Planning application
557A Barlow Moor Road Manchester M21 8AN
Works: New dwelling Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior notification of change of use from offices (Class B1) to four apartments (use class C3).
As published by the council, reference 122662/P3OPA/2019
Application record
- Reference
- 122662/P3OPA/2019
- Type
- Prior Approval- Offices to dwelling
- Status
- Decided
- Decision
- Approved
- Received
- 6 Feb 2019
- Validated
- 6 Feb 2019
- Decided
- 1 Apr 2019
- Ward
- Chorlton Park Ward
- Decision by
- Delegated Decision
- Postcode
- M21 8AN
Timeline
Dates from the published record
-
6 Feb 2019
Received by Manchester
-
1 Apr 2019
Decision issued: Approved
-
13 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Manchester
4 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
559A Barlow Moor Road Manchester M21 8AN
Discharge of Conditions 10 (bin storage) and 12 (extraction flue colour) attached to planning permission 123744/FO/2019
Granted Conditions 4 docs -
559A Barlow Moor Road Manchester M21 8AN
Change of use from shop (Class A1) to restaurant/cafe (Class A3) and installation of flue to the side and a retractable awning to the front
Granted Full applications 13 docs -
559A Barlow Moor Road Manchester M21 8AN
Discharge of condition nos 6 (acoustic insulation) and 8 (acoustic attenuation) attached to planning permission 123744/FO/2019
Granted Conditions 5 docs -
559 Barlow Moor Road Manchester M21 8AN
Use of part of second floor as an office within class B1, together with the installation of dormer to front elevation, and roof lights to rear elevation.
Granted Full applications Loft or dormer 8 docs -
553 Barlow Moor Road Manchester M21 8AN
Use of lower ground floor and second floor as two separate self-contained flats (Use Class C3)
Granted Lawful development New dwelling 12 docs -
9 Napier Road Manchester M21 8AW
80% historically approved · decision due ~15 Oct
Change of Use of house from a dwellinghouse (C3) to a 4 bedroom House in Multiple Occupation (C4).
Awaiting decision Full applications 4 docsDomestic
Other prior approval applications
In Manchester
-
NOT-2026-001023 Granted
38 Overdale Road Manchester M22 4PX
Prior-notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3.6m and a height at eaves of 2.8m.
-
NOT-2026-001230 Decided
25 Brookburn Road Manchester M21 8FF
Prior-notification of proposed larger home extension projecting 5.5m to the rear with a maximum height of 3m and a height at eaves of 2.5m.
-
NOT-2026-000996 Granted
3 Lanreath Walk Manchester M8 8WF
Prior notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3m and a height at eaves of 2.7m.
-
NOT-2026-000987 Granted
23 Beechwood Avenue Manchester M21 8UA
Prior notification of proposed larger home extension projecting 3.4m to the rear with a maximum height of 4m and a height at eaves of 3m.
-
NOT-2026-000886 Granted
Footpath on South Side of Butler Street / Woodward Street Junction, North of 126 Butler Street Manchester M4 7JJ
Prior approval for the siting of a 20m high telecommunications mast, associated antennas, cabinets and ancillary development for a period of 3 years.