Planning application
154 Wythenshawe Road Manchester M23 0PF
Works: Extension
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Prior Notification for Larger Home Extension with a rearward projection of 6.00 metres, a maximum eaves height of 2.90 metres and a maximum eaves height of 2.90 metres
As published by the council, reference 122289/PDE/2019
Application record
- Reference
- 122289/PDE/2019
- Type
- General Permitted Development-Extensions
- Status
- Decided
- Decision
- Conditional extension - GPD
- Received
- 3 Jan 2019
- Validated
- 3 Jan 2019
- Decided
- 31 Jan 2019
- Ward
- Northenden Ward
- Decision by
- Delegated Decision
- Postcode
- M23 0PF
Timeline
Dates from the published record
-
3 Jan 2019
Received by Manchester
-
31 Jan 2019
Decision issued: Conditional extension - GPD
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Manchester has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
148 Wythenshawe Road Manchester M23 0PF
Erection of single storey side and rear extension, installation of dormers to front and rear and alterations to existing garage
Granted Householder Extension Loft or dormer 17 docsSmall domestic -
194 Wythenshawe Road Manchester M23 0PF
Erection of a single-storey rear extension
Granted Householder Extension 6 docsSmall domestic -
Wythenshawe Park Wythenshawe Manchester M23 0AB
City Council Development for the creation of a temporary car park for approximately 100 vehicles for a period of 2 years, along with associated landscaping.
Granted Other 18 docs -
23 Hallas Grove Manchester M23 0GZ
Erection of a part single part two storey side extension to provide additional living accommodation
Granted Householder Extension 5 docsDomestic -
23 Hallas Grove Manchester M23 0GZ
Non Material Amendment to application 123106/FH/2019 to allow changes to the roof profile to alter hip to gable
Refused Amendments Loft or dormer 4 docs -
23 Hallas Grove Manchester M23 0GZ
Erection of two-storey side extension, single-storey rear extension following demolition of existing conservatory and front porch to form additional living accommodation
Granted Householder Extension Demolition 5 docsSmall domestic
Other prior approval applications
In Manchester
-
NOT-2026-001023 Granted
38 Overdale Road Manchester M22 4PX
Prior-notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3.6m and a height at eaves of 2.8m.
-
NOT-2026-001230 Decided
25 Brookburn Road Manchester M21 8FF
Prior-notification of proposed larger home extension projecting 5.5m to the rear with a maximum height of 3m and a height at eaves of 2.5m.
-
NOT-2026-000996 Granted
3 Lanreath Walk Manchester M8 8WF
Prior notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3m and a height at eaves of 2.7m.
-
NOT-2026-000987 Granted
23 Beechwood Avenue Manchester M21 8UA
Prior notification of proposed larger home extension projecting 3.4m to the rear with a maximum height of 4m and a height at eaves of 3m.
-
NOT-2026-000886 Granted
Footpath on South Side of Butler Street / Woodward Street Junction, North of 126 Butler Street Manchester M4 7JJ
Prior approval for the siting of a 20m high telecommunications mast, associated antennas, cabinets and ancillary development for a period of 3 years.