Planning application

Webster Primary School Denmark Road Manchester M15 6JU

Granted Manchester 120214/NMC/2018 Non-Material Change Application

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non-material amendment to planning permission ref: 117705/FO/2017 to allow revised external elevation of extension

As published by the council, reference 120214/NMC/2018

Application record

Reference
120214/NMC/2018
Type
Non-Material Change Application
Status
Decided
Decision
Approved
Received
11 Jun 2018
Validated
11 Jun 2018
Decided
9 Jul 2018
Ward
Hulme Ward
Decision by
Delegated Decision
Postcode
M15 6JU

Site history

Applications at this address on the Manchester register

This site has had 3 applications since 2018: 2 approved, 0 refused.

  • CDN/18/0801 Granted

    Webster Primary School Denmark Road Manchester M15 6JU

    Discharge of Conditions 11 (Contaminated Land), 13 (Secured by Design) and 15 (Travel Plan) attached to planning permission reference 117837/VO/2017

    Decided 3 Dec 2018 Conditions
  • CDN/18/0106 Split decision

    Webster Primary School Denmark Road Manchester M15 6JU

    Discharge of condition nos. 4 (landscaping), 6 (drainage), 7 (drainage), 10 (acoustic insulation) and 11 (contaminated land), attached to planning permission ref: 117837/VO/2017

    Decided 3 Jul 2018 Conditions

Timeline

Dates from the published record

  1. 11 Jun 2018

    Received by Manchester

  2. 9 Jul 2018

    Decision issued: Approved

  3. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Manchester granted permission on 9 July 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Manchester

  • 144011/JO/2025 Granted

    271 Oldham Road Manchester M40 7PS

    Variation of planning application 127971/FO/2020 to vary conditions 2 (Specified Plans), 18 (Landscaping), 20 (Noise), and 29 (off site highways) to make elevational alterations, reduce car parking spaces and amend triggers in the conditions

    18 Sep 2025 Amendments
  • OTH-2026-001083 Granted

    Walkers Of Manchester Crabtree Lane Manchester M11 4GU

    Non Material Change to planning permission reference 143419/JO/2025 to allow increase in external floor levels of +100mm, area increase by 3%, roof plan updates following detailed design of PV and Rooflights arrangement, External Wall Louvres added and alterations to boundary treatments and hard landscaping finishes.

    20 Jul 2026 Amendments
  • PLA-2026-001061 Granted

    18 Kempton Road Manchester M19 2GJ

    Variation of Condition 2 (specified plans) attached to Planning Permission 145495/FH/2026 to allow changes to roof form.

    17 Jul 2026 Amendments
  • PLA-2026-000985 Granted

    Sunlight House Seventh & Eighth Floor Quay Street Manchester M3 3JZ

    Variation of condition 2 (Approved Plans) and 5 (Finishes) attached to Listed Building Consent 145027/LO/2026 to reflect internal layout changes and finishes.

    9 Jul 2026 Amendments
  • OTH-2026-001247 Granted

    Birtles House Unit 1 Market Place Civic Centre Manchester M22 5RE

    Non material amendment to planning permission referenced 144669/FO/2025 to allow alterations to the wording of conditions 5 (Metrolink CMP), 7 (electromagnetic compatibility plan), 9 (local labour), 13 (surface water drainage) and 31 (Bird Hazard Management Plan) in order to alter the timescales to facilitate demolition and site clearance works

    5 Aug 2026 Amendments