Planning application
1 Middleton Road Manchester M8 5DT
Works: New dwelling
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Prior approval for change of use from offices (Use Class B1) to four self contained flats (C3a) and ground floor office space (Class B1).
As published by the council, reference 126499/P3OPA/2020
Application record
- Reference
- 126499/P3OPA/2020
- Type
- Prior Approval- Offices to dwelling
- Status
- Decided
- Decision
- Refused
- Received
- 12 Mar 2020
- Validated
- 12 Mar 2020
- Decided
- 25 Jun 2020
- Ward
- Crumpsall Ward
- Decision by
- Delegated Decision
- Postcode
- M8 5DT
Timeline
Dates from the published record
-
12 Mar 2020
Received by Manchester
-
25 Jun 2020
Decision issued: Refused
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this refusal means
Manchester refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
9 Middleton Road Manchester M8 5DT
Discharge of conditions 7 (rainwater goods) and 8 (roof materials) attached to planning permission referenced 121858/JO/2018
Granted Conditions 6 docs -
9 Middleton Road Manchester M8 5DT
Non material amendment to condition 2 of planning permission referenced 114823/FH/2016 to allow alterations to external staircase and application of render to front elevation at basement level
Granted Amendments 5 docs -
9 Middleton Road Manchester M8 5DT
Variation of condition 2 (specified plans) attached to planning permission referenced 114823/FH/2016 to allow elevational alterations
Granted Amendments 4 docs -
9 Middleton Road Manchester M8 5DT
Discharge of conditions 3 (materials) and 7 (rainwater goods) attached to planning permission 114823/FH/2016
Withdrawn Conditions 5 docs -
2 Copeland Close Manchester M8 4HW
Erection of a part single, part two, part three storey rear extension, together with associated roof and elevational alterations to form additional living accommodation
Granted Householder Extension 19 docsDomestic -
Land On Catherine Road Manchester M8 4HE
Variation of Conditions 2 (specified plans) and 23 (tree retention) attached to planning permission 139500/FO/2024 to allow loss of tree and alteration to footprint of development
Refused Amendments Trees 12 docs
Other prior approval applications
In Manchester
-
NOT-2026-001023 Granted
38 Overdale Road Manchester M22 4PX
Prior-notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3.6m and a height at eaves of 2.8m.
-
NOT-2026-001230 Decided
25 Brookburn Road Manchester M21 8FF
Prior-notification of proposed larger home extension projecting 5.5m to the rear with a maximum height of 3m and a height at eaves of 2.5m.
-
NOT-2026-000996 Granted
3 Lanreath Walk Manchester M8 8WF
Prior notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3m and a height at eaves of 2.7m.
-
NOT-2026-000987 Granted
23 Beechwood Avenue Manchester M21 8UA
Prior notification of proposed larger home extension projecting 3.4m to the rear with a maximum height of 4m and a height at eaves of 3m.
-
NOT-2026-000886 Granted
Footpath on South Side of Butler Street / Woodward Street Junction, North of 126 Butler Street Manchester M4 7JJ
Prior approval for the siting of a 20m high telecommunications mast, associated antennas, cabinets and ancillary development for a period of 3 years.