Planning application
70 Warbeck Road Manchester M40 3LP
Works: Extension
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Prior notification of proposed larger home extension extending beyond rear wall 3.4m, maximum height from ground level 3.30m with a height to eaves of 2.90m
As published by the council, reference 120844/PDE/2018
Application record
- Reference
- 120844/PDE/2018
- Type
- General Permitted Development-Extensions
- Status
- Decided
- Decision
- Conditional extension - GPD
- Received
- 30 Jul 2018
- Validated
- 30 Jul 2018
- Decided
- 21 Sep 2018
- Ward
- Moston Ward
- Decision by
- Delegated Decision
- Postcode
- M40 3LP
Timeline
Dates from the published record
-
30 Jul 2018
Received by Manchester
-
21 Sep 2018
Decision issued: Conditional extension - GPD
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Manchester has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
76 Warbeck Road Manchester M40 3LP
Erection of single storey rear extension to form additional living accommodation together with single storey detached outbuilding to rear
Granted Householder Extension 15 docsSmall domestic -
24 Broadway Manchester M40 3LN
Part retrospective application for the change of use of ground floor to a shop (Class E) together with elevational alterations to the front, erection of first floor rear extension and installation of rear roof dormer to create a 3 bedroom duplex flat (Class C3)
Refused Full applications Extension Loft or dormer 9 docs -
19 Lindale Avenue Manchester M40 3LX
Installation of front, side and rear access ramp
Granted Householder 6 docsDomestic -
40 Heppleton Road Manchester M40 3LU
Installation of access ramp to front door with associated works to existing driveway
Granted Householder 20 docsDomestic -
227 Moston Lane East Manchester M40 3HY
Erection of a two storey dwellinghouse (Use Class C3a) together with associated boundary treatment following demolition of existing garage
Granted Full applications Demolition 9 docsDomestic -
227 Moston Lane East Manchester M40 3HY
Discharge of condition 6b (ground conditions verification) attached to planning permission ref: 129142/FO/2021.
Granted Conditions 6 docs
Other prior approval applications
In Manchester
-
NOT-2026-001023 Granted
38 Overdale Road Manchester M22 4PX
Prior-notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3.6m and a height at eaves of 2.8m.
-
NOT-2026-001230 Decided
25 Brookburn Road Manchester M21 8FF
Prior-notification of proposed larger home extension projecting 5.5m to the rear with a maximum height of 3m and a height at eaves of 2.5m.
-
NOT-2026-000996 Granted
3 Lanreath Walk Manchester M8 8WF
Prior notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3m and a height at eaves of 2.7m.
-
NOT-2026-000987 Granted
23 Beechwood Avenue Manchester M21 8UA
Prior notification of proposed larger home extension projecting 3.4m to the rear with a maximum height of 4m and a height at eaves of 3m.
-
NOT-2026-000886 Granted
Footpath on South Side of Butler Street / Woodward Street Junction, North of 126 Butler Street Manchester M4 7JJ
Prior approval for the siting of a 20m high telecommunications mast, associated antennas, cabinets and ancillary development for a period of 3 years.