street and Wansfell Walk Manchester M4 7JB

Awaiting decision Manchester NOT-2026-001144 Prior approval Part 16 Class A: Electronic communications code operators

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of 20.0M Monopole Supporting 6No. Antennas And 2No. 0.3M Dishes with Installation Of 2No. Equipment Cabinets and associated Ancillary Equipment

As published by the council, reference NOT-2026-001144

Application record

Reference
NOT-2026-001144
Type
Prior approval Part 16 Class A: Electronic communications code operators
Status
Under Consideration
Received
24 Jul 2026
Validated
24 Jul 2026
Ward
Ancoats & Beswick
Decision by
Delegated Decision
Postcode
M4 7JB

Timeline

Dates from the published record

  1. 24 Jul 2026

    Received by Manchester

  2. 6 Aug 2026

    Added to PlanIndex

  3. 30 Aug 2026

    Status changed to Under Consideration

    Previously Under Consultation.

  4. Decision

    Awaiting decision

    Decision expected by 18 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Manchester took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Manchester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

In Manchester

  • NOT-2026-001023 Granted

    38 Overdale Road Manchester M22 4PX

    Prior-notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3.6m and a height at eaves of 2.8m.

    14 Jul 2026 Prior approval
  • NOT-2026-001230 Decided

    25 Brookburn Road Manchester M21 8FF

    Prior-notification of proposed larger home extension projecting 5.5m to the rear with a maximum height of 3m and a height at eaves of 2.5m.

    4 Aug 2026 Prior approval
  • NOT-2026-000996 Granted

    3 Lanreath Walk Manchester M8 8WF

    Prior notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3m and a height at eaves of 2.7m.

    13 Jul 2026 Prior approval
  • NOT-2026-000987 Granted

    23 Beechwood Avenue Manchester M21 8UA

    Prior notification of proposed larger home extension projecting 3.4m to the rear with a maximum height of 4m and a height at eaves of 3m.

    10 Jul 2026 Prior approval
  • NOT-2026-000886 Granted

    Footpath on South Side of Butler Street / Woodward Street Junction, North of 126 Butler Street Manchester M4 7JJ

    Prior approval for the siting of a 20m high telecommunications mast, associated antennas, cabinets and ancillary development for a period of 3 years.

    2 Jul 2026 Prior approval