Skip to content
PlanIndex Get alerts
Menu

Planning application

77 Manley Road Manchester M16 8WF

Granted Manchester 124905/NMC/2019 Non-Material Change Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non Material Amendment relating to planning approval 123850/FH/2019 to carry out a number of elevational alterations

As published by the council, reference 124905/NMC/2019

Application record

Reference
124905/NMC/2019
Type
Non-Material Change Application
Status
Decided
Decision
Approved
Received
23 Sep 2019
Validated
23 Sep 2019
Decided
21 Oct 2019
Ward
Chorlton Park Ward
Decision by
Delegated Decision
Postcode
M16 8WF

Site history

Applications at this address on the Manchester register

This site has had 3 applications since 2018: 3 approved, 0 refused.

  • 123850/FH/2019 Granted

    77 Manley Road Manchester M16 8WF

    Erection of single-storey side extension, single-storey rear extension, installation of dormer to rear, rear patio with privacy fencing above together with elevational alteration to first floor window to the side and rooflights to the front roof slope and erection of a single storey outbuilding to rear to provide additional living accommodation

    Decided 6 Aug 2019 Householder
  • 120452/FH/2018 Granted

    77 Manley Road Manchester M16 8WF

    Erection of two-storey side extension, single-storey rear extension, installation of dormer to rear, erection single-storey detached outbuilding and extension to existing outbuilding

    Decided 26 Sep 2018 Householder

Timeline

Dates from the published record

  1. 23 Sep 2019

    Received by Manchester

  2. 21 Oct 2019

    Decision issued: Approved

  3. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Manchester granted permission on 21 October 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 77 Manley Road Manchester M16 8WF

    120452/FH/2018 Submitted 25 Jul 2018 20m away

    Erection of two-storey side extension, single-storey rear extension, installation of dormer to rear, erection single-storey detached outbuilding and extension to existing outbuilding

    Granted Householder Extension Loft or dormer 12 docs
    Small domestic
  • 77 Manley Road Manchester M16 8WF

    123850/FH/2019 Submitted 12 Jun 2019 28m away

    Erection of single-storey side extension, single-storey rear extension, installation of dormer to rear, rear patio with privacy fencing above together with elevational alteration to first floor window to the side and rooflights to the front roof slope and erection of a single storey outbuilding to rear to provide additional living accommodation

    Granted Householder Extension Loft or dormer +1 12 docs
    Small domestic
  • 89 Manley Road Manchester M16 8WE

    CDN/19/0190 Submitted 8 Mar 2019 60m away

    Discharge of Condition 3 Materials attached to planning permission reference 118128/FH/20/2017

    Granted Conditions 4 docs
  • Land Between 76 & 80 Manley Road Manchester M16 8ND

    130334/FO/2021 Submitted 2 Jun 2021 66m away

    Erection of 1no. three-storey, 5 bedroom detached dwellinghouse with associated landscaping and parking

    Granted Full applications 11 docs
    Domestic
  • 76 Manley Road Manchester M16 8ND

    CDN/20/0533 Submitted 18 Aug 2020 67m away

    Discharge of Conditions 3 (Materials), 4 (Contaminated Land), 6 (Secured by Design), 7 (Landscaping) attached to planning permission 118405/FO/2017

    Split decision Conditions 6 docs
  • 65 Manley Road Manchester M16 8WF

    122417/FO/2019 Submitted 21 Jan 2019 69m away

    Erection of a pair of two-storey semi-detached houses with accommodation in the roof, with associated parking and boundary treatment following demolition of existing dwellinghouse

    Granted Full applications Demolition 5 docs
    Domestic

In Manchester

  • 144011/JO/2025 Granted

    271 Oldham Road Manchester M40 7PS

    Variation of planning application 127971/FO/2020 to vary conditions 2 (Specified Plans), 18 (Landscaping), 20 (Noise), and 29 (off site highways) to make elevational alterations, reduce car parking spaces and amend triggers in the conditions

    18 Sep 2025 Amendments
  • OTH-2026-001083 Granted

    Walkers Of Manchester Crabtree Lane Manchester M11 4GU

    Non Material Change to planning permission reference 143419/JO/2025 to allow increase in external floor levels of +100mm, area increase by 3%, roof plan updates following detailed design of PV and Rooflights arrangement, External Wall Louvres added and alterations to boundary treatments and hard landscaping finishes.

    20 Jul 2026 Amendments
  • PLA-2026-001061 Granted

    18 Kempton Road Manchester M19 2GJ

    Variation of Condition 2 (specified plans) attached to Planning Permission 145495/FH/2026 to allow changes to roof form.

    17 Jul 2026 Amendments
  • PLA-2026-000985 Granted

    Sunlight House Seventh & Eighth Floor Quay Street Manchester M3 3JZ

    Variation of condition 2 (Approved Plans) and 5 (Finishes) attached to Listed Building Consent 145027/LO/2026 to reflect internal layout changes and finishes.

    9 Jul 2026 Amendments
  • OTH-2026-001247 Granted

    Birtles House Unit 1 Market Place Civic Centre Manchester M22 5RE

    Non material amendment to planning permission referenced 144669/FO/2025 to allow alterations to the wording of conditions 5 (Metrolink CMP), 7 (electromagnetic compatibility plan), 9 (local labour), 13 (surface water drainage) and 31 (Bird Hazard Management Plan) in order to alter the timescales to facilitate demolition and site clearance works

    5 Aug 2026 Amendments