Planning application
4 Ashwood Avenue Manchester M20 2ZB
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior notification of proposed larger home extension for single storey rear extension with a rearward projection of 4.5 metres, maximum eaves height of 3 metres and total roof height of 4 metres
As published by the council, reference 120180/PDE/2018
Application record
- Reference
- 120180/PDE/2018
- Type
- General Permitted Development-Extensions
- Status
- Decided
- Decision
- Approved extension - GPD
- Received
- 30 May 2018
- Validated
- 30 May 2018
- Decided
- 2 Jul 2018
- Ward
- Didsbury West Ward
- Decision by
- Delegated Decision
- Postcode
- M20 2ZB
Timeline
Dates from the published record
-
30 May 2018
Received by Manchester
-
2 Jul 2018
Decision issued: Approved extension - GPD
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Manchester granted permission on 2 July 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
5 Ashwood Avenue Manchester M20 2YB
Erection of a single storey rear extension to provide additional living accommodation
Granted Householder Extension 10 docsSmall domestic -
729 Princess Road Manchester M20 2LT
Discharge of conditions 5 (Arboricultural Method Statement), 6 (Tree Protection Measures) and 9 (Refuse cycle and Plant Stores) relating to planning approval 117213/FO/2017
Granted Conditions Trees 6 docs -
167 Barlow Moor Road Manchester M20 2ZA
Installation of dropped kerb to create vehicle crossing.
Granted Householder 5 docsSmall domestic -
729 Princess Road Manchester M20 2LT
Application to discharge conditions 3 (materials), 4 (external equipment acoustic insulation) and 8 (landscaping) attached to planning permission reference 117213/FO/2017
Granted Conditions 20 docs -
22 Ashwood Avenue Manchester M20 2ZB
Non Material Amendment to planning permission 128275/FH/2020 to allow elevational alterations
Granted Amendments 6 docs -
22 Ashwood Avenue Manchester M20 2ZB
Erection of single storey side and rear extension with terrace to rear, alterations to porch roof and steps and associated elevational alterations
Granted Householder Extension 10 docsSmall domestic
Other prior approval applications
In Manchester
-
NOT-2026-001023 Granted
38 Overdale Road Manchester M22 4PX
Prior-notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3.6m and a height at eaves of 2.8m.
-
NOT-2026-001230 Decided
25 Brookburn Road Manchester M21 8FF
Prior-notification of proposed larger home extension projecting 5.5m to the rear with a maximum height of 3m and a height at eaves of 2.5m.
-
NOT-2026-000996 Granted
3 Lanreath Walk Manchester M8 8WF
Prior notification of proposed larger home extension projecting 4m to the rear with a maximum height of 3m and a height at eaves of 2.7m.
-
NOT-2026-000987 Granted
23 Beechwood Avenue Manchester M21 8UA
Prior notification of proposed larger home extension projecting 3.4m to the rear with a maximum height of 4m and a height at eaves of 3m.
-
NOT-2026-000886 Granted
Footpath on South Side of Butler Street / Woodward Street Junction, North of 126 Butler Street Manchester M4 7JJ
Prior approval for the siting of a 20m high telecommunications mast, associated antennas, cabinets and ancillary development for a period of 3 years.