Skip to content
PlanIndex Get alerts
Menu

Planning application

128520/FO/2020

1 Marsden Street Manchester M2 1HW

Granted Manchester Full Application Consent

Proposal

Installation of 3no. roller shutters to ground floor.

As published by the council, reference 128520/FO/2020

Timeline

Dates from the published record

  1. 4 Dec 2020

    Received by Manchester

  2. 5 Feb 2021

    Decision issued: Approved

  3. 21 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • CDN/20/0793 Granted

    Cavendish House Chapel Walks Manchester M2 1HN

    Discharge of condition 3 (CMP) related to planning permission reference 126422/FO/2020

    7 Dec 2020 29m away Conditions
  • CDN/20/0792 Granted

    Cavendish House Chapel Walks Manchester M2 1HN

    Discharge of condition 6 (watching brief) related to listed building consent reference 126423/LO/2020

    7 Dec 2020 32m away Conditions
  • CDN/20/0835 Granted

    Cavendish House Chapel Walks Manchester M2 1HN

    Discharge of condition 7 (historic photo record) related to listed building consent reference 126423/LO/2020

    16 Dec 2020 32m away Conditions
  • CDN/26/0223 Granted

    Pall Mall Court King Street Manchester M2 4PD

    Discharge of Conditions 8 (Environmental Standards Certificate), 9b (Plant Noise Verification) and 14 (Secured by Design Accrediation) of Planning Permission 143486/JO/2025

    6 Mar 2026 39m away Conditions
  • 145499/LO/2026 Granted

    Pall Mall Court 67 King Street Manchester M2 4PD

    Listed Building Consent for installation of various illuminated and non-illuminated signage.

    23 Mar 2026 45m away Heritage and listed buildings
  • 145582/AOH/2026 Granted

    Pall Mall Court King Street Manchester

    Installation of various non-illuminated and illuminated signage.

    27 Mar 2026 47m away Advertising

In Manchester

  • 145306/FO/2026 Granted

    24 Mount Street Manchester M2 3NX

    Installation of 2no. air conditioning units to roof.

    1 Jun 2026 Full applications
  • PLA-2026-000097 Refused

    8 Grandale Street, Manchester, M14 5WG

    Change of Use from Residential (Class C3) to 6 bed House in Multiple Occupation (Class C4).

    1 Jun 2026 Full applications
  • 143236/FO/2025 Granted

    Army Reserve Centre Ardwick Green North Manchester M12 6HD

    Erection of part three/part two storey extension to form entrance and stairway together with the formation of a roof terrace following demolition of existing extensions

    7 Jul 2025 Full applications
  • 142419/FO/2025 Granted

    Land Bound By Cross Keys Street, Goulden Street, Chadderton Street And Marshall Street New Cross Manchester M4 5ET

    Erection of 9-storey residential building (Use Class C3) comprising 104no. residential units with communal space, landscaping, infrastructure and other associated works.

    31 Mar 2025 Full applications
  • PLA-2026-000431 Granted

    302 St Mary's Road Manchester M40 0BD

    Retention of Automated Teller Machine.

    21 May 2026 Full applications