Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Middleton Road Manchester M8 5DT

Granted Manchester 121858/JO/2018 Variation or Removal of Condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of condition 2 (specified plans) attached to planning permission referenced 114823/FH/2016 to allow elevational alterations

As published by the council, reference 121858/JO/2018

Application record

Reference
121858/JO/2018
Type
Variation or Removal of Condition
Status
Decided
Decision
Approved
Received
15 Nov 2018
Validated
15 Nov 2018
Decided
31 Jan 2019
Ward
Crumpsall Ward
Decision by
Delegated Decision
Postcode
M8 5DT

Site history

Applications at this address on the Manchester register

This site has had 4 applications since 2018: 3 approved, 0 refused.

  • CDN/19/0134 Granted

    9 Middleton Road Manchester M8 5DT

    Discharge of conditions 7 (rainwater goods) and 8 (roof materials) attached to planning permission referenced 121858/JO/2018

    Decided 25 Jun 2019 Conditions
  • CDN/18/0421 Withdrawn

    9 Middleton Road Manchester M8 5DT

    Discharge of conditions 3 (materials) and 7 (rainwater goods) attached to planning permission 114823/FH/2016

    Decided 30 Aug 2018 Conditions
  • 119950/NMC/2018 Granted

    9 Middleton Road Manchester M8 5DT

    Non material amendment to condition 2 of planning permission referenced 114823/FH/2016 to allow alterations to external staircase and application of render to front elevation at basement level

    Decided 24 May 2018 Amendments

Timeline

Dates from the published record

  1. 15 Nov 2018

    Received by Manchester

  2. 31 Jan 2019

    Decision issued: Approved

  3. 13 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Manchester

136 applications on PlanIndex · across 20 councils · 74% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Manchester granted permission on 31 January 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 9 Middleton Road Manchester M8 5DT

    CDN/18/0421 Submitted 15 Jun 2018 2m away

    Discharge of conditions 3 (materials) and 7 (rainwater goods) attached to planning permission 114823/FH/2016

    Withdrawn Conditions 5 docs
  • 9 Middleton Road Manchester M8 5DT

    CDN/19/0134 Submitted 30 Apr 2019 3m away

    Discharge of conditions 7 (rainwater goods) and 8 (roof materials) attached to planning permission referenced 121858/JO/2018

    Granted Conditions 6 docs
  • 9 Middleton Road Manchester M8 5DT

    119950/NMC/2018 Submitted 2 May 2018 3m away

    Non material amendment to condition 2 of planning permission referenced 114823/FH/2016 to allow alterations to external staircase and application of render to front elevation at basement level

    Granted Amendments 5 docs
  • 13 Middleton Road Manchester M8 5DT

    126644/FH/2020 Submitted 7 Apr 2020 15m away

    Installation of front and rear dormers to form additional living accommodation

    Withdrawn Householder Loft or dormer 5 docs
    Domestic
  • 13 Middleton Road Manchester M8 5DT

    127491/FH/2020 Submitted 17 Jul 2020 17m away

    Installation of two rear roof dormers to form additional living accommdation

    Granted Householder Loft or dormer 7 docs
    Domestic
  • 27-29 Middleton Road Manchester M8 5DT

    PLA-2026-000430 Submitted 16 Jun 2026 24m away

    80% historically approved · decision due ~11 Aug

    Demolition of the existing buildings (Use Class C3) and construction of a new purpose-built synagogue (Use Class F1).

    Awaiting decision Full applications Demolition 27 docs

In Manchester

  • 144011/JO/2025 Granted

    271 Oldham Road Manchester M40 7PS

    Variation of planning application 127971/FO/2020 to vary conditions 2 (Specified Plans), 18 (Landscaping), 20 (Noise), and 29 (off site highways) to make elevational alterations, reduce car parking spaces and amend triggers in the conditions

    18 Sep 2025 Amendments
  • OTH-2026-001083 Granted

    Walkers Of Manchester Crabtree Lane Manchester M11 4GU

    Non Material Change to planning permission reference 143419/JO/2025 to allow increase in external floor levels of +100mm, area increase by 3%, roof plan updates following detailed design of PV and Rooflights arrangement, External Wall Louvres added and alterations to boundary treatments and hard landscaping finishes.

    20 Jul 2026 Amendments
  • PLA-2026-001061 Granted

    18 Kempton Road Manchester M19 2GJ

    Variation of Condition 2 (specified plans) attached to Planning Permission 145495/FH/2026 to allow changes to roof form.

    17 Jul 2026 Amendments
  • PLA-2026-000985 Granted

    Sunlight House Seventh & Eighth Floor Quay Street Manchester M3 3JZ

    Variation of condition 2 (Approved Plans) and 5 (Finishes) attached to Listed Building Consent 145027/LO/2026 to reflect internal layout changes and finishes.

    9 Jul 2026 Amendments
  • OTH-2026-001247 Granted

    Birtles House Unit 1 Market Place Civic Centre Manchester M22 5RE

    Non material amendment to planning permission referenced 144669/FO/2025 to allow alterations to the wording of conditions 5 (Metrolink CMP), 7 (electromagnetic compatibility plan), 9 (local labour), 13 (surface water drainage) and 31 (Bird Hazard Management Plan) in order to alter the timescales to facilitate demolition and site clearance works

    5 Aug 2026 Amendments