Skip to content
PlanIndex Get alerts
Menu

Planning application

8 - 12 Clifton Road Manchester M21 8UX

Granted Manchester 126572/FO/2020 Full Application Consent

Works: New dwelling Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of No.8 and No.12 Clifton Road from 5 no. self contained flats and No.10 Clifton Road from a 6 bedroom House in Multiple Occupation to form 3no. single residential dwellinghouses together with elevational alterations (including dormer windows), landscaping and single storey rear extensions.

As published by the council, reference 126572/FO/2020

Application record

Reference
126572/FO/2020
Type
Full Application Consent
Status
Decided
Decision
Approved
Received
22 Apr 2020
Validated
22 Apr 2020
Decided
6 Jul 2022
Ward
Chorlton Park Ward
Decision by
Delegated Decision
Postcode
M21 8UX

Timeline

Dates from the published record

  1. 22 Apr 2020

    Received by Manchester

  2. 6 Jul 2022

    Decision issued: Approved

  3. 6 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Manchester

40 applications on PlanIndex · across 2 councils · 90% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2 Clifton Road Manchester M21 8UX

    PLA-2026-001013 Submitted 3 Aug 2026 15m away

    95% historically approved · decision due ~28 Sep

    Erection of single-storey rear extension, installation of side dormer extension and basement conversion (including enlargement of basement) with associated light well and solar panels and roof lights.

    Awaiting decision Householder Extension Loft or dormer 20 docs
    Small domestic
  • 12 Sefton Road Manchester M21 8UU

    126365/FH/2020 Submitted 28 Feb 2020 62m away

    Installation of dormer to side to provide additional living accommodation

    Granted Householder Loft or dormer 14 docs
    Domestic
  • 14 Sefton Road Manchester M21 8UU

    144863/FH/2026 Submitted 22 Jan 2026 63m away

    Installation of EV charger

    Granted Householder 5 docs
    Domestic
  • 5 Devonshire Road Manchester M21 8XB

    PLA-2026-001240 Submitted 4 Aug 2026 67m away

    95% historically approved · decision due ~29 Sep

    Erection of single-storey side/rear infill extension.

    Awaiting decision Householder Extension 3 docs
    Small domestic
  • 49 Corkland Road Manchester M21 8XG

    CDN/25/0759 Submitted 7 Aug 2025 72m away

    Discharge of Condition 3 (materials) attached to planning permission 142734/FH/2025

    Granted Conditions 4 docs
  • 40 Corkland Road Manchester M21 8XA

    122146/FH/2018 Submitted 20 Dec 2018 80m away

    Erection of a single storey rear extension, together with rear dormer with Juliet balcony and erection of boundary treatment at 2.00m high

    Granted Householder Extension Loft or dormer 7 docs
    Small domestic

In Manchester

  • PLA-2026-001359 Awaiting decision

    Ground floor of 62-64 Reddish Lane Manchester M18 7JL

    Change of Use of the ground floor of 62-64 Reddish Lane from Class E (estate agents) to a tuition and education centre Class F1(a) including bin store and cycle store.

    2 Sep 2026 Full applications
  • PLA-2026-001326 Awaiting decision

    10 Fairfield Road Manchester M11 1EW

    Change of Use from vacant place of worship/hall (F1/F2 use), to a restaurant lounge and bar (Class E/Sui Generis), together with external alterations and installation of external plant equipment.

    2 Sep 2026 Full applications
  • PLA-2026-000525 Refused

    80 Mauldeth Road West Manchester M20 1AB

    Change of Use from shop to residential ground floor flat and associated works.

    26 Jun 2026 Full applications
  • PLA-2026-000808 Granted

    46 Withenfield Road Manchester M23 9BS

    Erection of single-storey detached dwellinghouse with associated car parking landscaping and boundary treatments.

    28 Jul 2026 Full applications
  • 144470/FO/2025 Awaiting decision

    20 Mayfield Road Manchester M16 8FT

    Erection of a single-storey rear extension to form additional accommodation, and elevational alterations to side extension.

    1 Sep 2026 Full applications