Planning application
The Oast House Crown Square Manchester M3 3AY
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Extension to period that a tepee (extension to the Oast House) is erected (further to planning permission 108655/FO/2015/C1)
As published by the council, reference 125975/FO/2020
Application record
- Reference
- 125975/FO/2020
- Type
- Full Application Consent
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 29 Jan 2020
- Validated
- 29 Jan 2020
- Decided
- 1 May 2020
- Ward
- Deansgate Ward
- Decision by
- Delegated Decision
- Postcode
- M3 3AY
Site history
Applications at this address on the Manchester register
This site has had 8 applications since 2015: 5 approved, 1 refused.
-
118968/JO/2018 Decided
The Oast House Crown Square Manchester M3 3AY
Application to vary condition 11 (Hours of Operation) imposed upon planning approval reference 115836/FO/2017 under section 73 of the Town And Country Planning Act 1990 to amend the approved hours of operation.
-
CDN/18/0058 Split decision
The Oast House Crown Square Manchester M3 3AY
Discharge of Conditions 12 (Fumes), 13 (Acoustic Insulation), 14 (External Plant) and 17 (Construction Management Plan) of application reference 115836/FO/2017
-
CDN/17/0813 Refused
The Oast House Crown Square Manchester M3 3AY
Discharge of Condition 16a (Risk Assessment) of application reference 115836/FO/2017
-
CDN/17/0752 Granted
The Oast House Crown Square Manchester M3 3AY
Discharge of Condition 19 (Servicing Strategy) of application reference 115836/FO/2017
-
115836/FO/2017 Granted
The Oast House Crown Square Manchester M3 3AY
Extension to the existing Oast House building (Use Class A3/A4) to provide store, kitchen and refuse area and the redevelopment of Crown Square to include 2 No. F&B pavilions, 1 No. events stage, 7 No. canopies and the hard landscaping of the site.
-
111045/FO/2016/C1 Granted
The Oast House Crown Square Manchester M3 3AY
Replacement of existing external porch
-
108655/FO/2015/C1 Granted
The Oast House Crown Square Manchester M3 3AY
Erection of tepee to be used as an extension to the Oast House for temporary time period of 16 weeks per year from Mid October to the end of January.
Timeline
Dates from the published record
-
29 Jan 2020
Received by Manchester
-
1 May 2020
Decision issued: Approved
-
6 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
P4 Planning Limited Agent, a planning consultancy
42 applications on PlanIndex · across 12 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
25 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 1 May 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Oast House Crown Square Manchester M3 3AY
Extension to the existing Oast House building (Use Class A3/A4) to provide store, kitchen and refuse area and the redevelopment of Crown Square to include 2 No. F&B pavilions, 1 No. events stage, 7 No. canopies and the hard landscaping of the site.
Granted Full applications Extension 38 docs -
The Oast House Crown Square Manchester M3 3AY
Erection of tepee to be used as an extension to the Oast House for temporary time period of 16 weeks per year from Mid October to the end of January.
Granted Full applications Extension 32 docs -
The Oast House Crown Square Manchester M3 3AY
Replacement of existing external porch
Granted Full applications Extension 8 docsSmall domestic -
The Oast House Crown Square Manchester M3 3AY
Discharge of Condition 16a (Risk Assessment) of application reference 115836/FO/2017
Refused Conditions 9 docs -
The Oast House Crown Square Manchester M3 3AY
Application to vary condition 11 (Hours of Operation) imposed upon planning approval reference 115836/FO/2017 under section 73 of the Town And Country Planning Act 1990 to amend the approved hours of operation.
Decided Amendments 6 docs -
The Oast House Crown Square Manchester M3 3AY
Discharge of Condition 19 (Servicing Strategy) of application reference 115836/FO/2017
Granted Conditions 7 docs
Other full applications
In Manchester
-
PLA-2026-001258 Granted
Vision House 100 Floats Road Manchester M23 9PL
Installation of a multi-use games area (MUGA) to rear
-
PLA-2026-000465 Granted
21A Didsbury Park Manchester M20 5LH
Erection of outbuilding (incorporating seating, dining, kitchen, spa, changing room, WC and plant room) with sunken swim spa, associated landscaping and side gate wall.
-
PLA-2026-001705 Awaiting decision
Oakley 188 Wilmslow Road Manchester M14 6LJ
Partial demolition, refurbishment and conversion of existing buildings together with construction of 53no. residential dwellings (Use Class C3), along with associated hard and soft landscaping, car parking, access and associated works.
-
PLA-2026-000769 Refused
12 Kelstern Square Manchester M13 0XW
Erection of a self-contained 2-bed ground floor residential dwelling to the rear of the existing property, including associated access, amenity space, refuse storage, bin storage, landscape and yard.
-
PLA-2026-001800 Awaiting decision
Northern Lawn Tennis Club Palatine Road Manchester M20 3YA
Refurbishment works to the existing indoor tennis court building at Northern Lawn Tennis Club, including removal of the existing asbestos roof and replacement; replacement and alteration of rooflights; bricking up of selected windows; installation of new black louvred ventilation windows, replacement doors and mechanical ventilation system; removal of external fire escape stairs; upgrading of roof drainage; replacement of existing louvres and retained doors in black; and associated repairs and refurbishment to structural and external elements.