Skip to content
PlanIndex Get alerts
Menu

Planning application

4A Ridgefield/111 Deansgate Manchester M2 6EQ

Granted Manchester 124851/FO/2019 Full Application Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of existing non-original double entrance doors to Deansgate elevation entrance and replacement with new doors.

As published by the council, reference 124851/FO/2019

Application record

Reference
124851/FO/2019
Type
Full Application Consent
Status
Decided
Decision
Approved
Received
16 Sep 2019
Validated
16 Sep 2019
Decided
21 Nov 2019
Ward
Deansgate Ward
Decision by
Delegated Decision
Postcode
M2 6EQ

Timeline

Dates from the published record

  1. 16 Sep 2019

    Received by Manchester

  2. 21 Nov 2019

    Decision issued: Approved

  3. 6 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Manchester

37 applications on PlanIndex · across 5 councils · 97% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 4A Ridgefield Manchester M2 6EQ

    124643/AO/2019 Submitted 16 Sep 2019 0m away

    Installation of 2no. internally illuminated individual letter fascia signs.

    Granted Advertising 10 docs
  • 4A Ridgefield/111 Deansgate Manchester M2 6EQ

    124852/LO/2019 Submitted 16 Sep 2019 1m away

    LISTED BUILDING CONSENT for removal of existing non-original double entrance doors to Deansgate elevation entrance and replacement with new doors.

    Granted Heritage and listed buildings 11 docs
  • 4A Ridgefield Manchester M2 6EQ

    124620/LO/2019 Submitted 16 Sep 2019 1m away

    LISTED BUILDING CONSENT for installation of 2no. fascia signs and internal alterations including removal of internal non-original columns and partitions

    Granted Heritage and listed buildings 15 docs
  • 4A Ridgefield Manchester M2 6EQ

    144852/LO/2025 Submitted 27 Mar 2026 6m away

    Listed Building Consent for elevational alterations for new shopfront and associated internal partitions.

    Granted Heritage and listed buildings Windows or glazing 19 docs
  • 4A Ridgefield Manchester M2 6EQ

    144851/FO/2025 Submitted 27 Mar 2026 6m away

    Creation of new commercial Class E(b) unit with associated external alterations, including installation of new shopfront.

    Granted Full applications Windows or glazing 14 docs
  • Queens Chambers 5 John Dalton Street Manchester M2 6ET

    118701/FO/2017 Submitted 13 Feb 2018 9m away

    Rationalisation of fire escape provision from the units on the lower basement floor with proposed new refuse provision and construction of new interventions into the courtyard.

    Granted Full applications 21 docs

In Manchester

  • PLA-2026-001359 Awaiting decision

    Ground floor of 62-64 Reddish Lane Manchester M18 7JL

    Change of Use of the ground floor of 62-64 Reddish Lane from Class E (estate agents) to a tuition and education centre Class F1(a) including bin store and cycle store.

    2 Sep 2026 Full applications
  • PLA-2026-001326 Awaiting decision

    10 Fairfield Road Manchester M11 1EW

    Change of Use from vacant place of worship/hall (F1/F2 use), to a restaurant lounge and bar (Class E/Sui Generis), together with external alterations and installation of external plant equipment.

    2 Sep 2026 Full applications
  • PLA-2026-000525 Refused

    80 Mauldeth Road West Manchester M20 1AB

    Change of Use from shop to residential ground floor flat and associated works.

    26 Jun 2026 Full applications
  • PLA-2026-000808 Granted

    46 Withenfield Road Manchester M23 9BS

    Erection of single-storey detached dwellinghouse with associated car parking landscaping and boundary treatments.

    28 Jul 2026 Full applications
  • 144470/FO/2025 Awaiting decision

    20 Mayfield Road Manchester M16 8FT

    Erection of a single-storey rear extension to form additional accommodation, and elevational alterations to side extension.

    1 Sep 2026 Full applications