Planning application
91 Yew Tree Road Manchester M14 7BD
Works: Extension
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Prior Notification for Larger Home Extension with a rearward projection of 6.00 metres, a maximum height of 3.0 metres and a maximum eaves height of 2.65 metres
As published by the council, reference 125055/PDE/2019
Application record
- Reference
- 125055/PDE/2019
- Type
- General Permitted Development-Extensions
- Status
- Decided
- Decision
- Refused extension - GPD
- Received
- 15 Oct 2019
- Validated
- 15 Oct 2019
- Decided
- 26 Nov 2019
- Ward
- Fallowfield Ward
- Decision by
- Delegated Decision
- Postcode
- M14 7BD
Timeline
Dates from the published record
-
15 Oct 2019
Received by Manchester
-
26 Nov 2019
Decision issued: Refused extension - GPD
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this refusal means
Manchester refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
97 Yew Tree Road Manchester M14 7BD
Proposed larger home extension projecting 4.72m to the rear, with a maximum height of 2.97m and a height at eaves of 2.97m
Granted Prior approval Extension 10 docs -
10 Whitmore Road Manchester M14 7RG
Erection of a single storey detached garage at side of dwelling
Granted Householder 6 docsSmall domestic -
10 Whitmore Road Manchester M14 7RG
Erection of a two storey side extension to form additional living accommodation
Refused Full applications Extension 6 docs -
109 Yew Tree Road Manchester M14 7BD
Formation of access ramp to front of the property
Granted Householder 5 docsDomestic -
109 Yew Tree Road Manchester M14 7BD
Installation of side and rear access ramp
Granted Householder 6 docsDomestic -
77 Yew Tree Road Manchester M14 7BJ
Erection of a part single, part two-storey rear extension, installation of rear dormer and erection of a single storey outbuilding to rear to provide additional living accommodation.
Granted Householder Extension Loft or dormer 5 docsSmall domestic
Other prior approval applications
In Manchester
-
NOT-2026-001023 Granted
38 Overdale Road Manchester M22 4PX
Prior-notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3.6m and a height at eaves of 2.8m.
-
NOT-2026-001230 Decided
25 Brookburn Road Manchester M21 8FF
Prior-notification of proposed larger home extension projecting 5.5m to the rear with a maximum height of 3m and a height at eaves of 2.5m.
-
NOT-2026-000996 Granted
3 Lanreath Walk Manchester M8 8WF
Prior notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3m and a height at eaves of 2.7m.
-
NOT-2026-000987 Granted
23 Beechwood Avenue Manchester M21 8UA
Prior notification of proposed larger home extension projecting 3.4m to the rear with a maximum height of 4m and a height at eaves of 3m.
-
NOT-2026-000886 Granted
Footpath on South Side of Butler Street / Woodward Street Junction, North of 126 Butler Street Manchester M4 7JJ
Prior approval for the siting of a 20m high telecommunications mast, associated antennas, cabinets and ancillary development for a period of 3 years.