Skip to content
PlanIndex Get alerts
Menu

Planning application

Dental Hospital Higher Cambridge Street Manchester M15 6FH

Granted Manchester 127183/FO/2020 Full Application Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

New plant enclosure for existing plant equipment on the rooftop and new uPVC downpipes connecting to existing hoppers due to drainage issues. Surface water mounting on rooftop causing issues.

As published by the council, reference 127183/FO/2020

Application record

Reference
127183/FO/2020
Type
Full Application Consent
Status
Decided
Decision
Approved
Received
17 Jun 2020
Validated
17 Jun 2020
Decided
7 Aug 2020
Ward
Hulme Ward
Decision by
Delegated Decision
Postcode
M15 6FH

Site history

Applications at this address on the Manchester register

This site has had 2 applications since 2019: 2 approved, 0 refused.

  • 124007/FO/2019 Granted

    Dental Hospital Higher Cambridge Street Manchester M15 6FH

    Installation of edge protection to high level tank room to provide safe access for repair and maintenance.

    Decided 12 Sep 2019 Full applications

Timeline

Dates from the published record

  1. 17 Jun 2020

    Received by Manchester

  2. 7 Aug 2020

    Decision issued: Approved

  3. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Manchester

82 applications on PlanIndex · across 12 councils · 97% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Manchester granted permission on 7 August 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Manchester

  • PLA-2026-001359 Awaiting decision

    Ground floor of 62-64 Reddish Lane Manchester M18 7JL

    Change of Use of the ground floor of 62-64 Reddish Lane from Class E (estate agents) to a tuition and education centre Class F1(a) including bin store and cycle store.

    2 Sep 2026 Full applications
  • PLA-2026-001326 Awaiting decision

    10 Fairfield Road Manchester M11 1EW

    Change of Use from vacant place of worship/hall (F1/F2 use), to a restaurant lounge and bar (Class E/Sui Generis), together with external alterations and installation of external plant equipment.

    2 Sep 2026 Full applications
  • PLA-2026-000525 Refused

    80 Mauldeth Road West Manchester M20 1AB

    Change of Use from shop to residential ground floor flat and associated works.

    26 Jun 2026 Full applications
  • PLA-2026-000808 Granted

    46 Withenfield Road Manchester M23 9BS

    Erection of single-storey detached dwellinghouse with associated car parking landscaping and boundary treatments.

    28 Jul 2026 Full applications
  • 144470/FO/2025 Awaiting decision

    20 Mayfield Road Manchester M16 8FT

    Erection of a single-storey rear extension to form additional accommodation, and elevational alterations to side extension.

    1 Sep 2026 Full applications